For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 8.3 — Institutional Overlay

Code of Ordinances, City of Portland, Maine (Chapters as revised by the City Clerk, latest revision September 9, 2026 (each chapter carries its own revision date)) · Portland Code of Ordinances, Land Use Code § 8.3

Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/17c9c3a3-cbd5-4692-aadf-9e4b156d2fb0

8.3 INSTITUTIONAL OVERLAY (IOZ)

8.3.1 Purpose The Institutional Overlay Zone (IOZ) provides a regulatory tool available to the city’s major medical and higher education campuses where an alternative regulatory structure is needed to facilitate a consistent, predictable, and clear growth management process. The purposes of the Institutional Overlay Zone are to: A. Acknowledge that the city’s major academic and medical institutions play a prominent role in the health and well-being of the local and regional community, and to sustain that role, these institutions need flexibility to change and grow. B. Encourage proactive planning for institutional change and growth which identifies and addresses likely long-term institutional needs and cumulative impacts while leveraging potential benefits at the neighborhood, city, and regional level. C. Ensure that institutional change and growth both complements and, as appropriate, integrates adjacent or surrounding neighborhoods through carefully planned transitions. D. Support the formation and continuation of mutually beneficial public-private cooperation. E. Support an ongoing public engagement process that benefits both the institutions and nearby neighborhoods. F. Reflect Comprehensive Plan and other policy objectives. G. Provide a regulatory tool for Portland’s major institutions that includes the flexibility required to balance the particular needs of institutions with the needs of the surrounding neighborhood and wider community. 8.3.2 Location and applicability The city’s major medical and higher education institutions are eligible to apply for designation as Institutional Overlay Zones. Use of an Institutional Overlay Zone is encouraged for these institutions, particularly where proposed future development may be inconsistent with current base zoning. 8.3.3 Establishment A. Application for an Institutional Overlay Zone. Where an eligible institution seeks designation as an IOZ, they shall submit a zone change application consisting of two components: 1. An Institutional Development Plan (IDP) in accordance with Subsection 8.3.4. 2. A regulatory framework in accordance with Subsection 8.3.5. If adopted, this framework shall serve as the text and map amendment to the City’s Land Use Code and zoning map. B. Required public involvement. At least two neighborhood meetings shall be required to establish designation as an IOZ. The first shall be held prior to the formal submission of a zone change application, and the second shall be held during the City’s review. Meetings shall identify the concerns, if any, of affected residents and property owners, and should solicit feedback to inform the Institutional Development Plan (IDP) and regulatory framework proposed. Meetings shall be held in a convenient location proximate to the institution. The applicant shall provide written notification to property owners of record within 500 feet of the proposed IOZ boundary at least ten days prior to the meeting dates, and shall maintain written records of the meetings. C. Required scoping meeting. The eligible institution shall meet with the Planning Authority after the first required neighborhood meeting and prior to submission of the zone change application to confirm the focus of the Institutional Development Plan (IDP) and regulatory framework, including associated study areas that may be outside of the proposed IOZ boundary. The IDP and regulatory framework will vary in detail and focus depending on the eligible institution and its context. The content requirements in Subsections 8.3.4 and 8.3.5 and the recorded comments from neighborhood meeting(s) shall provide direction for the content of the IDP. The Planning Authority or Planning Board may require additional information or modify content requirements as is relevant to the eligible institution. D. Reviewing authority. The Planning Board shall review the zone change application, including the IDP and regulatory framework. At least one public workshop and a public hearing before the Planning Board are required. Upon recommendation of the Planning Board, the City Council shall review and consider adoption of the Institutional Overlay Zone and the accompanying regulatory framework as an amendment to the City’s Code of Ordinances. E. Future institutional development. All new development shall be compliant with the established IOZ and accompanying regulatory framework. It shall also be consistent with the IDP, consistent with the Comprehensive Plan, and shall meet applicable site plan standards, unless such standards are superseded by the regulatory framework. Any development proposed by an eligible institution outside the established IOZ boundary shall be reviewed under the standards of the applicable zone , unless such development is proposed in a residential zone and is functionally related to the operations within the IOZ, in which case it shall be addressed by the IDP and require an amendment to the IDP as applicable. 8.3.4 Institutional Development Plan (IDP) A. Purpose. Any use conducted by an eligible institution and any construction by an eligible institution in an Institutional Overlay Zone shall be consistent with an Institutional Development Plan (IDP) approved by the Planning Board in accordance with this section. The purpose of the IDP is to establish baseline data about institutional land uses, facilities, and services, and to measure, analyze, and address the anticipated or potential impacts of planned institutional growth and change. The IDP shall serve as a background document that supports the proposed regulatory framework and informs subsequent site plan review(s). B. Planning horizon. An IDP shall provide the City and abutting neighborhoods with a clear outline of the anticipated or potential growth and change of the eligible institution for the short- to medium-term (e.g. 1-5 and 5-10 years respectively), as well as a conceptual growth plan for the long-term (e.g. 10 years or more). However, the specific planning horizons for each institution will be determined as part of the IDP approval process. C. Content. The IDP submission shall address the following elements unless specifically modified by the Planning Authority or Planning Board, with the scope and level of detail to be clarified at the required scoping meeting: 1. Context information, including: a. The institution’s adopted mission, vision, or purpose statement. b. A summary of relevant baseline data on the institution, including: i. A neighborhood context plan. ii. An inventory of current programs and services. iii. A current census of the number of people using the institution (e.g., employees, enrollment, patients), with an indication of maximums and minimums over time. iv. An inventory and/or plan of all existing property holdings within the main campus and within the City of Portland, including an indication of functional land use links between off-campus properties and the main campus (e.g. remote parking). v. An inventory and/or plan of existing facilities, including data on use, floor area, and any existing functional connections between facilities. c. A summary of the baseline characteristics of the existing campus and context of the institution, based on identified study areas, including: i. A summary of existing resources, such as historic, open space, and natural resources. ii. A summary of the existing transportation system, including vehicular, pedestrian, transit, bicycle, and parking supply, demand, and utilization. iii. A summary of existing public infrastructure supporting the institution, including demand, utilization and any capacity issues. iv. Relevant municipal plans, projects, and studies that may influence the IDP study area and opportunities for integrating institutional growth. d. A summary of public involvement in the development of the IDP, including major areas of public concern. 