For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 243-61 — Sidewalk replacement and new construction

Code of Ordinances, City of Lowell, Massachusetts · Lowell Code of Ordinances § 243-61

Corpus is an independent public-information project, not the official City of Lowell website. Stable reference: corpuslaw.us/code/8a455bb7-8a56-4163-9561-63c809d7f0ed

§ 243-61: Sidewalk replacement and new construction.

A. When excavation work is performed in sidewalk areas, the entire sidewalk will be replaced or newly constructed as follows: (1) Bituminous concrete sidewalks. The entire trench area shall be thoroughly compacted to a point nine inches below the finish grade and shall be dry, uniform and unyielding. Six inches of compacted process gravel subbase shall then be placed, except at driveways where an eight-inch subbase shall be used. Forms shall be installed where deemed necessary to assist in securing proper alignment and adequate compaction of the base and surface courses. The bituminous concrete shall then be laid in two courses to a depth of three inches, each course consisting of 1 1/2 inches. The walk shall have a pitch of 3/16 of an inch per foot of width to provide for proper drainage toward the gutter. The surface of each course shall be rolled with a self-propelled tandem roller weighing not less than 1 1/2 tons nor more than five tons. In places not accessible to a power roller, compaction shall be obtained by means of hand tampers weighing not less than 50 pounds and having a tamping face not exceeding 100 square inches. (2) Concrete sidewalks. The entire trench area shall be thoroughly compacted to a depth of 10 inches below finish grade and shall be dry, uniform and unyielding. Six inches of compacted process gravel subbase shall then be placed, except at driveways where the depth shall be eight inches. Side forms and transverse forms, when in place, shall be smooth, true to line and grade, of sufficient strength to resist springing out of shape and of a depth to conform to the thickness of the proposed walk. The forms shall be clean, well-stacked, properly based and set to the established lines, with the upper edge conforming to the grade of the finished walk, which will have sufficient pitch to the roadway edge of walk to provide for proper drainage, but not to exceed 1/4 of an inch per foot. All forms shall be oiled before placing concrete to a depth of four inches, except at driveways where the depth of concrete shall be six inches. Voids shall be eliminated by thoroughly spading concrete during the pour. Pour sequence shall be every other slab set at thirty-foot limit. Cement concrete shall be air-entrained and have a minimum compressive strength of 2,500 pounds per square inch, except at driveways where it shall be 3,500 pounds per square inch, after 28 days from when it was poured. Score lines should be placed so blocks are of equal areas not less than 12 square feet nor more than 36 square feet and 1/4 inch maximum depth. Concrete shall be tooled at all form edges, edgestones, manholes, catch basins, and all obstructions. Floating, trowling and brushing are as designated by the City Engineer. A liquid membrane curing compound is to be sprayed on immediately following the final finishing. A second coat should follow 30 minutes later. There shall be adequate rain protection until the compound dries. Protection from traffic shall be for three consecutive days. (3) Brick sidewalks. The entire trench area shall be thoroughly compacted to a depth that will ensure a solid base for the type and characteristics of the brick sidewalk to be constructed, e.g.: (a) Rigid brick pavers (mortared in place): the entire trench area shall be thoroughly compacted to a point 15 1/4 inches below the finish grade. Six inches of compacted process gravel subbase shall then be placed, except at driveways where the depth of gravel (in all forms of sidewalks) shall be eight inches. Six inches of rigid concrete base slab (Class D 2500) shall then be placed and shall be reinforced as required by the Commissioner of Public Works or his duly authorized representative. A one-inch wet mortar leveling bed shall then be placed only after the concrete base has set for seven days. Brick pavers shall then be buttered with mortar and pressed into the wet mortar bed. The proper pitch shall be maintained throughout, and it shall be 3/8 inch per foot standard. A maximum distance of 30 feet shall be set for the placement of expansion joints. The concrete base may use a preformed joint, while the three-quarter-inch joint shall be sealed with polyelastomeric sealant (PES). Sealants