§ 24-5 — Review and Approval of Erosion and Sediment Control Plans

Code of the City of Frederick, Maryland (Codified through Ordinance No. G-26-1, adopted April 2, 2026. (Supp. No. 112, 8-26)) · Frederick City Code § 24-5

Corpus is an independent public-information project, not the official City of Frederick website. Stable reference: corpuslaw.us/code/2fd256c6-d20b-4a24-b55c-20f6975c3dc9

Sec. 24-5. - Review and Approval of Erosion and Sediment Control Plans.

(a) Required. A person must submit an erosion and sediment control plan and supporting computations to the City and to the SCD and obtain approval of the SCD before obtaining a permit to clear or grade land. The SCD shall review the plan to determine compliance with this article and the Standards and Specifications prior to approval. The plan shall serve as a basis for all subsequent grading and stabilization. (b) General process. The review and approval process shall be in accordance with the comprehensive and integrated plan approval process described in the Standards and Specifications, the Ordinance, and the Act. (c) Concept plans. At a minimum, a concept plan must include the mapping of natural resources and sensitive areas including highly erodible soils and slopes greater than 15 percent as well as information required under the Ordinance. These areas are to remain undisturbed or an explanation must be included with either the concept or site development plan describing enhanced protection strategies for these areas during construction. (d) Integration with stormwater management. A site development plan submittal must include all concept information and indicate how proposed erosion and sediment control practices will be integrated with proposed stormwater management practices. The latter must be done through a narrative and an overlay plan showing both ESD and erosion and sediment control practices. An initial sequence of construction and proposed project phasing to achieve the grading unit restriction should be submitted at this time. (e) Final plan. An applicant shall submit a final erosion and sediment control plan to the SCD for review and approval. The plan must include all of the information required by the concept and site development plans as well as any information in § 24-6 not already submitted. (f) Action on plans. The SCD shall notify the applicant of approval or reasons for disapproval or modification within thirty (30) business days after submission of the completed erosion and sediment control plan. If a decision is not made within thirty (30) business days, the SCD shall inform the applicant of the status of the review process and the anticipated completion date. The plan shall not be considered approved without the inclusion of the signature and date of signature of an authorized agent of the SCD on the plan. (g) Conditions. In approving a plan, the SCD may impose such conditions as may be deemed necessary to ensure compliance with the provisions of this article, the State Sediment Control Regulations, COMAR 26.17.01, the Standards and Specifications, or the preservation of public health and safety.

(Ord. No. G-13-11, § II, 4-18-13)

Ask a question about Frederick law

Corpus searches the Frederick sections it holds and shows the ones that match, with their citations. Free, no sign-in.