For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 5-252 — Same—Amendments

City Code of the City of Rockville, Maryland (Codified through Ordinance No. 1-26, adopted January 12, 2026. (Supp. No. 17, Update 1)) · Rockville City Code § 5-252

Corpus is an independent public-information project, not the official City of Rockville website. Stable reference: corpuslaw.us/code/a7326d3b-549a-4f83-931b-469f7dde81df

Sec. 5-252. - Same—Amendments.

The ICC International Plumbing Code, 2021 Edition (IPC), is amended in the following respects: Section 101.1 of the IPC is amended to read as follows: 101.1 Title. These regulations shall be known as the Plumbing Code of the City of Rockville, hereinafter referred to as "this code". Section 103.1 of the IPC is deleted in its entirety. Section 106.1.1 and 106.1.2 of the IPC are deleted. Section 106.2 of the IPC is amended to read as follows: 106.2 Exempt work. The following work shall be exempt from the requirement for a permit: 1. The stopping of leaks in drains, water, soil, waste or vent pipe provided, however, that if any concealed trap, drainpipe, water, soil, waste or vent pipe becomes defective and it becomes necessary to remove and replace the same with new material, such work shall be considered as new work and a permit shall be obtained and inspection made as provided in this code. 2. The clearing of stoppages or the repairing of leaks in pipes, valves or fixtures, and the removal and reinstallation of water closets, provided that such repairs do not involve or require the replacement or rearrangement of valves, pipes or fixtures. Exemption from the permit requirements of this code shall not be deemed to grant authorization for any work to be done in violation of the provisions of this code or any other laws or ordinances of this jurisdiction. Section 106.3 of the IPC is amended to read as follows: 106.3 Application for permit. Each application for a permit, with the required fee, shall be filed with the Building Official on a form furnished for that purpose and shall contain a general description of the proposed work. The application shall be signed by the City licensed Master Plumber or if residential work that the International Residential Code allows the homeowner to do, the homeowner can sign the application. Section 106.5.1 of the IPC is amended to read as follows: 106.5.1 Reviewed construction documents. When the Building Official issues the permit where construction documents are required, the construction documents shall be endorsed in writing and stamped "REVIEWED." Such reviewed construction documents shall not be changed, modified or altered without authorization from the Building Official. All work shall be done in accordance with the reviewed construction documents. Section 106.5.3 of the IPC is amended to read as follows: 106.5.3 Expiration. Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within six (6) months (180 days) after its issuance, or if the work authorized by such permit does not continue to progress or is abandoned for a period of six (6) months (180 days) after the last approved/valid inspection. The last approved/valid inspection shall be an inspection that has been passed. A failed inspection will not count as an approved/valid inspection. Before such work recommences, a new permit shall be first obtained, and the appropriate fees, per the City's Fee Schedule shall be paid. Exception: Water and Sewer Contribution fees will not need to be repaid. Section 106.5.4 of the IPC is amended to read as follows: 106.5.4 Extensions. The Building Official can extend the time for action by the permittee if there is reasonable cause. A permittee holding an unexpired permit shall have the right to apply for an extension, in writing, for time to complete such work. The extension shall be requested for a justifiable cause. Sections 108.2.4, 108.2.5.1, and 108.2.5.2 of the IPC are deleted. Sections 109.1, 109.3 and 109.2 of the IPC are amended to read as follows: 109.1 Fees. A permit shall not be issued until the fees prescribed in Section 109.2 have been paid. 109.2 Fee schedule. The fees for all plumbing work shall be established by resolution of the Mayor and Council. 