at completion shall have a clean, smooth, even finish, free from ridges, wrinkles and tool marks. Mortar joints shall be 1/4 inch in width. (b) Brick pavers on dry sand cement mix: the entire trench area shall be thoroughly compacted to a point 7 1/4 inches below the finish grade. Five inches of sand-cement dry mix shall then be placed and compacted. The brick shall then be placed so as to allow a one-quarter-inch joint, at which time a dry sand-cement mix shall be brushed into those joints separating the pavers. Expansion joints shall be placed parallel to curbs and edgings at right angle ninety-degree turns and around obstructions. This rule shall hold for both wet and dry mortar mix application. Expansion joints may be eliminated by the use of dry sand mix applications, as designated by the City Engineer's office. Expansion joints are usually left in place at curbs and walls. After cleaning, the bricked area shall be dampened for three consecutive days with a fine mist spray of water. (c) Flexible brick pavers (mortarless abutted joints): shall be designated to fit usage and subsurface drainage conditions. [1] In areas of slow pedestrian traffic, the entire trench area shall be thoroughly compacted to a point 15 inches below finish grade. Six inches of compacted process gravel subbase shall then be placed eight inches at driveways. Six inches of rigid concrete or asphalt base, as designated by the City Engineer, shall then be placed and reinforced where necessary. Rapid curing cutback asphalt primer shall then be applied over the entire base area, followed by a three-quarter-inch bituminous setting bed. The entire area shall then be covered with a two-percent neoprene tack coat and the brick pavers laid at a three-eighths-inch pitch per foot. [2] Residential driveways should have similar base and subbase restrictions, as noted in the above subsection. A layer of polyprophylene continuous filament fibrous fabric (Mirafi paper) shall then be laid over the base. A one-inch sand setting bed, followed by the brick pavers, shall then be hand placed to assure a uniform joint of one-quarter-inch maximum spacing. The pitch shall not exceed 3/8 inch per foot. [3] Sidewalks and driveways in areas with subsurface drainage problems shall have the entire trench area thoroughly compacted to a point 10 1/4 inches below the finish grade. Six inches of a porous gravel base shall then be laid and compacted. One inch of stone screenings (peastone) shall then cover the entire trench area. A layer of polyprophylene continuous filament fibrous fabric shall be laid, followed by a one-inch sand setting bed, and the brick pavers shall be placed atop this. The gravel base may be eliminated if the stone screenings are increased to a minimum four-inch depth. The pavers should then be laid on edge at driveways perpendicular to the traffic flow and flat at sidewalk areas. [4] Granite curb edging shall be type VA-4 of varying lengths and evenly distributed, as designated by the City Engineer. The width shall be an average of 18 inches and a thickness of six inches. The granite curb shall be laid prior to sidewalk construction at the front of sidewalk in street areas. Curb inlets and curb corner are also included in this section. A grading plan shall be submitted prior to construction and generally a six-inch reveal shall hold unless otherwise designated by the City Engineer. Excavation shall be 18 inches below finish street elevation, and the entire eighteen-inch-wide trench area shall be compacted, dry, uniform and unyielding. In the case of resetting existing stone, the pavement shall be saw cut 12 inches from the face of stone towards the center of street. This shall also be excavated to a depth of 18 inches below street grade and thoroughly compacted to a dry, uniform and unyielding subgrade. Six inches of compacted process gravel shall then be placed. Upon this six-inch gravel foundation, the stone is to be hand placed on the assigned curbline in the trench. Gravel is to be filled around and under the cut of the stone to secure the proper line and grade and assure that the stone will bear throughout. Line and grade shall be as designated on a certified plan that has been submitted to and approved by the City Engineer. All gravel backfill used on both sides of the stone shall be thoroughly compacted with a power-operated tamper. The grade of the trench gravel shall be raised to meet the gravel foundation in the sidewalk area and raised to an elevation of 13 inches from top of stone at the paved street side. A concrete brace six inches thick by 12 inches wide shall be laid along the full