§ 94-7.7 — Wireless telecommunications facility (WTF)
Revised Ordinances of the City of Medford, Massachusetts (Codified through Ordinance No. 889, adopted April 16, 2024. (Supp. No. 18)) · Medford Revised Ordinances § 94-7.7
Corpus is an independent public-information project, not the official City of Medford website. Stable reference: corpuslaw.us/code/f889e3b6-cc88-4605-bca7-8b4da563ed99
Sec. 94-7.7. - Wireless telecommunications facility (WTF).
94-7.7.1 Purpose. The purpose of this section is to establish regulations and procedures for wireless telecommunications facilities (WTF) so as to allow and encourage such uses in the City of Medford with minimal harm to the public health, safety, and general welfare. Specifically, the purposes of this section are to: 1. Protect and preserve the visual and civic quality of the city, including, but not limited to, the scenic, historic, environmental, natural and man-made resources, residential areas and land uses from potential adverse impacts of wireless communications facilities; 2. Encourage the location of telecommunications facilities in nonresidential areas; 3. Minimize the overall number and height of such facilities throughout the community; 4. Encourage facilities to be located in areas where the adverse impact will be minimal on adjacent properties and residential neighborhoods; 5. Encourage facilities to be configured in ways that minimize the adverse visual impact of the facilities through careful design, siting, landscape screening, and innovative camouflaging techniques; 6. Enhance the ability of the providers of WTF to provide such services to the community quickly, effectively, and efficiently; 7. Avoid potential damage to adjacent properties from tower and antenna failure through sound engineering and careful siting of structures; and 8. Guide sound development while promoting the health, safety and general welfare of the City of Medford consistent with all applicable local, state, and federal laws. 94-7.7.2 Applicability. The provisions of other sections of this chapter notwithstanding, the regulations and restrictions set forth herein shall apply to the placement, construction, installation, modification, monitoring and removal of wireless telecommunications facilities. No WTF shall be placed, constructed, installed, or modified within the City of Medford on or after the date of enactment of this section, except in accordance with the provisions of this section. 1. Facilities permitted by right. A concealed WTF may be installed in a structure on a lot in a nonresidential district provided all the requirements for a building permit are met. 2. Facilities by special permit. All other WTFs shall require the issuance of a special permit by the zoning board of appeals, referred to in this section as the special permit granting authority (SPGA). 94-7.7.3 Exemptions. The following shall be exempt from the provisions of this section: 1. Amateur radio towers used in accordance with the terms of any amateur radio service license issued by the Federal Communications Commission, provided that: (1) the tower is not used or licensed for any commercial purpose; (2) the tower must have a cost or replacement value of less than $10,000.00; and (3) the tower must be removed if the use is discontinued for six months or longer. 2. Communications facilities used for the purposes set forth in M.G.L.A. c. 40A, § 3. 3. Facilities used for noncommercial city or state public safety purposes. 4. Licensed commercial mobile radio services primarily used in support of the licensee's own business purpose, provided that (i) such services are not used as a dispatching or communication service for third parties and (ii) any facilities used in connection therewith may not exceed the maximum height allowed under section 94-4.0. Examples include, but are not necessarily limited to: commercial mobile radio services used by a taxi or limousine company to communicate with its vehicles and repair, service, delivery, towing and fuel delivery companies communicating with their respective vehicles. 94-7.7.4 Location. WTFs shall be located according to the following priorities. Applicants shall demonstrate that they have investigated locations higher in priority ranking than the one for which they are applying and whether such sites are available and, if applicable, under what conditions. The priorities are: 1. Within an existing structure concealed. 2. On industrial or commercially zoned land. 3. Within an existing structure and camouflaged. 4. Camouflaged on an existing structure, such as but not limited to an existing electric transmission tower or an existing radio antenna, a water tower, or building, and of a compatible design. 5. Co-located with an existing WTF. 6. On City of Medford owned land which complies with other requirements of this section and where visual impact can be minimized and mitigated. 7. If adequately demonstrated to the SPGA in the special permit process that each of the priorities set forth above is not feasible, erection of a new facility that complies with the other requirements of this section and where visual impact can be minimized and mitigated. 