§ 19-43 — Minimum SWM criteria
City Code of the City of Rockville, Maryland (Codified through Ordinance No. 1-26, adopted January 12, 2026. (Supp. No. 17, Update 1)) · Rockville City Code § 19-43
Corpus is an independent public-information project, not the official City of Rockville website. Stable reference: corpuslaw.us/code/6c3dd193-0342-4973-8c23-1b9c01aa2c8c
Sec. 19-43. - Minimum SWM criteria.
(a) Except as otherwise provided, the basic design criteria, methodologies and construction specifications, subject to the approval of the Department and MDE, will be those of the Design Manual. (b) SWM systems for development projects covered by this chapter must meet the minimum requirements, specifications and methodologies set forth in this article, the regulations, the Design Manual and Department guidance. At a minimum, SWM control must be provided on-site for: (1) Water quality volume (WQ v ) encompassing the recharge volume (Re v ). (2) Channel protection volume (Cp v ). (3) Overbank flood protection volume (Qp 10 ). (4) Extreme flood control (Q f ) only in cases where the Department determines that this level of control is necessary for the protection of property, existing buildings or other critical structures. (c) ESD treatment practices must be used to treat runoff from one (1) inch of rainfall on all new development projects. (d) Redevelopment projects may be permitted by the City to treat less than one (1) inch of rainfall, if it can be demonstrated to the Department's satisfaction that treatment at this level is not feasible. (e) Cp v controls will be considered to be met when a development project's ESD measures are designed according to the reduced runoff curve method in the Design Manual. (f) When a development project's target rainfall is not fully controlled utilizing ESD measures, then any remaining WQ v and Cp v requirements must be met according to the priorities listed in section 19-44. (g) The Department may, on a case-by-case basis, modify the minimum SWM criteria, requirements, specifications or methodologies to address environmental, hydrologic, hydraulic, topographic or other technical conditions or limitations.
(Ord. No. 19-12, 12-17-12)
Ask a question about Rockville law
Corpus searches the Rockville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