length of the granite curb and shall be brought to within seven inches of top of stone on the street side of stone. Asphalt primer shall be spread over the concrete and a one-inch layer of finished bituminous concrete shall then be laid. Asphaltic sealant shall then be applied. Curb joints are to be as close as possible and are to be filled with mortar. Damaged stones and all stones cut less than four feet in length are to be replaced unless otherwise authorized by the City Engineer. They shall be removed by the permit holder and disposed of at the City Engineer's discretion. Any other stone removed belongs to the City and shall be delivered to a City yard by the permit holder, as directed by the City Engineer. Refer to § 243-1 for additional information on lowering or removing edgestone or curbing. [5] Wheelchair ramps. The entire trench area shall be thoroughly compacted to a point 12 inches below the finished elevation of the street pavement. A minimum of six inches of compacted process gravel subbase shall then be placed. Two type VA-4 granite curved curbs of two-foot radius shall be laid to tie into the edge of pavement line so that the point or curvature in the sidewalk is simultaneously set at three feet six inches apart. These stones are to be placed at adjacent sides of the ramp approach. Two lengths of straight granite curb, two feet long, shall then be set perpendicular to the street line and parallel to each other at three feet six inches apart in the sidewalk area at the extension of the curved curb. The overall distance to back of wheelchair ramp from pavement line shall be four feet. The stone shall be set at appropriate reveal on pavement line and shall be flush with the sidewalk elevation at the rear of the ramp. The stone shall act as a form for securing both the concrete driveway ramp and the surrounding sidewalk. The gravel subbase shall now be resloped so that the elevation at street line shall be six inches below pavement grade and the elevation at the back of ramp shall be six inches below sidewalk elevation. This gravel shall be thoroughly compacted to a smooth, dry unyielding slope. A preformed expansion joint shall be set at the rear of the ramp. A concrete driveway shall then be poured so that it conforms to slope and meets the elevation of both the street pavement and the sidewalk at a six-inch depth throughout; an even transition shall ensue. The concrete ramp shall then be held in the same respect as a concrete sidewalk and pertinent construction methods should be adhered to. It is imperative that a nonslip surface be the final result of tooling, trowling and brushing. The expansion joint shall be sealed. It is required that wheelchair ramps be constructed on all corners involved in an intersection. Where wheelchair ramps are constructed on corners it is mandatory that one or more ramps be constructed on the opposite side of the street as shown on an approved plan and/or as deemed necessary by the Commissioner of Public Works. Sidewalks and wheelchair ramps shall be newly constructed and/or reconstructed in conjunction with new construction or reconstruction of commercial buildings as deemed necessary by the Commissioner of Public Works as shown on an approved plan submitted to the Division of Engineering, Department of Public Works. The City Engineer shall review all locations and plans prior to the issuance of a permit.[1] [6] Slope curb. The entire trench area shall be excavated to a depth of 15 inches below the finished pavement grade of a street and be thoroughly compacted to a dry, uniform and unyielding surface. A gravel base shall then be laid and compacted to an eight-inch minimum. Prior to placing stone, the street area shall be completed to the binder course. The binder shall be cut back and excavated six inches from the gutter line into the street area to a depth of 13 1/2 inches. The slope stone shall be placed atop the gravel base to line and grade at an approximate sixty-degree angle from the vertical along the face of the stone. This shall allow a six-inch vertical reveal and a minimum exposed face of slope of 10 1/2 inches. The six-inch-wide trench area shall then be filled with concrete along the entire length of the stone and allowed to set. Gravel shall be simultaneously placed and compacted under and adjacent to the stone to secure the line and grade. The stone shall be allowed to set for three days, then the sidewalk and finished street pavement shall be placed. [7] Bituminous concrete curb. The entire trench area shall be excavated to a depth 15 inches below the finished pavement grade and extend from the