2. Assessment of future institutional growth and change, including: a. A description of institutional needs and areas of future institutional growth and change, with: i. A projected census of users (e.g., enrollment /employment/patient/ visitor figures and anticipated variations over time). ii. Institutional objectives for property both within and outside the IOZ boundary (e.g. acquisition and/or disposition), including an indication of any functional land use connection for sites outside the IOZ boundary to the main campus. iii. A development plan addressing anticipated or potential institutional needs and physical improvements, including the proposed boundary of the IOZ and any phasing of the development. b. Analysis and associated plans that address the following elements in terms of anticipated growth or potential impacts within the identified study area, and support the development parameters as set out in the regulatory framework, including: i. Transportation and access, with: a) An analysis of the projected changes in parking demand, supply, and impacts to the off-street and on-street parking capacity, including an explanation of the proposed parking plan. b) An analysis of the projected changes in vehicular, pedestrian, transit, and bicycle access routes and facilities, their capacity, and safety. c) A transportation, access, and circulation plan, representing the synthesis of the analysis, and including a program of potential improvements or set of guidelines to address access deficiencies to and within the IOZ. The plan should outline proposed mechanisms and potential strategies to meet transportation objectives, including transportation demand management, phasing, and when a Traffic Movement Permit (TMP) may be required. ii. Environment, with: a) An analysis of potential cumulative impacts on natural resources and open spaces. b) An analysis of projected energy consumption, hazardous materials generation, noise generation, and similar issues as relevant. c) An environmental plan, representing the synthesis of the analysis and including a proposed program or set of guidelines for future preservation, enhancement, conservation, and/or mitigation. iii. Infrastructure, with: a) An analysis of projected public utility demand and the capacity of associated infrastructure. b) An analysis of projected public safety needs and projected impacts to the capacity of these services. c) An infrastructure plan, representing the synthesis of the analysis and including a proposed program or set of guidelines to support sustainable growth. iv. Design, with: a) An analysis of projected impacts to neighboring properties and public spaces, including potential shadow, wind, and lighting impacts, impacts of height and massing, and impacts to historic resources. b) An analysis of transition areas between the institution and adjoining neighborhoods, including identification of key character defining components of the surrounding context. c) An analysis of existing Crime Prevention Through Environmental Design issues and identification of how these principles would be addressed as part of the proposed campus development. d) A conceptual built environment/public realm plan, representing the synthesis of the analysis and including a set of guidelines for urban design, landscape, open space, and streetscape treatments, with particular attention to the treatment of edges (both within and abutting the IOZ boundary) to achieve compatible transitions. v. Neighborhood engagement, with: a) A plan for ongoing community engagement that represents best practices, promotes collaborative problem solving around community concerns, fosters transparency, and identifies mechanisms for neighborhood feedback and institutional accountability. b) A property management framework that identifies the institution’s process for handling operational property issues with neighbors. c) Strategies for assuring communication pertaining to property acquisition and disposition in surrounding neighborhoods. d) A set of construction management principles to apply to all institutional construction, that represent best practice, aim to minimize short- and long-term construction impacts on surrounding residents and businesses, and ensure a clear communication strategy is in place in advance of construction. D. Standards of review. The IDP shall: 1. Address all content requirements, unless explicitly modified by the Planning Authority or Planning Board. 2. Reflect the issues/topics identified in the required public process. 3. Demonstrate consistency with the City’s Comprehensive Plan and the purpose of this ordinance. 4. Demonstrate how the property ownership, proposed growth, and requested regulatory framework relate to the institution’s mission. 5. Demonstrate that traffic and parking impacts have been anticipated and that the proposed parking provision is justified as based on an assessment of options for reducing traffic and parking demands. 6. Outline an approach to open space, natural, and historic resources that supports preservation and enhancement. 7. Demonstrate that potential cumulative environmental impacts have been anticipated and can be minimized or satisfactorily mitigated. 8. Demonstrate that utility impacts have been anticipated and can be minimized or satisfactorily mitigated. 9. Reflect a comprehensive design approach that ensures appropriate transitions with the existing or future scale and character of the neighboring urban fabric. 10. Promote compatibility with existing or future uses in adjacent neighborhoods, maintain housing, and support local amenities. 11. Anticipate future off-site improvements that would support the integration of the institution into the community and city-wide infrastructure. 12. Conform with the standards of Article 16 for designated landmarks or for properties within designated historic districts or designated historic landscapes, if applicable. 13. Incorporate strategies to support clear communication and ongoing public engagement between institutions and nearby neighbors. E. Approval. Upon finding that an eligible institution’s IDP meets the standards of review, the Planning Board shall approve, approve with conditions, or deny an IDP. F. Monitoring. The IDP shall establish a schedule for reporting on IDP implementation at regular intervals of not more than ten years from the date of approval of the initial or amended IDP, and identify thresholds for IDP amendments. G. Amendments. An approved IDP shall guide campus development unless and until amended. If at any time the eligible institutions request minor amendments to an approved IDP, the Planning Authority may approve such minor amendments, provided that they do not constitute a substantial alteration of the IDP and do not affect any condition or requirement of the Planning Board. The applicant shall apply with a written statement of the proposed amendment and proposed amended IDP to the Planning Authority, whose decision as to whether the amendment is minor shall be final. Major amendments shall be reviewed by the Planning Board. When the IDP is amended, the baseline data in the IDP shall be updated as appropriate. 8.3.5 Regulatory framework A. Purpose. The regulatory framework translates the IDP into a set of clear and specific zoning requirements for the IOZ that constitute the text and map amendments to the City’s Land Use Code and zoning map. The zoning requirements are anticipated to include parameters that guide the growth and change of the institution as well as broad strategies to address potential impacts, with plans and details to be developed under site plan review. B. Applicability. The regulatory framework shall apply only to properties that are within the IOZ boundary and to which the eligible institution holds right, title, or interest. For these properties, the Institutional Overlay Zone shall supersede the underlying zoning, and all new institutional development shall be conducted in compliance with the regulatory framework and the approved Institutional Development Plan. Properties located within the Institutional Overlay Zone not subject to right, title, or interest of the eligible institution shall continue to be governed by the regulations of the underlying zoning designation. C. Uses. Institutional uses, including hospitals and higher education facilities, shall be permitted, as shall uses that are functionally integrated with, ancillary to, and/or substantively related to supporting the primary institutional use, consistent with the applicable approved IDP. D. Content. The regulatory framework shall reflect the information and analysis of the IDP. The content shall be tailored to address the issues associated with the institution and its neighborhoods. The regulatory framework should be succinct and use tables and graphics to address the following, if applicable: 1. Zoning boundary of the IOZ. The area to which the regulations apply, as shown on the zoning map, subject to other provisions of this ordinance (i.e. the map amendment to the City’s zoning map). 