4900. - WIRELESS COMMUNICATIONS FACILITIES (WCF).

4910. Purpose. The purpose of this Section is to establish procedures for establishment of wireless communications facilities (a) by safe and appropriate siting consistent with the Telecommunications Act of 1996, while (b) minimizing visual impacts from such facilities on residential districts and scenic areas within New Bedford. 4920. Location. WCF may be allowed by special permit in all districts. No WCF shall be erected or installed except in compliance with the provisions of this Section. 4930. Submittal Requirements. As part of any application for a special permit, applicants shall submit the information required for site plan review, as set forth herein at Section 5400. Applicants shall also provide: 4931. A description of the capacity of the facility, including the number and types of antennas that it can accommodate and the basis for the calculation of capacity. 4932. Documentation evidencing that providers of WCS intend to co-locate on the facility. 4933. Documentation that the applicant is unable to co-locate on an existing or approved facility. 4934. Documentation that the facility complies with all requirements of the Federal Aviation Administration and City of New Bedford, including but not limited to lighting and airport approach zone encroachments. 4935. Documentation evidencing that the facility is designed to be the minimum height necessary to accommodate the anticipated and future users. 4936. Documentation certifying that the proposed WCF will meet all applicable FCC and state health and environmental standards. 4937. A structural engineering certification, signed by a registered professional engineer, certifying the structural integrity of the proposed facility and all components thereof (including but not limited to the tower, base, supports and attachments). The Zoning Board of Appeals may accept engineering certification(s) from the manufacturer of the components of any facility in lieu of certification by a registered engineer. 4938. The City may retain a technical expert at the expense of the applicant in the appropriate field of engineering to verify any of the information contained in the submissions required herein. 4940. Special Permit. A WCF may be erected upon the issuance of a special permit by the Zoning Board of Appeals if the Board determines that the adverse effects of the proposed facility will not outweigh the need for the WCF, in view of the particular characteristics of the site and of the proposal in relation to that site. The determination shall include consideration of each of the following: 4941. Communication needs served by the facility; 4942. Traffic flow and safety, including parking and loading; 4943. Impact on neighborhood character, including aesthetics; 4944. Impacts on the natural environment, including visual impacts; 4945. Potential fiscal impact, including impact on City services, tax base, and employment; 4946. New facilities shall be considered only upon a finding that existing or approved facilities cannot accommodate, or reasonably be made to accommodate, the equipment planned for proposed facilities. 4950. Conditions. All WCF shall be subject to the following conditions: 4951. To the extent feasible, the facility shall be designed and constructed so it is capable of accommodating co-location. Facilities shall be designed to structurally accommodate foreseeable users (within a ten-year period), including wireless services providers and local Police, Fire and Ambulance companies, unless the applicant demonstrates to the Zoning Board of Appeals that it is technically infeasible to do so. 4952. The height of any facility shall not exceed the height restrictions of the zoning district within which the facility is to be located absent a specific finding by the Board, in addition to any finding required under Section 4940, that such additional height is necessary to meet the needs of the facility and/or the City. Existing ground elevations may not be altered or distorted in order to achieve additional height. 4953. Freestanding facilities shall be set back from the nearest residential dwelling by a minimum distance equal to the height of the facility (as measured to its highest point, including antennas, etc.) and further, said WCF shall not be located closer than twenty-five (25) feet from any street or lot line. 4954. WCF may be placed upon or inside existing buildings or structures, including water tanks and towers, church spires, electrical transmission towers, and the like. In such cases, the facility height shall not exceed two (2) feet above the height of the existing structure or building. 4955. All structures associated with WCF shall be removed within one year of cessation of use at the expense of the applicant. The Board of Appeals may require a performance guarantee to effect this result, including a bond of an amount to be determined by the Board of Appeals. 4956. To the extent feasible, all network interconnections from the communications facility shall be via land lines. 4957. Existing on-site vegetation shall be preserved to the maximum extent feasible. 4958. The facility shall minimize, to the extent feasible, adverse visual effects on the environment. The Zoning Board of Appeals may impose reasonable conditions to ensure this result, including painting, lighting standards, landscaping, and screening. 4959. Traffic associated with the facility shall not adversely affect public ways. 4959A. Fencing may be required to control unauthorized entry to the WCF. 4959B. No interference to existing broadcast television, cable television, or radio signals, including emergency systems and public safety communications, shall be permitted from the WCF or components thereon. If interference occurs, the applicant must remedy the interference within the time period affixed by the Zoning Board of Appeals. 4959C. The Zoning Board of Appeals may require an applicant to pay for costs incurred by the Board to review the application for a WCF. These costs may include, without limitation, engineering, planning, technical or legal consulting services necessary for review purposes.

(Ord. of 12-23-03, § 1) (Ord. of 12-23-03, § 1) (Ord. of 12-23-03, § 1; Ord. of 1-27-14, § 2) (Ord. of 12-23-03, § 1; Ord. of 1-27-14, § 3) (Ord. of 12-23-03, § 1; Ord. of 1-27-14, § 4, 5)