94-7.7.5 Height. Towers and/or mountings shall be designed to structurally accommodate the maximum number of foreseeable users (within a ten-year period) technically practical; 1. Ground-mounted facilities. The maximum height of a ground mounted WTF shall not exceed 100 feet. 2. Roof-mounted facilities. A roof-mounted WTF shall not project more than 15 feet above the height of the building or structure on which they are mounted nor project more than 15 feet above the height limit of the zoning district within which the facility is located, whichever is less. 3. Side-mounted facilities. A side-mounted WTF shall not project above the parapet of the building or top of any wall or structure on which they are mounted. 4. Side and roof-mounted WTFs shall not be allowed on a building or structure of less than two stories. 94-7.7.6 Setbacks. 1. Ground-mounted facilities. Any new ground mounted WTF shall be set back at least one time the height of the WTF plus ten feet from each lot line of the site on which the WTF is located. 2. Non-concealed antenna. Any non-concealed antenna shall be set back at least one time the height of the antenna, as measured from the ground level, from each lot line of the site on which the antenna is located. However, if the antenna is being attached to an existing tower whose setback is already approved, either by right, by special permit or by variance, and if the SPGA determines that the addition of the antenna does not materially alter the basis of that prior approval, then no new, independent setback requirement shall be created by the addition of the antenna. 3. Reduction of setback. In nonresidential districts or on City of Medford owned land, the SPGA may grant a special permit to allow a lesser setback if it makes a finding that such lesser setback provides adequate safety, promotes co-location or improves design, and Is consistent with and not in derogation of the size, scale, and design of other structures in the neighborhood and eliminates and mitigates against development impacts on adjacent residential uses and neighborhoods. 94-7.7.7 Screening and Landscaping. 1. Existing on-site vegetation shall be preserved to the maximum extent practical. 2. To the maximum extent feasible, facilities shall minimize adverse visual effects on the environment. The SPGA may impose reasonable conditions to ensure this result, including landscaping, painting, and lighting standards. 3. Satellite dishes and/or antennas shall be situated on a structure in the least obtrusive location feasible, preferably with limited visibility from abutting streets. 94-7.7.8 Miscellaneous Standards. 1. To the maximum extent feasible, all network interconnections from the communications site shall be via underground lines. 2. Traffic associated with the WTF shall not adversely affect abutting ways. 3. Night lighting of any WTF shall be prohibited unless required by the Federal Aviation Administration. 4. There shall be no signs associated with facilities, except for small instructional signs, "No Trespassing" signs, and a required sign giving a phone number where the owner can be reached on a 24-hour basis. All signs shall conform to the provisions of section 94-6.2 of this chapter. 5. Roof-mounted personal wireless service facilities shall not individually or in the aggregate have a front surface area facing surrounding streets and adjacent properties that exceeds 50 square feet in area. 94-7.7.9 Prohibitions. The following shall be prohibited: 1. Lattice style towers, guyed towers and other WTFs requiring three or more legs and/or guy wires for support shall not be allowed. 2. Advertising signs shall not be allowed. 3. Fences using razor wire or barbed wire or similar types shall not be allowed. 4. A WTF shall not be located on a nonconforming building or structure, unless zoning relief is granted to extend, alter or change the building or structure in accordance with M.G.L.A. c. 40A, § 6 and section 94-5.0 of this chapter. 94-7.7.10 Justification of Need. The following standards shall apply in the issuance of any special permit for a WTF and shall be prepared by a licensed professional engineer: 1. Coverage area. The applicant shall provide a map of the geographic area in which the proposed facility will provide adequate coverage. 2. Adequacy of other facility sites controlled by the applicant. The applicant shall provide written documentation of any facility sites in the city and in abutting towns or cities in which it has a legal or equitable interest, whether by ownership, leasehold or otherwise. Said documentation shall demonstrate that these facility sites do not already provide, or do not have the potential to provide by site adjustment, adequate coverage. 3. Capacity of existing facility sites. The applicant shall provide written documentation that it has examined all facility sites located in the town and in abutting towns in which the applicant has no legal or equitable interest to determine whether those existing facility sites can be used to provide adequate coverage. 4. Adequate coverage through the least disruptive means. The applicant shall provide written documentation that the proposed facility uses the least disruptive technology (through the use of repeaters or other similar technology as it may be developed subsequent to adoption of this section) in which it can provide adequate coverage in conjunction with all facility sites listed above. 