§ 48-2-102 — Definitions
2019 Detroit City Code (Supp. No. 4: codified through Ordinance No. 2024-17, effective March 26, 2024, and Ordinance No. 2024-32, effective June 25, 2024) · Detroit City Code § 48-2-102
Corpus is an independent public-information project, not the official City of Detroit website. Stable reference: corpuslaw.us/code/7bab6c68-c9c5-48e9-98e6-a57fdfcb9705
Sec. 48-2-102. - Definitions.
For the purposes of this division, the following words and phrases shall have the meanings respectively ascribed to them by this section: Alternative compliance measure means a stormwater control measure, which treats stormwater runoff from impervious surfaces: (1) That were in existence as of the effective date of this division, which was January 17, 2019; and (2) Whose construction or reconstruction is not subject to the provisions of this division. Applicant means a person or persons acting as owners or operators of a regulated construction activity on a development site who is seeking approval of a Post-Construction Stormwater Management Plan under this division. Buffer strip means a zone that is used for filtering direct stormwater and stormwater runoff into a stormwater control measure or watercourse and for providing maintenance access to a stormwater control measure. Common plan of development means a regulated construction activity that is completed in phases or stages when such phases or stages share: (1) One or more common City permits related to the regulation of land use, the discharge of wastewater, or a discharge to surface waters or groundwater; or (2) Common infrastructure such as, but not limited to, roadway access or utilities. Construction activity means a human-made activity including, but not limited to, clearing, grading, excavating, construction and paving, that results in a change in the existing cover or topography of land, including any external demolition, modification, or alteration of a development site or the footprint of a building, but does not include re-surfacing of an asphalt, concrete or similar parking lot that does not expose the subgrade. Conveyance means any structure or other means of safely conveying stormwater within a stormwater management system including, but not limited to, a watercourse, closed conduit, culvert or bridge. Demolition means the razing or destruction, in whole or in part, of an existing structure, or the removal of existing impervious surfaces. Development site means the property on which a regulated construction activity will occur or is occurring. Disturbance means an activity, including a regulated construction activity, that disturbs the surface of land or underlying soils, including but not limited to, stripping, grading, grubbing, trenching, excavating, transporting, and filling of land, but does not include the activities of clearing, plowing, tilling soil, or harvesting for the purpose of crop production. Drainage area means the land area from which stormwater runoff drains to a common point, including any area lying beyond the boundaries of a development site as defined in this division. Due Care Plan means the actions a person must undertake and are necessary to protect the public from exposure to contamination present in soil, groundwater, and subsurface vapors. Extraordinarily difficult site conditions means those conditions present at a development site that prevent or preclude the construction of stormwater control measures on any portion of a development site. Impervious surface means any surface area that prevents or substantially impedes the entry of water into the soil in the manner that such water entered the soil prior to development, or which causes water to run off the surface in greater quantities or at an increased rate of flow including, but not limited to, roofs, parking lots, compacted gravel and dirt, driveways, sidewalks, and storage areas. Infiltration rate means a measure of the speed at which water enters into the soil at the surface. Operation and Maintenance Plan means a document that outlines the required maintenance activities and measures associated with an approved Post-Construction Stormwater Management Plan. Post-Construction Stormwater Management Plan means a document that identifies all actions to be taken by an applicant related to a regulated construction activity and that details how an applicant will comply with the requirements and standards set forth in this division and the Stormwater Management Design Manual. Regulated area means the portion of a development site that is used as the basis to determine what performance standards an applicant must meet. Regulated construction activity means construction activity that is subject to this division and that may occupy all or part of a development site. Stormwater control measure means any structure, feature, or appurtenance that is designed, constructed, operated, practiced, or adopted to reduce the quantity, lower the rate, improve the quality, or otherwise control stormwater runoff through retention, detention, infiltration, reuse, or other approved stormwater management techniques. Stormwater Management Design Manual means a document or documents promulgated by the Water and Sewerage Department, which may be amended, detailing criteria, standards, and procedures that an applicant must follow to comply with this division.
(Code 1984, § 56-3-102; Ord. No. 39-18, § 1(56-3-102), eff. 1-17-2019; Ord. No. 2020-43, § 1, eff. 12-16-2020)
Ask a question about Detroit law
Corpus searches the Detroit sections it holds and shows the ones that match, with their citations. Free, no sign-in.