2. Phasing and schedules. Requirements that relate to proposed phases; a chart showing the schedule or thresholds for submitting an amended IDP (or elements of an IDP, such as a Transportation Demand Management (TDM) Plan). 3. Uses. Clarification, as necessary, on permitted uses. 4. Dimensional requirements. Graphics, sketches, or standards, including details for transition zones within the IOZ boundary. 5. Transportation. Elements such as Transportation Demand Management Plan (TDM) trip reduction targets or contribution to area-wide TDM measures; broad parameters for ensuring pedestrian, vehicular, bicycle and transit access and safety; parking ratios and management strategies; thresholds for access improvements. 6. Environment. The approach to the inclusion of open space and preservation of environmentally-sensitive areas. 7. Mitigation measures. The broad approach to identified mitigation measures, which would be addressed in greater detail in the site plan review process; thresholds for addressing deficiencies; goals for preservation/protection. 8. Design. Graphics and standards to clarify building placement and envelope (height and massing); guidelines for integration of site features; required treatments for transition zones and treatment for all edges (both within and abutting the IOZ boundary); guidelines for establishing campus identity. 9. Neighborhood integration. Thresholds and strategies for neighborhood engagement; mitigation of impacts on neighboring properties, including construction impacts; buffering requirements; objectives for pedestrian linkages and safety; other requirements that address community concerns. 10. Monitoring. A schedule for regular monitoring reports on IDP implementation in accordance with the IDP. E. Standards of review. The regulatory framework shall: 1. Be consistent with the Comprehensive Plan and the Institutional Development Plan. 2. Provide a clear zoning framework, using graphics and tables as appropriate, to apply to future site plan reviews. 3. Provide specific regulatory statements as appropriate that respond to concerns raised during the required public involvement. 4. Outline measurable goals and thresholds for improvements or other actions identified in the IDP to be advanced in subsequent site plan applications. F. Approval/adoption. The Planning Board shall review the proposed regulatory framework against the standards of review and make a recommendation on the institution’s IOZ designation and regulatory framework to the City Council for adoption as part of this Land Use Code. G. Amendments. A regulatory framework and IOZ boundary as adopted by the City Council shall remain in force unless and until amended. Amendments to a regulatory framework and/or IOZ boundary may be brought forth by the City or eligible institution. Proposed amendments to the IOZ boundary or regulatory framework shall be reviewed by the Planning Board and adopted by the City Council subject to the provisions of this ordinance. 8.3.6 Maine Medical Center Institutional Overlay Zone Regulatory Framework A. Applicability. All development proposed by Maine Medical Center (MMC) within the boundary of the MMC Institutional Overlay Zone (IOZ) shall be consistent with the approved Institutional Development Plan (IDP), consistent with the Comprehensive Plan, and meet applicable standards of the Land Use Code, unless such standards are superseded by the following regulatory framework. This regulatory framework shall govern future development by MMC within the IOZ unless amended by the Portland City Council upon formal application of MMC. The MMC Institutional Overlay Zone shall have the boundaries depicted in Figure 8-C, and shall include the properties listed in Table 8-B. B. Updates and amendments. It is intended that the IDP will be updated on a regular basis to FIGURE 8-C: MMC IOZ BOUNDARY [image omitted; see the official code] Note: Refer to Table 8-C for a list of permitted uses. TABLE 8-B: LIST OF PROPERTIES INCLUDED IN THE MMC IOZ Map# | Legal Description | Address | Acreage | Ownership 1 | 64-A-2-8-9-11/74-A-7/75-A-6 | 222 St John St. | 4.6516 | Owned by others 2 | 68-D-1-3-13-14-16 | 180 St John St. | 0.9494 | Owned by others 3 | 65-G-1 | 950 Congress St. | 0.4628 | Owned by others 4 | 64-B-1 | 275 St John St. | 0.4163 | Owned by others 5 | 65-G-2 | 942 Congress St. | 0.0659 | Owned by others 6 | 65-G-3 | 940 Congress St. | 0.0482 | Owned by others 7 | 65-G-4 | 274 Valley St. | 0.0667 | Owned by others 8 | 65-G-5 | 268-270 Valley St. | 0.0978 | MMC 9 | 64-B-2 | 262-266 Valley St. | 0.0895 | MMC 10 | 65-H-1 | 932 Congress St. | 0.1864 | MMC 11 | 65-H-9 | 261 Valley St. | 0.2185 | MMC 12 | 65-H-2 | 930 Congress St. | 0.1040 | MMC 13 | 65-H-5 | 52 Gilman St. | 0.2384 | MMC 14 | 65-H-8 | 44 Gilman St. | 0.1128 | MMC 15 | 65-E-22 | 85 Gilman St. | 0.0565 | Owned by others 16 | 65-E-32 | 85 Gilman St. | 0.0282 | Owned by others 17 | 65-E-24 | 81 Gilman St. | 0.1653 | Owned by others 18 | 65-E-28 | 919 Congress St. | 0.1059 | Owned by others 19 | 65-E-29-30 | 909 Congress St. | 0.3233 | Owned by others 20 | 65-E-19 | 22 Forest St. | 0.0826 | Owned by others 21 | 65-E-21 | 18 Forest St. | 0.0831 | Owned by others 22 | 65-E-23 | 14 Forest St. | 0.0826 | Owned by others 23 | 65-E-25 | 12 Forest St. | 0.0883 | Owned by others 24 | 53-I-1-2-3-12 | 887 Congress St. | 1.3400 | MMC 25 | 53-X-1 | Congress St. Pedestrian Walkway | --- | MMC 26 | 53-D-7/54-H-1/64-C-1 | 22 Bramhall St. | 12.563 | MMC 27 | 54-C-6 | 34 Ellsworth St. | 0.1341 | MMC 28 | 54-C-10 | 40 Ellsworth St. | 0.1155 | MMC 29 | 54-I-1 | 308 Brackett St. | 2.5200 | MMC 30 | 63-B-8 | 214 Vaughan St. | 0.1983 | MMC Properties owned by MMC are listed under MMC or MMC Realty Corp. MMC will not extend its functionally-related Bramhall campus hospital operations beyond the boundary of the IOZ within the City of Portland without further amendment to the IDP. This includes any expansion of functionally-related operations that displace residential uses outside of the IOZ boundary. A functional relationship is defined as uses or activities that are traditionally or customarily linked to the day-to-day operations of the MMC Bramhall Campus that would relocate a significant proportion of the total employee population or activities. ensure that the data is current and that the document remains accurate. Accordingly, monitoring reports will be filed every three years and shall include a summary of progress on IDP implementation and of acquisitions and divestment since the date of IDP approval. At the time of the submission of the monitoring report, MMC shall identify any updates to the IDP which may result from updated master planning, changes in baseline information, or changes in the adjacent neighborhoods which affect MMC, to allow the IDP to remain current. Updates and minor amendments not described below shall be reviewed administratively by the Planning Authority. 1. Minor amendments that impact phasing of the long-term development blocks or change the approach to parking, transportation, neighborhood engagement or design shall be reviewed by the Planning Board for consistency with the objectives of the IDP. In addition to consistency with the objectives of the IDP, review of phasing and development program amendments shall focus on integration with the campus and impacts on transportation or infrastructure. This review may occur simultaneously with the site plan review of an anticipated project. 