Sec. 24-43. Methods of construction.

On all work done within the scope of this article, the size, slope, alignment and materials of construction of a building sewer, and the methods to be used in placing of the pipe, jointing, testing and backfilling the trench shall conform to the requirements of the Department of Public Works' building sewer construction specifications. Whenever possible, the building sewer shall be brought to the building at an elevation below the basement floor. In all buildings in which any building drain is too low to permit gravity flow to the public sewer, wastewater carried by such building drain shall be lifted by a means subject to the approval of the Department of Public Works and discharged to the building sewer.

(Ord. No. 263-96, 5-20-96; Ord. 129-14/15, 1-21-2015, Effective 1-1-2016)