Sec. 48-2-106. - Post-Construction Stormwater Management Plan and Operations and Maintenance Plan required.

(a) No regulated construction activity may obtain site plan approval until the Water and Sewerage Department has approved a Post-Construction Stormwater Management Plan. (b) Prior to the approval of a Post-Construction Stormwater Management Plan, the applicant shall certify to the Water and Sewerage Department that the applicant has met or will meet all requirements of this division and all other City, county, state, and federal requirements related to erosion control and sediment prevention, surface water resource protection, and stormwater management applicable to the regulated construction activity. (c) The Post-Construction Stormwater Management Plan shall be developed by a professional engineer or landscape architect properly licensed to practice in the State of Michigan and shall include: (1) The discharge location(s) for all post-construction stormwater runoff, which will leave the development site, and the boundaries of the drainage area tributary to each discharge location; (2) The boundaries of the development site, the common plan of development, if applicable, and the regulated construction activity clearly indicating areas of disturbance, the boundaries of any no-build or non-disturbance areas, all points of egress from the development site to a public right-of-way, and all easements and other encumbrances; (3) The required calculations establishing compliance with the postconstruction stormwater management performance standards as set forth in Section 48-2-105 of this Code; (4) The design specifications and calculations, construction details, and locations for all proposed stormwater control measures whether located on the development site or elsewhere; (5) The locations and descriptions of all access drives easements necessary to allow for construction, inspection, operation, and maintenance of all proposed stormwater control measures; (6) An Operation and Maintenance Plan containing all required information and schedules as set forth in this division; and (7) A copy of all applicable state and federal permit applications related to erosion, water resource, and stormwater management for the regulated project. (d) One copy of the approved Post-Construction Stormwater Management Plan shall be kept on file at the site of the regulated construction activity from the initiation of site preparation until a Certificate of Occupancy is issued for the development associated with the regulated construction activity. (e) The Operation and Maintenance Plan shall be developed by a professional engineer or landscape architect properly licensed to practice in the State of Michigan and shall include maintenance requirements and protocols for each stormwater control measure, including an associated schedule of inspection and maintenance activities, and procedures and checklists, for each stormwater control measure consistent with the provisions in the Stormwater Management Design Manual and a signed certification statement accepting responsibility for the operation, maintenance, and inspection of the stormwater control measures. (f) A Post-Construction Stormwater Management Plan shall include the preparation and property recording of all easements, deed restrictions, reservation of rights-of-way, or other protective covenants as are required to ensure sufficient access for purposes of maintenance, inspection, operation, and repair or replacement of stormwater control measures, and to ensure that any future modification of the site is consistent with the provisions of the approved Post-Construction Stormwater Management Plan unless amendments or modifications to the Post-Construction Stormwater Management Plan are approved by the Water and Sewerage Department. (g) The Post-Construction Stormwater Management Plan and applicable Operation and Maintenance Plan shall be referenced on a final plat, site plan or as-built drawing, shall be recorded with the Wayne County Register of Deeds upon final plat approval, and shall be provided to the Water and Sewerage Department within 14 days following receipt of the recorded document.

(Ord. No. 2020-43, § 1, eff. 12-16-2020)