§ 24-6 — Contents of Erosion and Sediment Control Plans
Code of the City of Frederick, Maryland (Codified through Ordinance No. G-26-1, adopted April 2, 2026. (Supp. No. 112, 8-26)) · Frederick City Code § 24-6
Corpus is an independent public-information project, not the official City of Frederick website. Stable reference: corpuslaw.us/code/913d60ed-7c97-4b39-9ca4-371931f325d9
Sec. 24-6. - Contents of Erosion and Sediment Control Plans.
(a) Application. An applicant is responsible for submitting erosion and sediment control plans that meet the requirements of the SCD, this chapter, the Ordinance, the Standards and Specifications, and the Act. The erosion and sediment control plan shall include sufficient information to allow the SCD to evaluate the environmental characteristics of the affected areas, the potential impacts of the proposed grading on water resources, and the effectiveness and acceptability of measures proposed to minimize soil erosion and off-site sedimentation. (b) Minimum application requirements. At a minimum, the applicant shall submit a letter of transmittal and an application including the following: (1) A vicinity map indicating north arrow, scale and other information necessary to easily locate the property; (2) Name, address and telephone number of: (A) The owner of the property where the grading is proposed; (B) The developer; and (C) The applicant; (3) Drainage area map(s) at a 1″ = 200′ minimum scale showing existing, interim, and proposed topography, proposed improvements, standard symbols for proposed sediment control features, and pertinent drainage information including provisions to protect downstream areas from erosion for a minimum of two hundred (200) feet downstream or to the next conveyance system; (4) The location of natural resources, wetlands, floodplains, highly erodible soils, slopes fifteen (15) percent and steeper, and any other sensitive areas; (5) A general description of the predominant soil types on the site, as described by the appropriate soil survey information available through the SCD or the USDA Natural Resources Soil Conservation District; (6) Proposed stormwater management practices; (7) Erosion and sediment control plans including: (A) The existing topography and improvements as well as proposed topography and improvements at a scale between 1″ = 10′ and 1″ = 50′ with two-foot contours or other approved contour interval. For projects with more than minor grading, interim contours may also be required; (B) Scale, project and sheet title, and north arrow on each plan sheet; (C) The limit of disturbance including: (i) Limit of grading (grading units, if applicable); and (ii) Initial, interim, and final phases; (D) The proposed grading and earth disturbance including: (i) Total disturbed area; (ii) Cut and fill quantities; and (iii) Volume of borrow and spoil quantities. (E) Storm drainage features, including: (i) Existing and proposed bridges, storm drains, culverts, outfalls, etc.; (ii) Velocities and peak flow rates at outfalls for the two-year and ten-year frequency storm events; and (iii) Site conditions around points of all surface water discharge from the site. (F) Erosion and sediment control practices to minimize on-site erosion and prevent off-site sedimentation including: (i) The salvage and reuse of topsoil; (ii) Phased construction and implementation of grading unit(s) to minimize disturbances, both in extent and duration; (iii) Location and type of all proposed sediment control practices; (iv) Specifications for temporary and permanent stabilization measures including, at a minimum: (a) The "Standard Stabilization Note" on the plan stating: "Following initial soil disturbance or re-disturbance, permanent or temporary stabilization must be completed within: (1) Three (3) calendar days as to the surface of all perimeter dikes, swales, ditches, perimeter slopes, and all slopes greater than 3 horizontal to 1 vertical (3:1); and (2) Seven (7) calendar days as to all other disturbed or graded areas on the project site not under active grading. (G) Sequence of construction describing the relationship between the implementation and maintenance of controls, including permanent and temporary stabilization and the various stages or phases of earth disturbance and construction. Any changes or revisions to the sequence of construction must be approved by the SCD. The sequence of construction shall, at a minimum, include the following: (i) Request for a pre-construction meeting with the appropriate enforcement authority; (ii) Clearing and grubbing as necessary for installation of perimeter controls; (iii) Construction and stabilization of perimeter controls; (iv) Remaining clearing and grubbing within installed perimeter controls; (v) Road grading; (vi) Grading for the remainder of the site; (vii) Utility installation and connections to existing structures; (viii) Final grading, landscaping and stabilization; (ix) Installation of stormwater management measures; (x) Approval of the appropriate enforcement authority prior to removal of sediment controls; and (xi) Removal of controls and stabilization of areas that are disturbed by removal of sediment controls. (H) A statement requiring the owner or the developer to contact the SCD at the following stages of the project or in accordance with the approved erosion and sediment control plan, the grading permit, or building permit. (i) Prior to the start of earth disturbance; (ii) Upon completion of the installation of perimeter erosion and sediment controls, but before proceeding with any other earth disturbance of grading; (iii) Prior to the start of another phase of construction or opening of another grading unit; and (iv) Prior to the removal of sediment control practices; (I) Certification by the owner or developer that any clearing, grading, construction or development will be done pursuant to the approved erosion and sediment control plan and that responsible personnel involved in the construction project have certification of training at an MDE approved training program for the control of sediment and erosion before beginning the project. The certification of training for responsible personnel requirement may be waived by the SCD on any project involving four (4) or fewer residential lots. Additionally, the owner or developer shall allow right of entry for periodic on-site evaluation by the SCD, Building Department, Engineering Department, or MDE; and (J) Certification by a professional engineer, land surveyor, landscape architect, or forester (for forest harvest operations only) registered in the State that the plans have been designed in accordance with erosion and sediment control laws, regulations, and standards, if required by the SCD or the Administration. (K) Any additional information or data deemed appropriate by the SCD.
(Ord. No. G-13-11, § II, 4-18-13)
Ask a question about Frederick law
Corpus searches the Frederick sections it holds and shows the ones that match, with their citations. Free, no sign-in.