pavement line 16 inches into the sidewalk area. This area shall be thoroughly compacted to a dry, uniform and unyielding surface. Eight inches of gravel shall then be placed, followed by four inches of process gravel to a point, when compacted, that lies three inches below finished gutter grade. This gravel shall be a continuation of the road base 16 inches beyond pavement line. The one-and-one-half-inch binder course in the street area shall be carried 16 inches into the sidewalk area. The bituminous concrete berm shall be machine constructed and compacted as approved by the City Engineer. The machine shall be capable of spreading the bituminous mixture to line and grade and to the shape stipulated. Any other deviations as to size, shape, line or grade shall be reviewed by the City Engineer prior to the issuance of a permit. The berm shall have an eight-inch base and eight-and-one-half-inch vertical back and shall have an eight-inch radius on the front face. Upon completion of the berm, the finished top course of street pavement shall be laid to butt into the berm. Sidewalks should tie into the top of berm at the vertical edge. In areas where no sidewalks are to be constructed, 4 1/2 inches of gravel is to be placed four inches below the top of berm and shall make an even transition into the surrounding existing ground elevation. Four inches of loam shall then be laid and shall also conform to existing ground slopes. The area shall be seeded and cared for as per the pertinent section of the Massachusetts specifications. In any area of adverse grade differences, the City Engineer shall designate the pitch of the sidewalk area. A plan shall be submitted to the City Engineer for review prior to the issuance of a permit. [8] Concrete curb edging. Precast concrete curb units shall consist of castings conforming to the size and dimensions shown on the plans. Straight curb shall be cast in standard lengths of six feet. Straight and curved curb may be cast in lengths of not less than four feet where needed and as directed. Curb on a radius of 100 feet or less shall be cast in radius forms to the correct radius (radius measured to the outside face of the curb). Curb shall be made of portland cement types conforming to Section C-1 of the Standard Specifications of Highways and Bridges of the Department of Public Works of the commonwealth. Forms shall be made of metal or concrete (wood not allowed) to tight, rigid construction with true surfaces. Concrete mix shall be made of maximum three-quarter-inch aggregate, with a minimum allowable strength of 3,000 pounds at 28 days. An air entraining agent, either VINSOL NVX or DAREX AEA, or approved equal, shall be added at the mixer in accurately proportioned amounts to give air content to the concrete of not less than 3% and not more than 6% by volume. Upon removal from the forms, the top and eight inches of the face shall be rubbed with a carborundum stone to fully remove any cement enamel finish. No cement may be used in this process. Next, a mixture of fine sand, cement and water shall be thoroughly ground into the surface of the curb with a carborundum stone until the resulting paste fills any imperfections left by the form. A cork float shall then be used to pick up excess paste. The final finish should resemble limestone in appearance. After finishing, the curb shall be cured under a polyethylene blanket or in a humidity curing chamber with minimum humidity of 90%. Curing shall be at a temperature of not less than 60° and for a minimum period of seven days. Temperature shall be held constant during this period regardless of which method of curing is used. Curb shall be set in a trench which shall have been excavated to a width of 18 inches. The subgrade of the trench shall be at a depth below proposed finish grade of the curb equal to six inches, plus the depth of the curbstone. Subgrade shall then be filled to proper level to support curb at final grade. Fill for this purpose shall consist of fine gravel or very course sand thoroughly tamped. Curb units shall then be placed in accurate line, each piece butting the next with maximum joint spacing no larger than 1/4 inch. Final points shall be joined by closure pieces made to order. No curb shall be cut in the field. After alignment, curb shall be carefully backfilled with suitable material. Extreme care shall be taken not to destroy alignment. B. The general conditions for all sidewalks, granite curbing and wheelchair ramps are as follows: (1) In all areas where sidewalks are to be built or granite curb edgestone is to be laid in place, the Commissioner of Public Works, or his