2. Major amendments shall be reviewed by the Planning Board and are required under the following circumstances: a. A change to the regulatory framework is required. b. The IDP is no longer representative of the institutional mission or approach to community as a result of redevelopment in the area or City TABLE 8-C: PERMITTED USES | Healthcare facilities, including but not limited to the following ancillary and/or supporting uses: • | Hospital • | Medical office/Clinic • | Laboratory center/services • | Research and development (R&D) laboratory or facility • | Educational facility/Conference center • | Administrative/Business office • | Accessory service or trade uses • | Guest house • | Multi-family housing for healthcare staff and students • | Rehab/Skilled nursing facility • | Retail • | Restaurant/cafe • | Employee service amenities • | Day care center • | Fitness center or gymnasium • | Parking lot or garage • | Bicycle storage • | Heliport • | Antenna station • | Outdoor use areas, such as green areas, parks, gardens, art installations, and other active and passive non-commercial recreation spaces upgrades to neighborhood planning (such as roadway changes, infrastructure upgrades, community design, lighting). c. Development proposed by MMC is inconsistent with the master facility plan, transportation plan intent, design plan intent, or environment and infrastructure plan intent identified in the IDP. 3. Annual monitoring reports will be submitted for MMC's Transportation Demand Management (TDM) Plan. TDM monitoring reports shall include a summary of progress towards targets established in the TDM Plan. C. Uses. In addition to the uses permitted in the underlying zone, the uses in Table 8-C are permitted as a matter of right. In recognition that MMC is part of a mixed-use area of the city, with important existing services and businesses that serve the local and wider community, healthcare facility development fronting onto Congress Street and St. John Street shall activate the public realm, to the extent able, with uses such as service and retail/restaurant, landscaping, active building entrances, pocket parks, etc., on the ground or other publicly accessible level, consistent with the design intent contained in the approved IDP. In areas identified in the IDP as “Priority zone for commercially oriented/retail uses,” usable ground floor retail, restaurant, or comparable community-oriented use that provides services to local residents and employees both during the day and evening hours is required. In areas labeled “Street activation through location of windows, entrances, etc.,” usable ground floor retail, restaurant, or community-oriented use is encouraged to the extent practicable. Such uses, where constructed or facilitated as part of a healthcare related development, are expressly permitted whether ancillary or supporting the healthcare facility or not, and shall be open and welcoming to the general public in addition to employees or visitors of MMC. D. Dimensional requirements. The MMC Institutional Overlay Zone shall have the dimensional requirements listed in Table 8-D and depicted in Figures 8-C and 8-D. E. Design. New buildings within the IOZ shall adhere to the design guidelines set forth in Chapter 5: Design of the IDP and the site plan standards of Article 13. F. Signs 1. At the time of first site plan review following IDP approval, a unified campus-wide signage plan shall be submitted for review and approval by the Planning Authority. Any update to such plan due to a change in name or logo shall not require amendment to the IDP. 2. Signs shall be designed in accordance with the campus-wide signage plan. All signs shall be designed in proportion and character with building facades and adjacent street typology. All signs shall be coordinated with the building and landscaping design and be constructed of appropriate permanent, high quality materials and finishes. G. Transportation 1. Transportation Demand Management (TDM) a. At the time of the first site plan review following IDP approval, MMC shall submit a campus-wide TDM Plan substantially in accordance with those TDM objectives and strategies identified in the approved Institutional Development Plan. The TDM Plan may be phased into short-, mid-, and long-term actions to allow for progressive implementation over time. b. The TDM Plan shall be designed to provide transportation choice with the goal of reducing parking demand TABLE 8-D: MMC IOZ DIMENSIONAL REQUIREMENTS Building heights (max.) | Max. building heights for new buildings within the IOZ shall be governed by the Maximum Building Heights Map in Figure 8-D, or by the transition zones clause of this table for those buildings located in transition zones. Refer to IDP “Chapter 5. Design” for methodology on determining heights. Building heights (min.) | Three stories, except in transition zones, where the minimum building height shall be two stories. Minimum building heights shall not apply to building awnings, associated kiosks, pavilions or similar building components. Building length (max.) | Length of proposed parking garage at 222 St John St shall not exceed 500 feet as measured roughly parallel to St John St. Building setbacks (min.) | Minimum building setbacks shall be governed by the Minimum Setbacks Map in Figure 8-E. Additional requirements are listed in the transition zones and Congress Street build-to zone sections of this table. Congress Street build-to zone1 | A build-to zone is identified for some properties that abut Congress Street. See Minimum Setbacks Map in Figure 8-E for the location of build-to zone. i. The Congress Street build-to zone extends between 0 to 40 feet from the right-of-way boundary. ii. Buildings located in these parcels must have a minimum of 70% of the façade facing Congress Street located within the build-to zone. Transition zones | Transition zones are identified inside the IOZ boundary in areas where the IOZ abuts or is located across a public right-of-way from a residential zone or a historic-designated district. See Maximum Building Heights Map in Figure 8-D for location of transition zones. i. Transition zones shall extend 50 feet into the parcel from the parcel boundary. ii. Transition zones that abut a Residential zone with or without an intervening public right-of-way shall have a maximum height limit that matches the maximum height permitted within that Residential zone. iii. In areas where the IOZ abuts a residential zone without an intervening public right-of-way, minimum side and rear yard requirements of the abutting residential zone apply within the IOZ boundary, unless noted otherwise in Minimum Setbacks Map in Figure 8-E. 1A "build-to zone" is the area on the lot where all or a portion of the street-facing building facade must be located, measured as a minimum and max. yard (setback) range from the public right-of-way boundary. FIGURE 8-D: MMC IOZ MAXIMUM BUILDING HEIGHTS [image omitted; see the official code] FIGURE 8-E: MMC IOZ MINIMUM SETBACKS [image omitted; see the official code] and single-occupancy vehicle trips to and from MMC by employees and visitors. b. The TDM Plan shall establish parking and trip reduction targets associated with the short-term (0-2 years), mid-term (2-5 years), and the long-term (5+ years), as well as a data collection plan. 2. Parking. Parking requirements in the IOZ shall be established at the time of site plan review based on a parking study that includes a campus-wide analysis of demand and supply. The parking demand study shall determine parking requirements and shall be sufficient to alleviate parking pressure on surrounding neighborhoods. Parking studies developed by MMC shall integrate parking and trip reduction achievements and data contained in the TDM Plan. H. Environment. Development proposed by MMC shall be designed to integrate with the surrounding context, including open space and pedestrian networks and infrastructure. I. Mitigation measures. MMC shall mitigate site plan impacts to off-premise infrastructure in a manner proportionate to those impacts. Mitigation may include financial or in-kind contributions to existing or planned City projects focused on mitigating the impacts of MMC development. Mitigation contribution shall be determined based on the City’s standard procedure in effect at the time of site plan review. J. Neighborhood integration and engagement 1. For the purpose of keeping surrounding residential areas appraised of its future development plans, and to address any neighborhood issues related to the operations of the MMC Bramhall campus, MMC shall adhere to the ongoing community engagement principles identified in the approved Institutional Development Plan. 2. MMC shall conduct ongoing community engagement, including the formation of a Neighborhood Advisory Committee comprised of representatives of MMC, the Parkside neighborhood, the West End neighborhood, the Western Promenade Neighborhood Association, the St. John Valley neighborhood, the Libbytown neighborhood, and the City. K. Construction management 1. At the time of site plan review, MMC shall submit a construction management plan substantially in accordance with those construction management principles identified in the approved Institutional Development Plan for review and approval by the Planning Authority. 