94-7.7.11 Application; Procedures. The applicant or co-applicant for any permit for a WTF must be a licensed carrier who has authority from the FCC to provide wireless communications services for the facility being proposed. The applicant shall submit documentation of the legal right to install and use the proposed facility mount at the time of the filing of the application for the permit and the following additional information: 1. A color photograph or rendition of the proposed equipment and mountings. A rendition or computer-simulated photograph shall also be prepared illustrating the WTF at the proposed location, viewed from at least two prominent locations along the surrounding rights-of-way. 2. A description of the proposed equipment and mountings. 3. A justification of need, as defined in section 94-7.1.10 above. 4. Confirmation that the WTF complies with all applicable federal and state standards. 5. A description of the capacity of the WTF, including the number and type of panels, antennas and/or transmitter receivers that it can accommodate and the basis for these calculations. 6. A map and list describing all of the applicant's current and expected future sites for WTFs in the city. 7. A locus plan at a scale of 1" = 40' showing the exact location of the proposed WTF and all property lines, streets, landscape features, residential dwellings, and buildings within 300 feet of the facility. 94-7.7.12 Regulations. The SPGA shall maintain a set of regulations that contains the necessary policies, procedures, and standards to implement the provisions of this section. 94-7.7.13 Special Permit Criteria. A special permit shall be granted under this section only if the SPGA shall find that the project is in harmony with the general purpose and intent of this section and the SPGA's regulations. In addition, the SPGA shall make the findings required by section 94-11.6 of this chapter and the following additional findings: 1. That the applicant is not already providing adequate coverage or is unable to maintain adequate coverage without the special permit; 2. That the applicant is not able to use existing facility sites either with or without the use of repeaters to provide adequate coverage; 3. That the proposed WTF minimizes any adverse impact on historic resources, scenic views, residential property values, and natural or man-made resources; 4. That the applicant has agreed to implement all reasonable measures to mitigate the potential adverse impacts of the facilities; 5. That the WTF shall comply with the appropriate FCC regulations regarding emissions of electromagnetic radiation and that the required monitoring program is in place and shall be paid for by the applicant; and 6. That the applicant has agreed to rent or lease available space on any tower it controls within Medford or its contiguous towns, under the terms of a fair market lease, without discrimination to other wireless service providers. 94-7.7.14 Conditions. If a special permit is granted, in addition to such terms and conditions as may be authorized by section 94-11.6 of this chapter, the SPGA may impose such additional conditions and safeguards as public safety, welfare and convenience may require. 94-7.7.15 Denial. Any decision by the SPGA to deny a special permit under this section shall be in conformance with the Telecommunications Act, in that it shall be in writing and supported by substantial evidence contained in a written record. 94-7.7.16 Term of Permit. In its informed discretion, the SPGA may limit the special permit to a fixed or conditional period of time as it may determine appropriate. At the end of the approved time period, the facility shall be removed by the carrier or a new special permit shall be required. 94-7.7.17 Report. All permitted and special permitted wireless communications facility carriers shall periodically file with the SPGA, every five years (or sooner if specified in a special permit), on operational aspects of the facility including: power consumption; power radiation; frequency transmission; the number, location, and orientation of antennas; and types of services provided. 94-7.7.18 Removal Requirements. Any WTF that ceases to operate for a period of one year shall be removed. Cease to operate is defined as not performing the normal functions associated with the WTF and its equipment on a continuous and ongoing basis for a period of one year. At the time of removal, the facility site shall be remediated such that all WTFs that have ceased to operate are removed. If all ground mounted facilities have ceased to operate, the mount (including the foundation) shall also be removed and the site shall be revegetated by the owner. Existing trees shall only be removed if necessary to complete the required removal. The applicant shall, as a condition of the special permit, provide a financial surety or other form of financial guaranty acceptable to the SPGA, to cover the cost of removal of the facility and the remediation of the landscape, should the facility cease to operate.
Ask a question about Medford law
Corpus searches the Medford sections it holds and shows the ones that match, with their citations. Free, no sign-in.
