For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 6-99 — Electrical permits

Code of Ordinances, City of Portland, Maine (Chapters as revised by the City Clerk, latest revision September 9, 2026 (each chapter carries its own revision date)) · Portland Code of Ordinances § 6-99

Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/b64ecae4-c6be-4ace-8bdb-8cb553d74736

Sec. 6-99. Electrical permits.

In addition to the other permitting provisions of this article, the following shall also apply to electrical permits. (a) No electrical permit shall be issued unless the applicant holds a valid master electrician's license, or a limited or special license for the particular work to be installed, issued by the State of Maine. (b) Notwithstanding subsection (a) above, a person who does not hold a master electrician’s license or limited or special license may obtain an electrical permit and do limited electrical work, so long as: 1. The permit is for, and the work will be completed on, a single-family residence that the applicant owns and resides in; 2. The applicant does not connect wires into any service panel; and 3. The applicant does not install, relocate, disconnect, or disturb in any way the main service entrance to the residence. (c) Electrical permits are not transferable, and the permitted work must be completed by, or under the supervision of, the permittee. (d) An electrical permit shall expire if work authorized by such permit is not substantially commenced within ninety (90) days from date of issue of the permit; or if the work authorized by such permit is suspended or abandoned for a period of one hundred twenty (120) days. (e) Any person, after having been issued a permit, shall correct any defective work within forty-eight (48) hours after notification by the building authority. If such corrective work is not accomplished within such time period, no other permits shall be issued to the applicant until same has been accomplished.

(Ord. 18-17/18, 8-21-2017)

Ask a question about Portland law

Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.