2. The construction management plan shall include a construction schedule, as well as strategies for managing neighborhood communication and noise, air quality, traffic, and parking impacts associated with the construction as set forth on the construction management template developed by the City and attached and incorporated to the IDP as Appendix A. L. Other requirements 1. Helipad. Proposed changes to MMC's helipads, including changes to preferred flight routes, shall be reviewed and approved by the Planning Authority in accordance with the approved Institutional Development Plan. 2. Snow ban parking. When the City of Portland declares a snow parking ban, MMC shall make parking available to neighbors in a designated parking area on or near its campus upon the following condition: Due to the patterns of patient flow in the hospital, the hours of snow ban parking for registered vehicles during an announced City of Portland snow parking bans are 6:00 p.m. until 6:00 a.m. Vehicles that are not moved out of these parking areas by the applicable time each morning are subject to towing at the owner’s expense. 3. Healthy communities. Recognizing that a stable residential and commercial environment is key to the health of any neighborhood, MMC commits to supporting its existing and future neighbors in the St. John Valley, Parkside, West End, Western Prom, and Libbytown neighborhoods. Accordingly, MMC shall implement and participate in the healthy communities programs as described below. a. Caring Community Grants. MMC shall develop an annual grant program with available funds of up to $30,000. Goals, priorities, eligibility requirements, program guidelines, and allocation approach will be developed by the MMC Neighborhood Advisory Committee, as described in Chapter 6 of the IDP approved on September 26, 2017. Neighborhood associations or other entities located or operating in the St. John Valley, Parkside, West End, Western Promenade, and Libbytown neighborhoods may apply for grant funding relating to the following initiatives: i. Neighborhood investment and Infrastructure: Focused on creating strong, safe, accessible and vibrant neighborhoods. ii. Quality of life: Focused on improving access to recreation, arts or cultural experiences in the neighborhoods. iii. Diversity and inclusion: Focused on fostering the building of relationships and understanding among diverse groups, including capacity building and outreach activities. iv. Public Safety: Focused on supporting public safety programs through training programs, equipment or other means in the neighborhoods. v. Environmental sustainability: Focused on preventing waste, increasing recycling or supporting other programs that work to improve the environment. b. Healthy Neighborhoods Program. MMC shall initiate and adopt a memorandum of understanding (MOU) by and between MMC, the City of Portland, and other community partners establishing a Healthy Neighborhoods program. Such a program shall be designed to fund and execute housing and community improvement and development programs in St. John Valley and the other neighborhoods surrounding MMC’s Bramhall Campus. 8.3.7 The Roux Institute at Northeastern University Overlay Zone Regulatory Framework A. Applicability. All development proposed by the Roux Institute at Northeastern University (“Roux Institute”) within the boundary of the Roux Institutional Overlay Zone (IOZ) shall be consistent with the approved Institutional Development Plan (IDP), consistent with the Comprehensive Plan, and meet applicable standards of the Land Use Code, unless such standards are superseded by the following regulatory framework. This regulatory framework shall govern future development by the Roux Institute within the IOZ unless amended by the Portland City Council upon formal application of the Roux Institute. The Roux Institutional Overlay Zone shall have the boundaries depicted below and shall include the approximately thirteen-acre property located at 1 Bean Pot Circle and identified as parcels 447-Aoo1 and A002 in the City’s assessing records. B. Phasing and monitoring 1. The Roux Institute campus will be developed in phases, as set forth in the IDP. The IDP will be updated on a regular basis to ensure that the data is current and that the document remains accurate. Accordingly, monitoring reports will be filed every three years and shall include a summary of progress on IDP implementation and of acquisitions and FIGURE 8-F: ROUX INSTITUTIONAL OVERLAY ZONE BOUNDARY [image omitted; see the official code] divestment since the date of IDP approval. At the time of the submission of the monitoring report, any updates to the IDP shall be identified which may result from updated master planning, changes in baseline information, or changes in the adjacent neighborhood which affect the campus, to allow the IDP to remain current. Updates and minor amendments not described below shall be reviewed administratively by the Planning Authority. 2. At completion of each phase, the Roux Institute campus shall have the appearance of a complete and comprehensive design. Permanent and meaningful public space shall be established in the first phase to ensure public benefit. Interim conditions shall be designed for a pleasant pedestrian experience through planting, lighting, wayfinding, graphics, artwork, or ornamental fencing to provide screening, buffers, and enhancement. Interim areas of the site which are not actively used for parking or construction staging will be appropriately landscaped or accommodate gathering on lawns or other aesthetically hardened spaces. 3. Minor amendments that change the approach to parking, transportation, neighborhood engagement or design shall be reviewed by the Planning Board for consistency with the objectives of the IDP. This review may occur simultaneously with the site plan review of a proposed project. 4. Major amendments shall be reviewed by the Planning Board and are required under the following circumstances: a. A change to the regulatory framework is required. b. The IDP is no longer representative of the institutional mission or approach to community as a result of redevelopment in the area or City upgrades to neighborhood planning (such as roadway changes, infrastructure upgrades, community design, lighting). c. A change in approach to parking, transportation, neighborhood engagement or design is inconsistent with the objectives of the IDP, resulting in a modification to the applicable objectives. 5. Review of major amendments may occur simultaneously with the site plan review of the proposed project. C. Uses 1. The Roux Institute campus will encompass a variety of uses to support the mission of the Institute. Campus uses will include classrooms and laboratories, housing, faculty offices, dining areas, convening spaces, fitness centers, retail facilities, entrepreneurial spaces, light manufacturing, incubator space, research and design facilities, hotel, and office space. The mixture of uses is intended to support collaboration with private industry, other institutions, and community organizations. A range of rental housing options will provide on-site opportunities for students, faculty, staff, and their families, easing some of the housing pressure and traffic that might otherwise result from new residents attracted to Portland by the institute. Housing units not occupied by residents affiliated with the Roux Institute may be made available to the public to further assist in easing the housing pressure. 2. The Roux Institute campus will be designed to include uses that will welcome neighbors to the campus, including publicly available open space, waterfront access, recreational opportunities, restaurant, dining, small neighborhood grocery, and/or other limited retail options. 