For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 19-47 — Redevelopment SWM criteria

City Code of the City of Rockville, Maryland (Codified through Ordinance No. 1-26, adopted January 12, 2026. (Supp. No. 17, Update 1)) · Rockville City Code § 19-47

Corpus is an independent public-information project, not the official City of Rockville website. Stable reference: corpuslaw.us/code/20234f12-f142-4d46-bff2-257bd69f40a1

Sec. 19-47. - Redevelopment SWM criteria.

(a) Redevelopment, as defined in article I, section 19-2, must provide SWM according to the following criteria: (1) Reduce the existing impervious area within the limit of disturbance by a minimum of fifty (50) percent in accordance with the Design Manual, regardless of whether the redevelopment project disturbs fifty (50) percent or more of the total site area, and provide overbank flood protection volume control (Qp 10 ) and safe conveyance in accordance with article IV, division 6, or (2) Provide SWM for the site according to section 19-43, utilizing the priorities listed in section 19-44. (b) Where a redevelopment project has an existing on-site SWM system which does not meet the minimum controls listed in section 19-43, the Department may consider the area treated by such system as meeting SWM requirements, if the applicant constructs modifications to the system that provide treatment in accordance with criteria in section 19-43. (c) Regardless of the site's on-site SWM requirements, the applicant must provide SWM for the contiguous right-of-way according to section 19-46.

(Ord. No. 19-12, 12-17-12)

Ask a question about Rockville law

Corpus searches the Rockville sections it holds and shows the ones that match, with their citations. Free, no sign-in.