§ 8-11 — Inspections
Code of the City of Gaithersburg, Maryland (Codified through Ordinance No. O-08-26, adopted September 8, 2026. (Supp. No. 52)) · Gaithersburg City Code § 8-11
Corpus is an independent public-information project, not the official City of Gaithersburg website. Stable reference: corpuslaw.us/code/aeea9add-d993-4ee4-9176-32a27ecfec2c
Sec. 8-11. - Inspections.
The administration, or the city, if delegated enforcement authority, is responsible for the inspection and enforcement of all land disturbing activities, including those sites requiring an erosion and a sediment control plan as specified by this article. This enforcement authority may be delegated to the city through a request by the city or required as a condition of the city's NPDES MS4 permit from the administration. (1) Inspection frequency and reports. (i) The owner/developer shall maintain a copy of the approved erosion and sediment control plan on site. (ii) Every active site having a designed sediment control plan shall be inspected for compliance with the plan. (iii) A written report shall be prepared by the inspection agency after every inspection. The report shall describe: a. The date and location of the site inspection; b. Whether the approved plan has been properly implemented and maintained; c. Practice deficiencies or erosion and sediment control plan deficiencies; d. If a violation exists, the type of enforcement action taken; and e. If applicable, a description of any modifications to the plan. (iv) The city shall notify the on-site personnel or the owner/developer in writing when violations are observed, describing: a. The nature of the violation; b. The required corrective action; and c. The time period in which to have the violation corrected. (2) Right of entry. It shall be a condition of every site or building permit that the city has the right to enter property periodically to inspect for compliance with the approved plan and this article. (3) Modifications to erosion and sediment control plans. When inspection of the site indicates the approved erosion and sediment control plan needs modification, the modification shall be made in compliance with the erosion and sediment control criteria contained in the standards and specifications and COMAR 26.17.01.09(H) as follows: (i) The permittee shall submit requests for major modifications to approved erosion and sediment control plans, such as the addition or deletion of a sediment basin, to the plan approval agency to be processed appropriately. This processing includes modifications due to plan inadequacies at controlling erosion and sediment as revealed through inspection; and (ii) The inspector may approve minor modifications to approved erosion and sediment control plans in the field if documented on a field inspection report. The plan approval agency shall, in conjunction with the inspection agency, develop a list of allowable field modifications for use by the inspector. (4) Complaints. The city shall accept and investigate complaints regarding erosion and sediment control concerns from any parties and at a minimum: (i) Conduct an initial investigation within forty-eight (48) hours from receipt of the complaint; (ii) Notify the complainant of the initial investigation and findings within seven (7) days from receipt of the complaint; and (iii) Take appropriate action when violations are discovered during the course of the complaint investigation.
(Ord. No. O-03-25, 4-21-25)
Ask a question about Gaithersburg law
Corpus searches the Gaithersburg sections it holds and shows the ones that match, with their citations. Free, no sign-in.
