§ 17-70 — Replacement of surface
Revised Code of Ordinances, City of Old Town Maine (eCode360 publication OL4196 current through legislation adopted 2025-12-01 (imported 2026-11-16)) · Revised Code of Ordinances, City of Old Town Maine § 17-70
Corpus is an independent public-information project, not the official City of Old Town website. Stable reference: corpuslaw.us/code/2452ba83-e607-47bf-b1c7-ea0064dba475
§ 17-70: Replacement of surface.
(a) Hot asphalt paving on rigid base. When an opening is made on a street where the surface is cement concrete, premixed surface of tar or asphalt or granite block on a concrete base, the concrete shall be cut back at least 12 inches beyond the edges of the trench after the backfilling has been completed and before the new concrete patch is replaced. All reinforcing steel encountered when removing the concrete shall not be cut off but shall be retained and used for reinforcing in the new concrete when placed. In addition to the retained reinforcing, additional reinforcing steel shall be furnished to provide the equivalent of 1/2 inch steel rods on 12 inch centers both ways in the new concrete patch. The thickness of the concrete in the new patch shall be at least four inches thicker than the existing concrete and the top surface of the concrete in the patch shall be furnished to conform to the surface of the old concrete. The new concrete shall be protected from all traffic for not less than seven days after being placed. Where granite block is encountered under the paving, these blocks shall be removed and the area replaced with concrete in accordance with the requirements above described. After the concrete has been placed and before the permanent paved surface is put back, the new surface pavement shall meet the current MDOT specifications for bituminous surfacing asphalt and the trench shall be enlarged at least 12 inches on all sides forming a "T" joint, the edges of the old paving painted with an asphaltic liquid before the new paving is put in place. Any street opening (including sidewalks) requiring lateral work shall be no less than five feet wide when resurfacing is complete. Alternative practices may be suitable under this section with prior approval from the public works director. (b) Bituminous paving on flexible base. When a street opening permit is issued on a street which has been constructed for heavy traffic and has a bituminous surface without a cement concrete base, the same amount of gravel and/or crushed rock shall be replaced in the trench as is removed when the excavation is made where this material exceeds the eighteen-inch depth as specified in § 17-69(a). When crushed rock is encountered directly below the bituminous pavement, a like amount of crushed rock shall be replaced and this crushed rock shall be penetrated with an approved liquid asphalt at the rate of at least one gallon per square yard before the permanent surface is replaced. The existing pavement shall be enlarged at least 12 inches on all sides and the edges painted with an asphaltic liquid that meets specifications outlined in § 17-70(a) before the new paving is placed and increased to a thickness comparative to what already exists, but not less than five inches. At no time will surface paving be done at temperatures below 40° F. unless the director has given prior approval. (c) Temporary surfacing. On all streets where a permanent pavement has been built, the permanent surface shall be replaced after the trench has been properly backfilled except that when openings are authorized after November 1st in any one year, a temporary surface of premixed bituminous material shall be used and this temporary patch shall remain until the following year when the permanent surface shall be replaced. On all other streets, the trench shall be patched with premixed bituminous material as soon as the backfilling has been completed, and the joints between the old and the new material shall be sealed to prevent surface water from penetrating through the joint. In all cases whenever or wherever a street opening has been made in any road, street or sidewalk having a permanent or semi-permanent surface, the edges of the pavement shall be squared up before the permanent patch is replaced. (d) New construction. Where new private construction is in progress and excavation in the street is required for sewer connections, underground electric and/or telephone service lines, the work shall be performed by an approved contractor, including the excavation and backfilling and the contractor shall place a temporary patch over the excavated area immediately upon completion of the backfilling. The permanent surface shall be replaced by the public works department. (e) Repair and renewal work. For all excavations within the street or right-of-way limits required to repair or replace existing installations by individuals other than the utilities companies, the excavation and repair work shall be accomplished by a private contractor. The surface shall be replaced by the public works department at the expense of the owner or applicant.
[ Ord. of 4-16-1973 ; Ord. of 6-2-2003 ]
Ask a question about Old Town law
Corpus searches the Old Town sections it holds and shows the ones that match, with their citations. Free, no sign-in.