2:45.1 — Permit application

Code of the City of Ann Arbor, Michigan (Supp. No. 26: codified through Ordinance No. 26-22, enacted July 20, 2026) · Ann Arbor City Code § 2:45.1

Corpus is an independent public-information project, not the official City of Ann Arbor website. Stable reference: corpuslaw.us/code/421f2e0f-d0a3-4b00-9901-89685882c293

2:45.1. - Permit application.

A major user must have a use permit to discharge to the POTW. Every non-domestic and majors user shall apply for the permit within 30 days after receipt of a blank application from the city. To establish whether a non-domestic user should be classified as a major user, non-domestic users shall file a permit application with the city which will consist of the following information, to the extent required in the permit application. (1) Name, address, and location of the user. (2) Whether the user is a corporation, partnership, proprietorship, or some other entity (if so, what type of entity), and the name of the person(s) responsible for discharges by the user. (3) Standard Industrial Classification (SIC) number according to the Standard Industrial Manual, Bureau of the Budget, 1972, as amended. (4) Discharge constituents and characteristics including, but not limited to, toxic pollutants as determined by appropriate chemical and biological analyses. Sampling and analyses shall be performed in accordance with procedures established by the U.S. Environmental Protection Agency and contained in 40 CFR, Part 136, as amended. (5) Time and duration of discharges. (6) Average daily and instantaneous peak discharge flow rates in gallons per day, including daily, monthly, and seasonal variations, if any. All flows shall be measured unless other verifiable techniques are approved by the Administrator. (7) Site plans, floor plans, mechanical and plumbing plans and details to show all sewers, sewer connections, inspection manholes, sampling chambers, and other relevant equipment by size, location, and elevation. (8) Description of activities, facilities, and plant processes on the premises including all materials which are or may be discharged to the POTW intentionally or by accident. (9) Nature and concentration of any pollutants in the discharge limited by this chapter, together with a statement regarding whether or not compliance is being achieved with this chapter on a consistent basis and, if not, whether additional operation and maintenance activities and/or additional pretreatment is required for the user to comply with this chapter. (10) Each product produced by type, amount, process or processes, and rate of production. (11) Type and amount of raw materials used (average and maximum per day or other relevant time period), including copies of material safety data sheets. (12) A list and copy of all environmental permits held by the user applicable to the site to which the use permit applies. (13) Any other information as may be deemed necessary by the Administrator to evaluate the permit application. All permit applications shall be signed by the person described in section 2.44.2(9). In the case of new sources, the applicant shall supply estimated expected information to the extent actual data is not available. New sources who will be major users shall submit a complete permit application at least 90 days prior to the commencement of its discharge to the POTW.

(Ord. No. 53-94, § 2, 10-3-94; Ord. No. 43-04, § 11, 1-3-05)