3. In addition to the uses permitted in the underlying zone, laboratory and research facilities, low-impact industrial uses, and high-tech manufacturing shall also be permitted as a matter of right in all buildings that are located within the IOZ and on land owned or leased by the Roux Institute. On the pier residential uses are explicitly prohibited and any allowed use on the pier must be a functionally water-dependent use. Ground floor retail, restaurant, or comparable community-oriented uses that provide services to local residents, students, faculty and staff shall be expressly permitted whether ancillary to or supporting the educational institution, and shall be open and welcoming to the general public. 4. Within the boundary of the IOZ, hotels shall be limited as follows: a. No more than one hotel shall be located in the IOZ. b. The hotel shall contain no more than 130 rooms. c. The hotel shall be no more than eight stories in height, not including structured parking. There shall be no more than two levels of above grade structured parking beneath the first floor of the hotel. Nothing herein is intended to preclude the co-location of hotel use and structured parking on one or more levels of the hotel. D. Dimensional requirements 1. Applicability. All principal buildings and structures located within the IOZ and located on land owned or leased by the Roux Institute shall be subject to the dimensional requirements of the underlying zone, except where modified by the provisions of this section. 2. Rules of measurement a. Publicly accessible corridor: A corridor accessible to the general public that is open to the sky or enclosed with a minimum width of 20 feet. Enclosed portions of publicly accessible corridors shall have a minimum height of 30 feet. b. Street wall: Within the Roux IOZ the term “street wall” shall mean a wall or portion of a wall that includes the principal entry to a building facing a street, public right-of-way, major pedestrian access routes, or open spaces. Orientation of the principal entry to a building shall be determined by the applicant. 3. Maximum building heights. Maximum building heights for new principal buildings in the IOZ shall be governed by the Roux IOZ Height Map (Figure 8-G). 4. Minimum and maximum street wall heights. New principal buildings in the IOZ shall rise to a minimum street wall height of 45 feet and may rise to a maximum street wall height of 105 feet. 5. Stepback requirements. At a height not lower than the minimum street wall height or higher than the maximum street wall height, a stepback with a minimum depth of at least 10 feet shall be provided. Required stepbacks shall only apply to a building’s street wall. 6. Building length requirements a. For buildings with a length greater than 250 feet, a continuous, publicly accessible corridor that connects two streets, public rights-of-way, major pedestrian or bicycle access routes, or open spaces shall be provided, with the precise location to be identified, defined, and reviewed under site plan review. Building length shall be measured at grade in a straight line between the outer corners of the designated street wall. b. Publicly accessible corridors need not be linear and may have necessary grade changes. c. Any building wall situated along a publicly accessible corridor shall be designed to provide sufficient architectural and graphic amenities to provide visual interest, transparency between interior activities and pedestrian activity, or active uses and relate the building, and its use to passersby. d. Publicly accessible corridors shall: i. Include bicycle and pedestrian amenities such as benches and other seating; ii. Be illuminated to levels that are adequate but not excessive for the safety, comfort, and conveniences of occupants and users of the site, and iii. Provide access to the public during regular operating hours of the institute. e. The Roux Institute may close off public access to a publicly accessible corridor during special events or when determined necessary by the institute for security or public safety purposes. 7. Transitions and buffers a. The campus is surrounded by existing buffers, with I-295 to the west, state-owned vacant parcels to the north, the rail corridor and marine business to the east, and Casco Bay to the south. In addition to the existing buffers, development shall further ease the transition to and from the campus. b. Public open space will ease transition from the smaller scale of Sherwood Street. A transition onto the campus will also be accomplished through thoughtful façade design at the pedestrian level. Potential nuisance features like dumpsters, air handlers, and parking will be appropriately screened. Buildings will avoid blank walls to respect the adjacent neighborhood and facilitate a sense of permeability and welcome. c. The shoreline transition area between the buildings and the water will serve as meaningful public open space. Building facades facing the water will be considered public-facing, with views designed for interest from the water and Eastern Promenade Trail. d. The transition area between the campus and I-295 contains a height limitation of 75 feet along the edge and between the highway and the B&M Cannery Building, preserving the historic view of the building from the highway and easing the transition to the greater allowable building heights in the center of campus. e. The transition area along the edge of the campus adjacent to the rail corridor also contains a height limitation of 75 feet along the edge of the property closest to the residential neighborhood, further easing the transition to the greater allowable FIGURE 8-G: ROUX IOZ HEIGHT MAP [image omitted; see the official code] building heights at the center of campus, mitigating shadow impacts to adjacent properties. E. Transportation 1. Transportation demand management (TDM) a. At the time of the first site plan review following IDP approval, the developer shall submit a campus-wide TDM Plan substantially in accordance with those TDM objectives and strategies identified in the approved IDP. The TDM Plan may be phased into short-, mid-, and long term actions to allow for progressive implementation over time. b. The TDM Plan shall be designed to provide transportation choice with the goal of reducing parking demand and single-occupancy vehicle trips to and from the Roux Institute campus and from the Roux Institute campus by students, faculty, staff, institutional partners, and visitors. c. The TDM Plan shall establish parking, mode share, and trip reduction targets associated with each phase of development, as well as a data collection plan. d. Annual monitoring reports will be submitted for the TDM Plan. TDM monitoring reports shall include a summary of progress towards targets established in the TDM Plan. If deficiencies are identified, they will be resolved in accordance with the site plan approval. 2. Traffic movement permit (TMP) a. Any development that will generate over 100 passenger car equivalents will trigger TMP review which will determine applicable mitigation for that development program. There are contributions anticipated to area-wide elements to support trip reduction targets, such as contribution to the development of shared use path infrastructure and support for additional transit service to the campus. The TMP review may consider an individual site plan or may cover more than one site plan. Each of the TMP submissions and review will continue to contemplate capacity for multimodal connections to continue to reduce automobile trips. b. Mode shares and trip reduction targets have been identified in the IDP and will be updated and modified with each TMP submission as necessary. 3. Bicycle and pedestrian access and safety a. A Transportation, Access, and Circulation Plan has been provided in the IDP. At the time of the first site plan review, the developer shall submit an updated Plan. Where possible, the bicycle and pedestrian access routes shall connect to established bicycle and/or pedestrian facilities. The developer shall look to establish new bicycle and pedestrian bicycle and/or pedestrian facilities where feasible. b. The site and building design shall not prohibit the enhancement of transit service to and from the site. c. Bicycle, pedestrian, transit, and motorized vehicular facilities proposed to and from the site shall provide sufficient capacity and allow for safe connections for modes of transportation. d. Sherwood Street shall be improved to accommodate bicycles and pedestrians within the existing right-of-way. Separate sidewalks and bicycle lanes shall be provided where feasible. 