109.3 Work commencing before permit issuance. Any person who commences any work on a plumbing system before obtaining the necessary permits shall be subject to 100 percent of the usual permit fee in addition to the investigation fees established by resolution of the Mayor and Council. Section 110.1.1 is added to the IPC to read as follows: 110.1.1 Water Meter Sizing. The Building Official shall determine meter size, type, and metering schemes for all properties within the lot line. In general, water meters shall be right-sized based on plumbing hydraulic load, in accordance with IPC Section 604 and Appendix E. Oversized meters shall be prohibited, unless authorized by the Director of Public Works. Section 114 of the IPC is amended to read as follows: Section 114 Means of Appeal 114.1 Board of Adjustments and Appeals. Appeals of administrative interpretations or decisions made by the Plumbing official shall be administered in accordance with Chapter 5, Article I, Section 5-12 of the Rockville City Code. Section 115.4 of the IPC is amended to read as follows: 115.4 Violation penalties. Any persons who shall violate a provision of this code or shall fail to comply with any of the requirements thereof or who shall erect, install, alter or repair plumbing work in violation of the approved construction documents or directive of the Building Official, or of a permit or certificate issued under the provisions of this code, shall be guilty of a municipal infraction. Each day that a violation continues after notice has been served shall be deemed a separate offense. Section 202 of the IPC is amended by deleting the definition "Individual sewage disposal system", and adding the following: LOW LEAD CONTENT. Low lead content means: (1) Containing not more than 0.2% lead for solder and flux; (2) Containing not more than 8% lead by dry weight for pipes and pipe fittings; (3) Containing a percentage of lead for plumbing fittings and fixtures that is in compliance with standards established under Section 1417 of the federal Safe Drinking Water Act (42 USC Section 300g-6); and (4) Containing not more than a weighted average lead content of 0.25% for the wetted surfaces of a pipe, pipe fitting, plumbing fitting, or fixture intended to dispense water for human consumption through drinking or cooking; or (5) Meeting NSF standards 372 and 61-Annex G. Sections 305.4 and 305.4.1 of the IPC are amended to read as follows: 305.4 Freezing. Water, soil and waste pipes shall not be installed outside of a building, in attics or crawl spaces, concealed in outside walls, or in any other place subjected to freezing temperature unless adequate provision is made to protect such pipes from freezing by insulation or heat or both. Exterior water supply system piping shall be installed two (2) feet, six (6) inches below grade. 305.4.1 Sewer depth. Building sewers shall be a minimum of two (2) feet two (2) inches (2' 2") below grade. Section 312.11 is added to the IPC to read as follows: 312.11 Grease and Oil Interceptors. All establishments, which are required to have grease or oil interceptors, must maintain a log indicating frequency of waste retrieval by an appropriate contractor. The log and a copy of the waste removal contract must be available at all times for inspection by the administrative authority. A certified waste removal/pumping contractor must perform the pumping and scraping of a vault that is 300 or more gallons in size. Sections 404.1 and 404.2 of the IPC are amended to read as follows: 404.1 Where required. Accessible plumbing facilities and fixtures shall be provided in accordance with the State of Maryland's Accessibility Code (COMAR 09.12.53) 404.2 Accessible fixture requirements. Accessible plumbing fixtures shall be installed with the clearances, heights, spacing and arrangements in accordance with the State of Maryland's Accessibility Code (COMAR 09.12.53) Section 413.2.1 is added to the IPC to read as follows: 413.2.1 Grease interceptor required. Floor drains located within a ten (10) foot diameter of grease producing equipment shall discharge through a grease interceptor. Exception: Floor drains located inside walk in coolers. Section 413.5 is added to the IPC to read as follows: Section 413.5 Fire Pump Room Floor Drains. Each fire pump room shall be provided with a minimum of two floor drains located near the fire pump. Each floor drain shall have a minimum of 4 inch diameter opening. One floor drain shall be dedicated to the main floor drain from the pump discharge piping and the second floor drain opening shall serve the accessory drain piping from the fire pump. Section 501.4.1 is added to the IPC to read as follows: 501.4.1 Prohibited location. Fuel-fired water heaters shall not be installed in a sleeping room, bathroom, under stairs, or in a closet accessed through a sleeping room or bathroom. Exception: A sealed combustion chamber or direct vent water heater may be installed in those locations. Section 603.1 of the IPC is amended to read as follows: 603.1 Size of yard line pipe. The yard line pipe shall be sized to supply water to the structure in the quantities and at the pressure required by this code. The minimum diameter of yard line pipe shall be one (1) inch. Exception: Repairs can be done in the existing pipe size as long as yard line pipe is not completely