For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

2:43.5 — Major user sampling and analyses

Code of the City of Ann Arbor, Michigan (Supp. No. 26: codified through Ordinance No. 26-22, enacted July 20, 2026) · Ann Arbor City Code § 2:43.5

Corpus is an independent public-information project, not the official City of Ann Arbor website. Stable reference: corpuslaw.us/code/387efdc8-8117-4ee2-bbdb-b82504c5b957

2:43.5. - Major user sampling and analyses.

Unless otherwise modified by a use permit, the following shall apply: (1) Subject to events beyond the control of the major user, major users shall sample or cause to be sampled their discharge by composite flow proportioned sampling. Dilution is prohibited (see section 2:43.2). The major user shall submit a written description of the specific sampling method, sampling equipment, sampling frequency and sampling location to the Administrator and obtain the approval of the Administrator. For users with a new source, this approval shall be obtained prior to commencement of the discharge. major users discharging as of the effective date of this section shall obtain the approval within 90 days of that effective date. (2) Major users may request to not perform self-monitoring, and upon approval by the city, the city will obtain samples using composite flow proportioned sampling or will contract with an independent firm for the sampling. Dilution is prohibited (see section 2:43.2). The major user shall pay a sampling fee to the city to fully reimburse the city for the sampling, including administrative and overhead costs. If the city contracts with an independent firm for the sampling, the major user shall pay the city for amounts paid or to be paid by the city to the independent firm plus any related administrative and overhead costs. (3) Samples shall be analyzed at the sole cost of the major user. If a major user does its own sampling or causes its samples to be taken, then the user shall submit the samples to a laboratory (which may be the major user's own laboratory) approved by the city for analysis. If the major user uses its own laboratory, that major user shall send a split sample to an independent laboratory at least quarterly as a quality control check. If a major user does its own sampling and/or analysis, the city may also take and have analyzed up to 4 daily composites or up to 4 grabs per day for up to 4 days at the sole cost of the major user in any calendar month. if the city takes the samples, the city, in its sole discretion, may analyze the samples in its own laboratory or contract with an independent laboratory for the analysis. (4) The date when a sample is taken, start time, stop time, sample location, sampler programming information, and persons involved in the sampling shall be recorded by the major user if the major user is self-monitoring. (5) Flow measurements shall be taken to determine the daily discharge volume in a manner and with equipment approved by the Administrator. (6) All analytical results shall be submitted to the city by the 15th day following the completion of the reporting frequency if the major user does self-monitoring. Upon request of the major user, the city shall provide copies of analytical results to the major user if the city performs the monitoring. (7) The city shall be provided with splits of any sample taken by a major user if the city requests a split sample. A major user shall be provided with splits of any sample taken by the city if the major user requests a split sample prior to the time the sample is taken. Split samples shall be provided at the time the sample is taken, if possible. (8) A major user (who is performing self monitoring) or the Administrator (if the major user is not performing self monitoring) shall contract with an independent company to maintain; repair, and calibrate the sampling and flow measurement equipment and instruments used to monitor that major user the maintenance, repair, and calibration shall be performed as necessary so that monitoring data is accurate and representative, but in no event less frequently than twice in a calendar year at reasonable intervals. The Administrator, in any event, may inspect and test a major user's flow meters at reasonable times. The city may exempt a major user from some or all of the requirements of this paragraph if the major user demonstrates that accurate and representative monitoring data is being collected.

(Ord. No. 53-94, § 2, 10-3-94; Ord. No. 43-04, § 11, 1-3-05)

Ask a question about Ann Arbor law

Corpus searches the Ann Arbor sections it holds and shows the ones that match, with their citations. Free, no sign-in.