duly authorized representative, shall designate the type of City standard sidewalk or granite edgestone applicable, the longitude or lateral run of the brick, the bonding pattern to be used, and the type and dimensions of the brick pavers. Sample bricks shall be submitted to the City Engineer's office prior to the issuance of a permit. (2) In all trench areas, vegetation and organics should be removed and replaced with a suitable foundation material. In areas of no edging, curbing or fixed structures, a grid beam shall be constructed to hold the brick in place. The use of superplasticizing agents may be used in concrete construction, as approved by the City Engineer. (3) Where brick pavers are supplied with lugs, a dry sand-cement mortar mix shall be used and brushed into the joints. The area shall be sprayed with a fine mist of water. (4) No construction of any type sidewalks, or placement of curbing of any type, shall begin without notification, in writing, to the Commissioner of Public Works, followed by a thorough review by the City Engineer and the issuance of a signed permit. (5) Repair, remodeling or resurfacing of existing sidewalks or the resetting of existing curbstone is also subject to the foregoing regulations and is prohibited without the issuance of a permit signed by the Commissioner of Public Works. Permits are to be on site in the possession of the foreman and to be shown on request. (6) No sidewalks of any kind shall be installed when the temperature falls below 40° F. nor after 2:30 p.m., except at the discretion of the City Engineer. Before the installation of any sidewalks, all structures such as pull boxes, light bases and conduits shall be completely installed and all street hardware adjusted. (7) Compaction at all types of sidewalks shall be in six-inch lifts to a ninety-five-percent modified proctor density at optimum moisture content. Tests may be ordered by the City Engineer at the permit holder's expense. (8) If forms are directed to be used for any type of sidewalk, they shall not be removed for 24 hours following sidewalk completion. Under no conditions shall any bar, pick or any other tool be used that depends upon leverage on any part of the finished sidewalk for form removal. (9) All materials used shall meet AASHO standards, as designated, unless otherwise directed by the City Engineer. (10) There shall be no hindrance to the normal flow of street drainage at any time except under necessary and/or temporary construction procedures. (11) No ramps, transitions or driveways shall be built in lieu of dropping the curbstone, nor shall they extend into the paved street area so that normal gutter line flow is obstructed. (12) Refer to plans titled "Sidewalk Specs" on record in the office of the City Engineer (Sewer Draw No. 3, Plans 1, 2 and 3). (13) No more than 150 feet of sidewalk shall be made unpassable during the normal working hours, and a thirty-foot limit shall be set for any unpassable areas left overnight. Temporary passage shall be accomplished by the use of barricades and bridging over any excavation. The use of lights, signs and traffic officers, where deemed necessary, shall be decided by the City Engineer. (14) Temporary access shall be provided at all times to all driveways and sidewalk entrances for the use of the resident and commercial owners. (15) Construction methods shall conform to the Massachusetts Standard Specifications for Highways and Bridges 1973 and/or Technical Notes of Brick Construction, Sections 14, 14(a) and 14(b), and any and all sections as printed by the Brick Institute of America 1975. The City Engineer shall deem which sections are to apply to the situation according to sound construction methods of any text. In case of conflict between these documents, the City Engineer's decision shall be final and binding. (16) No permits involving excavation in sidewalk and street areas are to be issued from November 15 to April 1, except when deemed necessary by the Commissioner of Public Works. No permits are to be issued without prior proof to the Commissioner of Public Works of possession of a certificate for a street opening permit bond in the amount of not less than $25,000 or, in the discretion of the Commissioner of Public Works, an amount equal to the amount of the project contract. The Commissioner of Public Works, or his duly authorized agent, is authorized to limit the amount of project work proportional to the amount of bonding.

[Amended 7-8-2003 ]

Ask a question about Lowell law

Corpus searches the Lowell sections it holds and shows the ones that match, with their citations. Free, no sign-in.