replaced. Table 604.4 of the IPC is amended to read as follows: TABLE 604.4 MAXIMUM FLOW RATES AND CONSUMPTION FOR PLUMBING FIXTURES AND FIXTURE FITTINGS PLUMBING FIXTURE OR FIXTURE FITTING | MAXIMUM FLOW RATE OR QUANTITY b Lavatory, private | 1.5 gpm at 60 psi Lavatory, public, (metering) | 0.25 gallon per metering cycle Lavatory, public (other than metering) | 0.5 gpm at 60 psi Shower head a | 2.0 gpm at 80 psi Sink faucet | 1.5 gpm at 60 psi Urinal | 0.5 gallon per flushing cycle Water closet (tanktype) c | 1.28 gallons per flushing cycle Water closet (flushometer) | 1.6 gallons per flushing cycle For SI: 1 gallon per minute = 3.785 L/m, 1 pound per square inch = 6.895 kPa a. A hand-held shower spray is a shower head. b. Consumption tolerances shall be determined from referenced standards. c. Dual Flush Toilets - The effective flush volume shall not exceed 1.28 gallons (4.8 liters). The effective flush volume is defined as the composite, average flush volume of two reduced flushes and one full flush. Flush volumes will be tested in accordance with ASME A112.19.2 and ASME A112.19.14. Section 605.3 of the IPC is amended to read as follows: 605.3 Water service pipe. Water service pipe shall conform to NSF61 and the requirements of section 5-253(6) of the Rockville City Code. All water service pipe installed underground and outside of the structure, shall have a minimum working pressure rating of 160 psi (1100 kPa) at 73.4 o F (23 o C). Where the water pressure exceeds 160 psi (1100 kPa), piping material shall have a minimum rated working pressure equal to the highest available pressure. All ductile iron water pipe shall be cement mortar lined in accordance with AWWA C104/A21.4. Section 606.2 of the IPC is amended to read as follows: 606.2 Location of shutoff valves. Shutoff valves shall be installed in the following locations: 1. On the fixture supply to each plumbing fixture. 2. On the water supply pipe to each sillcock. 3. On the water supply pipe to each appliance or mechanical equipment. Section 607.3 of the IPC is amended to read as follows: 607.3 Thermal expansion control. Where a storage water heater is supplied with cold water that passes through a check valve, pressure reducing valve or backflow preventer, a thermal expansion control device shall be connected to the water heater cold water supply pipe at a point that is downstream of all check valves, pressure reducing valves and backflow preventers. Thermal expansion tanks shall be sized in accordance with the tank manufacturer's instructions and shall be sized such that the pressure in the water distribution system shall not exceed that required by Section 604.8. If the existing water heater is not equipped with an expansion tank, one must be added at the time of replacement. Section 608.17.4 of the IPC is amended by deleting Exception No. 1. Section 701.8 is added to the IPC to read as follows: 701.8 Identification of drain, waste and vent lines. Where specifically required by sections 701.8.1, 701.8.2 or 701.8.3, drain, waste and vent lines shall be marked in accordance with these sections to identify them. 701.8.1 Identification of grease interceptor lines. No plumbing fixtures shall be connected to a dedicated plumbing line routed to the grease interceptor. These lines shall be labeled "Grease Line" in a minimum two inch (2") high letters spaced a minimum of four feet (4') apart. 701.8.2 Identification of Underground Storm and Sanitary Lines. All discharge sanitary and storm lines underground shall be identified by 2" stencils or stickers every 4' where clearly visible. 701.8.3 Identification of above ground storm, waste and vent lines. All above-ground sanitary and piping shall be identified by 2" stencil or stickers every 5' clearly visible from all directions. Section 714.1 of the IPC is amended to read as follows: 714.1 Sewage backflow. Where plumbing fixtures are installed on a floor and adding a new bathroom fixtures or bathroom group to a residential basement with a finished floor elevation below the elevation of the manhole cover of the next upstream manhole in the public sewer, such fixtures shall be protected by a backwater valve installed in the building drain, or horizontal branch serving such fixtures. Plumbing fixtures installed on a floor with a finished floor elevation above the elevation of the manhole cover of the next upstream manhole in the public sewer shall not discharge through a backwater valve. Exception: In existing buildings, fixtures above the elevation of the manhole cover of the next upstream manhole in the public sewer shall not be prohibited from discharging through a backwater valve. Section 802.3 of the IPC is amended to read as follows: 802.3 Installation. Indirect waste piping shall not be less than one (1) inch in diameter. All indirect waste piping shall discharge through an air gap or air break into a waste receptor or standpipe. Waste receptors and standpipes shall be trapped and vented and shall connect to the building drainage system. All indirect waste piping that exceeds 2 feet (610 mm) in developed length measured horizontally, or 4 feet (1219 mm) in total developed length, shall be trapped. Exception: See chart 1003.a (a) Flow Rates for Various Drain Tail Piece Sizes, for grease interceptors. Section 918.2 of the IPC is amended to read as follows: 918.2 Installation. The valves shall be installed in accordance with the requirements of this section and the manufacturer's instructions. Section 918.3 of the IPC is amended to read as follows: 918.3 Where permitted. Air admittance valves shall be prohibited in all uses other than as allowed in ASSE 1050 and ASSE 1051. Section 918.4 of the IPC is deleted in its entirety. Section 918.8 of the IPC is amended to read as follows: 918.8 Prohibited installations. Air admittance valves shall not be installed in nonnaturalized special waste systems as described in Chapter 8. Section 1003.2 of the IPC is amended to read as follows: 1003.2 Approval. The size, type and location of each interceptor and of each separator shall be designed and installed in accordance with the manufacturer's instructions, the City's Water Quality Ordinance, and the requirements of this section based on the anticipated conditions of use. Wastes that do not require treatment or separation shall not be discharged into any interceptor or separator. Section 1003.3.5 of the IPC is amended to read as follows: 1003.3.5 Hydromechanical grease interceptors, fats, oils and greases disposal systems and automatic grease removal devices. Hydromechanical grease interceptors; fats, oils, and greases disposal systems and automatic grease removal devices shall be sized in accordance with ASME A112.14.3, ASME A112.14.4, ASME A112.14.6, CSA B481.3 PDI G101, or Appendix G. Hydromechanical grease interceptors; fats, oils, and greases disposal systems and automatic grease removal devices shall be designed and tested in accordance with ASME A112.14.3, ASME A112.14.4, CSA B481.1, PDI G101 or PDI G102. Hydromechanical grease interceptors; fats, oils, and greases disposal systems and automatic grease removal devices shall be installed in accordance with the manufacturer's instructions. Where manufacturer's instructions are not provided, hydromechanical grease interceptors; fats, oils, and greases disposal systems and automatic grease removal devices shall be installed in compliance with ASME A112.14.3, ASME A112.14.4, ASME A112.14.6, CSA B481.3 or PDI G101. Section 1003.3.5.1 of the IPC is amended to read as follows: 1003.3.5.1 Grease interceptor capacity. Capacity of grease interceptors shall be determined either in accordance with Table 1003.3.5.1 for the flow-through rates indicated, or in accordance with Appendix G, Section 302.10 of the 2021 WSSC Water Plumbing and Fuel Gas Code. Section 1003.3.7 of the IPC is amended to read as follows: 1003.3.7 Gravity grease interceptors and gravity grease interceptors with fats, oils, and greases disposal systems. The required capacity of gravity grease interceptors and gravity grease interceptors with fats, oils, and greases disposal systems shall be determined by multiplying the peak drain flow into the interceptor in gallons per minute by a retention time of 30 minutes, or in accordance with Appendix G, Section 302.10 of the 2021 WSSC Water Plumbing and Fuel Gas Code. Gravity grease interceptors shall be designed and tested in accordance with IAPMO/ANSI Z1001. Gravity grease interceptors with fats, oils, and greases disposal systems shall be designed and tested in accordance with ASME A112.14.6 and IAPMO/ANSI Z1001. Gravity grease interceptors and gravity grease interceptors with fats, oils, and greases disposal systems shall be installed in accordance with manufacturer's instructions. Where manufacturer's instructions are not provided, gravity grease interceptors and gravity grease interceptors with fats, oils, and greases disposal systems shall be installed in compliance with ASME A112.14.6 and IAPMO/ANSI Z1001. Appendix E Sizing of Water Piping System of the IPC is adopted in its entirety. Appendix F is added to the IPC to incorporate The Washington Suburban Sanitary Commission (WSSC) Manual of Standards. Appendix G is added to the IPC to incorporate Section 302.10 of the 2021 WSSC Water Plumbing and Fuel Gas Code

(Ord. No. 11-15, § 11, 6-1-15; Ord. No. 22-19, § 11, 9-9-19; Ord. No. 6-24, § I, 5-20-24)

Ask a question about Rockville law

Corpus searches the Rockville sections it holds and shows the ones that match, with their citations. Free, no sign-in.