§ 8-7 — Erosion and sediment control plans
Code of the City of Gaithersburg, Maryland (Codified through Ordinance No. O-08-26, adopted September 8, 2026. (Supp. No. 52)) · Gaithersburg City Code § 8-7
Corpus is an independent public-information project, not the official City of Gaithersburg website. Stable reference: corpuslaw.us/code/44f4a16b-2688-4cb6-8a03-aec4ed92365d
Sec. 8-7. - Erosion and sediment control plans.
(a) Review and approval of erosion and sediment control plans. (1) A person may not clear or grade land without first obtaining an erosion and sediment control plan approved by the city. (2) Clearing and grading of sites greater than five (5) acres of land must be phased to minimize the total amount of disturbed land on the site at any one time. (3) The applicant shall submit erosion and sediment control plans and any supporting computations to the city for review and approval. The erosion and sediment control plans shall contain sufficient information, drawings, and notes to describe how soil erosion and off-site sedimentation will be minimized. The city shall review the plans to determine compliance with this article and the standards and specifications prior to approval. The plans shall serve as a basis for all subsequent grading and stabilizing, and clearing and grading contrary to the plan is prohibited. (4) The review and approval process shall be in accordance with the comprehensive and integrated plan approval process described in this chapter, the standards and specifications and the Maryland Stormwater Design Manual. (5) At a minimum, a concept erosion and sediment control plan must include the mapping of natural resources and sensitive areas including highly erodible soils and slopes greater than fifteen (15) percent, wetlands and wetland buffers and floodplain boundaries, and forest stands, as well as information required under chapter 8 of the Code. These areas are to remain undisturbed, or an explanation must be included with either the concept or preliminary plan describing enhanced protection strategies for these areas during construction. (6) A preliminary sediment and erosion control plan submittal must include all concept plan information and indicate how proposed erosion and sediment control practices will be integrated with proposed stormwater management practices. The latter is to be done through a narrative and an overlay plan showing both ESD and erosion and sediment control practices. An initial sequence of construction and proposed project phasing to achieve the grading unit restriction should be submitted with the site development plan. (7) An applicant shall submit a final erosion and sediment control plan to the city for review and approval. The plan must include all of the information required by the concept and preliminary plans as well as any information in section 8-6 of this chapter not already submitted. (8) The city shall notify the applicant of approval or reasons for the disapproval or modification within forty-five (45) days after submission of the erosion and sediment control plan. If a decision is not made within forty-five (45) days, the city shall inform the applicant of the status of the review process and the anticipated completion date. (9) A final erosion and sediment control plan shall not be considered approved without the inclusion of the signature and date of signature of the city on the plan. (10) Approved plans remain valid for three (3) years from the date of approval unless extended or renewed by the city. Approved plans shall expire on the same date of the expiration of the associated final site plan or amendment to final site plan. A new approval stamp, signature, and date from the director of public works or designee will be required for any extended or renewed plan. (b) The applicant is responsible for submitting an erosion and sediment control plan which meets the requirements of this article, the Maryland Stormwater Design Manual and the Standards and Specifications. The plan shall include sufficient information to evaluate the environmental characteristics of the affected areas, the potential impacts of the proposed grading on water resources and the effectiveness and acceptability of measures proposed to minimize soil erosion and off-site sedimentation. The applicant shall certify on the drawings that all clearing, grading, drainage, construction and development shall be conducted in strict accordance with the approved plan. Applicants shall submit the following information: (1) A letter of transmittal; (2) A vicinity sketch indicating north arrow, scale and other information necessary to easily locate the property; (3) A plan at an appropriate scale approved by the city indicating at least: (i) Name, address and telephone number of: a. The owner of the property where the grading is proposed; b. The developer; and c. The applicant. (ii) Drainage area map(s) at a 1" = 200' minimum scale showing existing, interim, and proposed topography, proposed improvements, standard symbols for proposed sediment control features, and pertinent drainage information including provisions to protect downstream areas from erosion for a minimum of two hundred (200) feet downstream or to the next conveyance system; (iii) The location of natural resources, wetlands, floodplains, highly erodible soils, slopes fifteen (15) percent and steeper, and any other sensitive areas; (iv) A general description of the predominant soil types on the site, as described by the appropriate soil survey information available through the local soil conservation district or the USDA Natural Resources Soil Conservation Service; (v) Proposed stormwater management practices; (vi) Erosion and sediment control plans including: a. The existing topography and improvements as well as proposed topography and improvements at a scale between 1" = 10' and 1" = 50' with two-foot contours or other approved contour interval. For projects with more than minor grading, interim contours may also be required; b. Scale, project and sheet title, and north