4. Parking. Parking requirements in the IOZ, including but not limited to parking ratios, shall be established at the time of site plan review for each phase of development based on a parking study that includes a campus-wide analysis of demand and supply. Parking studies shall integrate parking and trip reduction achievements and data contained in the TDM Plan. Parking requirements shall be determined in accordance with the requirements in the Land Use Code in effect at the time of site plan review. 5. Circulation a. The campus shall contain a bike and pedestrian circulation network which includes a perimeter access loop, an internal system of pathways and a major campus “promenade” which will link campus developments, the upland, and the waterfront. b. The perimeter access path for bicycle and pedestrians will serve to connect the campus to primary site entry points from the community and provide a continuous recreational loop. Where appropriate, the perimeter access path will be enhanced by wayfinding, lighting, landscaping, and safe crossings at vehicular intersections. Where possible, building facades will respond to the perimeter access path for views into the building and periodic activation to building entrances. c. Internal campus circulation pathways will connect major open spaces, buildings entrances, and outdoor plazas to create a network of multiple pathways including the perimeter access path. Pathways will be located along or oriented toward facades that have active programs, architectural articulation, appropriately scaled entrances, and windows. Pathways will avoid traveling along stretches of undifferentiated or blank facades back doors or service areas. Pathways will be generally lower-velocity systems than the access loop. Where appropriate, the internal campus circulation pathways will be enhanced by wayfinding, lighting, landscaping, and safe crossings at vehicular intersections. d. The campus promenade will serve as a major organizing feature connecting the upland and the water and providing access to open spaces, allowing views of the principal campus of buildings, and connecting to the internal campus circulation pathways and perimeter access path. The promenade will be enhanced by lighting, wayfinding, landscape buffers, and open spaces. Viewsheds and topography along the promenade will emphasize the Roux Institute and Burnham & Morrill (B&M) Cannery Building, pier, and other principal buildings and spaces. F. Environment 1. The IOZ shall contain a minimum of three acres of public open space designed to enhance waterfront access and provide bicycle/pedestrian network connectivity. This open space requirement shall be met at the completion of construction of the first site plan approval and shall be maintained at all phases of development. The three acres need not be contiguous and may be provided in new and/or different locations following completion of development phases. The public open space shall be meaningful space, functioning as recreation areas, social gathering spaces, or natural buffers consisting of a diverse mix of native woody and herbaceous vegetation, including a well-distributed mix of trees. The method of assuring public access to the public open space shall be determined at site plan review. 2. A Sustainability and Resilience Charter will be created by the Roux Institute for the campus. The charter shall contain sustainability goals related to development categories such as energy, water, transportation, equity, and resilience and may be revised over time in response to evolving technology and industry standards. The charter will require all development on the campus to utilize critical components of industry standard benchmarking systems such as LEED, SITES, WELL, ILFI, and Passive House. The charter will be submitted to the Planning Authority prior to submission of the first site plan application. Proposed site plans shall be consistent with the goals outlined in the charter. 3. Development shall utilize lighting designs required for safety and comfort and that minimize impact to the night sky in accordance with light pollution reduction standards in ANSI/ASHRAE/IESNA 90.1-2007 or its most current edition. 4. Development shall be carried out in such a way as to minimize the impacts of sea level rise, protecting infrastructure and site features by designing to a minimum of 2-feet above the Base Flood Elevation (BFE) as shown on the most current FEMA Flood Insurance Rate Map. 5. The shoreline edge and immediate adjacent upland shall be protected through shoreline armoring and vegetation to prevent erosion and enhance natural resource protection. Vegetation shall consist of a diverse mix of native woody and herbaceous vegetation. Work in coastal wetlands and significant wildlife habitats (as defined by the Maine Department of Environmental Protection) will be minimized to the maximum extent practicable and shall comply with all applicable local, state and federal permitting requirements in effect at the time. 6. Design of exterior building envelopes will be in developed in compliance with the bird-friendly building and design requirements set forth in Article VII-A of Chapter 6 of the City of Portland Code of Ordinances, except that bird safe materials must be used for the entire façade of all buildings regardless of building height. G. Mitigation measures 1. Site plan impacts to off-premise infrastructure shall be mitigated in a manner proportionate to those impacts. Mitigation may include financial or in-kind contributions to existing or planned City projects focused on mitigating the impacts of the development. Mitigation contribution shall be determined based on the City’s standard procedure in effect at the time of site plan review. 2. Impacts to natural resources shall be mitigated in accordance with local, state and federal permitting standards in effect at the time. H. Design. All buildings within the IOZ shall adhere to the design guidelines set forth in the IDP. I. Neighborhood integration 1. Neighborhood engagement a. For the purposes of keeping surrounding residential areas apprised of its future development plans, and to address any neighborhood issues related to the operations of the Roux Institute campus, the Roux Institute shall adhere to the ongoing neighborhood engagement principles identified in the IDP. b. Ongoing community engagement shall be conducted, including the continuation of neighborhood forums and maintenance of the Roux Institute campus website. c. A Community Advisory Group shall be created for the purpose of sharing information on project development, planning, and seeking input. To the extent practicable, the group shall be comprised of representatives of interested groups such as the East Deering Neighborhood, East Deering Neighborhood Association, East Deering Neighborhood for Responsible Development, Front Street Area Neighborhood, a tenant representative from Portland Housing Authority’s Washington Gardens and Front Street developments, recreation, parks and trails, including the Friends of Payson Park, from sustainability, rail, bicycle/pedestrian, public transit, Portland Harbor, Portland Public Schools, including a Presumpscot School parent, higher education, and the business community. d. A designated community contact shall be engaged to be the point of contact for providing information to the neighborhood and receiving feedback. 2. Construction management. At the time of site plan review, Northeastern University shall submit a Construction Management Plan substantially in accordance with the construction management principles identified in the Institutional Development Plan for review and approval by the Planning Authority. J. Historic preservation 1. Historic preservation review. The B&M Cannery Building has been designated as a local historic landmark. The area of designation includes the B&M Cannery Building, as well as the area of the former Codfish Building and pier. The Historic Preservation Board’s review of activity within the site of the former Codfish Building and pier is limited to review of any activity that would require a Certificate of Appropriateness that is proposed on a newly constructed pier. A Certificate of Appropriateness will not be required for the demolition of the Codfish Building or construction of a new pier and related infrastructure, including future alterations to the pier structure. 