§ 94-7.4 — Solar energy systems
Revised Ordinances of the City of Medford, Massachusetts (Codified through Ordinance No. 889, adopted April 16, 2024. (Supp. No. 18)) · Medford Revised Ordinances § 94-7.4
Corpus is an independent public-information project, not the official City of Medford website. Stable reference: corpuslaw.us/code/e91f0a51-f877-436e-9119-78b2bd690946
Sec. 94-7.4. - Solar energy systems.
94-7.4.1 Definitions. See section 94-12.0, "Solar energy system". 94-7.4.2 Projects Requiring Solar Energy System. The following projects shall include a solar energy system that is equivalent to a minimum of 50 percent of the roof area of all buildings. In cases where a site includes an uncovered parking structure the structure shall also have a solar energy system installed to cover a minimum of 90 percent of its top level. These projects are: 1. Residential projects containing ten or more units; including conversions of existing dwellings to contain ten or more units. 2. Nonresidential or residential projects which involve new construction of 10,000 square feet or more of floor area, or the addition of 10,000 square feet or more of gross floor area. 3. Projects which involve a change in practical use of an existing building containing 10,000 square feet or more of floor area. 4. Nonresidential or residential projects which involve the substantial rehabilitation of a structure containing 10,000 square feet or more of floor area, or the addition of 10,000 square feet or more of gross floor area. "Substantial rehabilitation" shall mean expenditure of more than 50 percent of the appraised value of the structure for such work. 94-7.4.3 Solar Energy System Assessment. A solar assessment shall be submitted and the assessment must include, at a minimum: 1. An analysis for solar energy system(s) for the site detailing layout and annual production. 2. Include the maximum feasible solar zone area of all structures and potential ground-mounted canopies. 3. An initial solar energy system assessment shall be submitted with the required application for site plan review under section 94-11.7. 4. A final solar installation plan must be reviewed and approved by the director of energy and environment prior to the issuance of a building permit. 94-7.4.4 Exemptions. A project will not be required to install a solar energy system on the roof when there is no solar ready zone, or the solar-ready zone is shaded for more than 50 percent of daylight hours annually, or for building conversions with insufficient structural load capacity. Further, in the case of a mixed or ground-mounted installation the requirement may be reduced or waived if the assessment determines there is not a viable location to meet the solar requirement. The determination of the applicability of exemption shall be within the discretion of the director of energy and environment prior to the issuance of a building permit. 94-7.4.5 Location. Emergency access. Solar energy systems shall be located in such a manner as to ensure emergency access to the roof, provide pathways to specific areas of the roof, provide for smoke ventilation opportunities, and provide emergency egress from the roof, as required by the MA Fire Code, as updated. 94-7.4.6 Safety. No roof-mounted solar energy system shall be located in a manner that would cause the shedding of ice or snow from the roof into a porch, stairwell or pedestrian travel area.
Ask a question about Medford law
Corpus searches the Medford sections it holds and shows the ones that match, with their citations. Free, no sign-in.