arrow on each plan sheet; c. The limit of disturbance (LOD) including: 1. Limit of grading (grading units, if applicable); and 2. Initial, interim, and final phases; d. The proposed grading and earth disturbance including: 1. Total disturbed area; 2. Volume of cut and fill quantities; and 3. Volume of borrow and spoil quantities; e. Storm drainage features, including: 1. Existing and proposed bridges, storm drains, culverts, outfalls, etc.; 2. Velocities and peak quantities of flow rates at outfalls for the two-year and ten-year frequency storm events; and 3. Site conditions around points of all surface water discharge from the site; f. Public safety features as required by the approving agency during design review: g. Any other items as required by the approving agency. (vii) Erosion and sediment control provisions to minimize on-site erosion and prevent off-site sedimentation including: a. Provisions to preserve topsoil and limit disturbance; b. Phased construction and implementation of grading unit(s) to minimize disturbances, both in extent and duration; c. Location and type of all proposed sediment control practices; d. Design details and data for all erosion and sediment control practices; and e. Specifications for temporary and permanent stabilization measures including, at a minimum: 1. The "standard stabilization note" on the plan stating: Following initial soil disturbance or re-disturbance, permanent or temporary stabilization shall be completed within: a) Three (3) calendar days as to the surface of all perimeter dikes, swales, ditches, perimeter slopes, and all slopes greater than three horizontal to one vertical (3:1); and b) Seven (7) days as to all other disturbed or graded areas on the project site not under active grading. 2. Details for areas requiring accelerated stabilization. (viii) Maintenance shall be performed as necessary to ensure that the stabilized areas continuously meet the appropriate requirements of the standards and specifications. (ix) Sequence of construction describing the relationship between the implementation and maintenance of controls, including permanent and temporary stabilization and the various stages or phases of earth disturbance and construction. Any changes or revisions to the sequence of construction must be approved by the city prior to proceeding with construction. The sequence of construction must, at a minimum, include the following: a. Request for a pre-construction meeting with the appropriate enforcement authority; b. Clearing and grubbing for those areas necessary for installation of perimeter controls; c. Construction and stabilization of perimeter controls; d. Remaining clearing and grubbing within installed perimeter controls; e. Road grading; f. Grading for the remainder of the site; g. Utility installation, connections to existing structures, and a determination as to whether storm drains will be used or blocked after construction; h. Installation of impervious areas; i. Final grading, landscaping and stabilization; j. Installation of stormwater management measures; k. Approval of the appropriate enforcement authority prior to removal of sediment controls; and l. Removal of controls and stabilization of areas that are disturbed by removal of sediment controls. m. Submittal of stormwater management as-built plan to the city. (x) A statement placed on the plan indicating that the developer shall request that the city approve work completed in accordance with the approved erosion and sediment control plan, the site or building permit, and this article: a. Prior to the start of earth disturbance; b. Upon completion of installation of perimeter erosion and sediment controls, but before proceeding with any other earth disturbance, excavation or grading. Other building or grading inspection approvals may not be authorized until this initial approval by the inspection agency is made; and c. Prior to the removal of sediment control practices. (xi) Certification by the owner or developer that any clearing, grading, excavation, construction, or development, or all of these, will be done pursuant to this plan and that responsible personnel involved in the construction project will have a certification of training at an administration approved training program for the control of sediment and erosion before beginning the project. Additionally, the owner or developer shall allow right of entry for periodic on-site evaluation by the city and/or the administration. (xii) Certification by a professional engineer, land surveyor, landscape architect, architect, or forester (for forest harvest operations only) registered in the state of Maryland that the plans have been designed in accordance with erosion and sediment control laws, regulations, and standards, if required by the city or the administration; and (xiii) Any additional information or data deemed appropriate by the city. (c) Modifications to erosion and sediment control plans. The city may revise approved plans as necessary. Modifications may be requested by a permittee, the city manager or the director of public works in accordance with COMAR 26.17.01.09(H), Plan Modifications. The city may develop a list of minor modifications that may be approved as field revisions by the inspection agency. The administration must approve any list of minor modifications prior to its implementation. (d) Standard erosion and sediment control plan. (1) The city may adopt a standard erosion and sediment control plan for activities with minor earth disturbances, such as single-family residences, small commercial and other similar building sites, minor maintenance grading, and minor utility construction. (2) A standard erosion and sediment control plan must meet the requirements of this article and the standards and specifications. (3) MDE shall review and approve the standard plan prior to its adoption.
(Ord. No. O-03-25, 4-21-25)
Ask a question about Gaithersburg law
Corpus searches the Gaithersburg sections it holds and shows the ones that match, with their citations. Free, no sign-in.