2. Required interpretive elements. Northeastern University shall include interpretive element(s) on top of or within the surface of the new pier that convey the history and significance of the Codfish Building. Prior to construction of said elements, the University shall submit the proposal to the Historic Preservation Board for its review and approval. The interpretive elements shall be designed in a manner that does not interfere with the use and functionality of the pier as a marine passenger facility and for water access by the Roux Institute and the public. 3. 100-foot review exemption. The B&M Cannery Building is exempt from Subsection 13.6.4(E)(2) for review of development within 100 feet of a landmark. FIGURE 8-H: UNE IOZ BOUNDARY [image omitted; see the official code] 8.3.8 The University of New England Overlay Zone Regulatory Framework A. Applicability. The regulatory framework shall apply only to development proposed by the University of New England (UNE) within the boundary of the Institutional Overlay Zone (IOZ) and to which UNE holds right, title, or interest. The regulatory framework shall not apply to any land zoned OS-P. Properties in the UNE IOZ shall continue to be governed by the regulations applicable to the underlying zone except as specifically modified by the regulatory framework. The UNE IOZ shall have the boundaries depicted in Figure 8-H. B. Phasing and monitoring 1. UNE shall file monitoring reports every five years with the Planning Authority. Monitoring reports shall ensure that data in the IDP is current and provide a summary of progress on IDP implementation, including details of acquisitions and divestments since the date of IDP approval. Monitoring reports TABLE 8-E: PERMITTED USES Two-family dwellings | ⏺ | Three-family dwellings | ⏺ | Four-family dwellings | ⏺ | Townhouse dwellings | ⏺ | 6.4.13 Multi-family dwellings | ⏺ | Live/work dwellings | ⏺ | Lodging houses | ⏺ | 6.4.21 Child care centers + small child | ⏺ | 6.4.9 Clinics | ⏺ | Cultural facilities | ⏺ | Elementary, middle, and secondary | ⏺ | Governmental uses | ⏺ | Places of assembly | ⏺ | Post-secondary schools | ⏺ | Bars | ⏺ | General offices | ⏺ | General services | ⏺ | Hotels | ⏺ | Intermodal transportation facilities | ⏺ | Market gardens | ⏺ | 6.4.25 Recreation and amusement | ⏺ | Restaurants | ⏺ | Retail | ⏺ | Specialty food service | ⏺ | Studios for artists | ⏺ | Theaters and performance halls | ⏺ | Veterinary services | ⏺ | Animal-related services | ⏺ | Communication studios | ⏺ | Laboratory and research facilities | ⏺ | Low-impact industrial | ⏺ | Studios for artists and | ⏺ | Off-street parking | ⏺ | Parks and open spaces | ⏺ | Solar energy systems (minor) | ⏺ | 6.4.38 Utility substations | ⏺ | 6.4.39 Wind energy systems (minor) | ◐ | 6.4.41 Key: ⏺ = permitted | ◐ = conditional shall include data on UNE’s environmental compliance and the number of Best Management Practices (BMPs) implemented to address stressors and pollutant sources identified in the Capisic Brook watershed. 2. Interim conditions shall be designed for a pleasant pedestrian experience through planting, lighting, wayfinding, graphics, artwork, or ornamental fencing to provide screening, buffers, and enhancement. Interim areas of the site which are not actively used for parking or construction staging will be appropriately left in a natural state, landscaped or accommodate gathering on lawns or other aesthetically hardened spaces. C. Uses. Permitted uses are listed in Table 8-E. D. Dimensional requirements. 1. For the purposes of this IOZ, “lot” is defined as the contiguous lots under UNE ownership, including land separated by a public or private right-of-way. The “lot” boundary is shown in Figure 8-H. 2. Side and rear setbacks shall not be required between buildings on contiguous lots owned by UNE on the condition that such contiguous lots shall be considered merged and shall not be separately conveyed unless required setbacks in the underlying zones are provided. 3. Maximum building heights for new principal buildings in the IOZ shall be governed by the maximum building heights map in Figure 8-I. TABLE 8-F: DIMENSIONAL STANDARDS Lot area (min.) | -- Street frontage (min.) | -- Gross floor area (max.) (Nonresidential uses on the ground floor only, unless otherwise permitted or restricted) | -- Build-to zone | 0–10 ft. Build-to percentage (min.) | 100% Building length as a percentage of street frontage (min.) | B-2: None Blank wall area (max.) | 20 ft. Rear setback (min.) | None, except 25 ft. if abutting a lot outside of the IOZ boundary in a residential zone Side setback, interior (min.) | None, except 5 ft. if abutting a lot in a residential zone Structure height (min.) | 75 ft., or as shown on the UNE Height Map Landscaped open space ratio (min.) | B-2: 10% E. Transportation 1. Transportation demand management (TDM). At the time of the first site plan review following IDP approval, UNE shall submit a campus-wide TDM Plan substantially in accordance with those TDM objectives and strategies identified in the approved IDP. The TDM Plan may be phased into short-, mid-, and long- term actions to allow for progressive implementation over time. 2. Parking. Parking requirements in the IOZ hall be established at the time of site plan review based on a parking study that includes a campus-wide analysis of demand and supply. Parking studies shall integrate parking and trip reduction achievement and data contained in the TDM Plan. F. Environment. All new buildings and parking facilities proposed by UNE shall integrate with the surrounding context to allow connectivity amongst open space, pedestrian networks, and the Evergreen Cemetery, and to protect the critical natural resources associated with the Capisic Brook watershed. The Planning Board may approve a reduction of the setback requirement for a new building to the least amount necessary to achieve the goals of the development and minimize overall impacts, provided that the setback is not reduced to less than 40 feet. G. Mitigation measures 1. Site plan impacts to off-premise infrastructure shall be mitigated in a manner proportionate to those impacts. Mitigation may include financial or in-kind contributions to existing or planned City projects focused on mitigating the impacts of the development. Mitigation contribution shall be determined based on the City’s standard procedure in effect at the time of site plan review. 2. Impacts to natural resources shall be mitigated in accordance with local, state, and federal permitting standards in effect at the time. H. Design 1. All new development shall be designed to create a cohesive campus character. 2. New buildings shall be designed with building entrance(s) and principle facades oriented towards existing campus buildings, open space, streets, and pedestrian pathways. 3. New buildings will minimize visual impact of service areas, loading docks, and utility structures. 4. All new development shall provide a variety of open spaces that integrated into the existing campus. 5. All new development shall provide adequate lighting for clear visibility at streets, pedestrian pathways, building entries, and parking areas. All lighting shall be compliant with UNE’s lighting plan, which is included in the IDP. 6. All signage shall be compliant with UNE’s signage design standards, which are included in the IDP. I. Neighborhood integration 1. For the purposes of keeping surrounding residential areas appraised of its future development plans, and to address any neighborhood issues related to the operations of the UNE campus, UNE shall adhere to the ongoing neighborhood engagement principles identified in the IDP. 2. Ongoing community engagement shall be conducted, including the continuation of posting project update’s on UNE’s Campus Planning web page and the creation of a dedicated email address for neighbor communication UNE’S Planning Department. 3. UNE shall conduct annual neighborhood outreach through neighborhood meeting(s), to be hosted on campus, and shall provide the Planning Authority with a copy of the neighborhood notice and a record of participants, content, and feedback as described in Section 13.5.5(C). 4. A designated community contact shall be engaged to be the point of contact for providing information to the neighborhood and receiving feedback. FIGURE 8-I: UNE IOZ MAXIMUM BUILDING HEIGHTS [image omitted; see the official code]

Ask a question about Portland law

Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.