§ 8-4-7 — Additions to Section 107 of 2015 Michigan Mechanical Code, Inspections and Testing
2019 Detroit City Code (Supp. No. 4: codified through Ordinance No. 2024-17, effective March 26, 2024, and Ordinance No. 2024-32, effective June 25, 2024) · Detroit City Code § 8-4-7
Corpus is an independent public-information project, not the official City of Detroit website. Stable reference: corpuslaw.us/code/1de8cbdc-519a-4444-9447-361c8434e4a8
Sec. 8-4-7. - Additions to Section 107 of 2015 Michigan Mechanical Code, Inspections and Testing.
In accordance with Section 8b(11) of the Stille-DeRossett-Hale Single State Construction Code Act, being MCL 125.1508b(11), the City adds to Section 107 of the 2015 Michigan Mechanical Code, Inspections and Testing, the following provisions, which were contained in the 1984 Detroit City Code prior to July 31, 2001, and concern administration and enforcement: 107.1 General. The code official is authorized to conduct such inspections as are deemed necessary to determine compliance with the provisions of this code. In addition, a person who inspects equipment under Chapter 10 of this code, Boilers, Water Heaters and Pressure Vessels, is required under the Michigan Boiler Rules to hold, as applicable, a Certificate of Competency from the Director of the Michigan Department of Licensing and Regulatory Affairs or a valid Commission as an inspector of boilers and pressure vessels that was issued by the National Board of Boiler and Pressure Vessel Inspectors, or both. Construction or work for which a permit is required shall be subject to inspection by the code official, and such construction or work shall remain assessable and exposed for inspection purposes until approved. Approval as a result of inspection shall not be construed to be an approval of a violation of the provisions of this code or of other ordinances of the jurisdiction. Inspections presuming to give authority to violate or cancel the provisions of this code or of other ordinances of the jurisdiction shall not be valid. 107.2 Required inspections and testing. The Code Official, upon notification from the permit holder or the permit holder's agent, shall make the following inspections and other such inspections as necessary, and shall either release that portion of the construction or shall notify the permit holder or the permit holder's agent of violations that must be corrected. The holder of the permit shall be responsible for the scheduling of such inspections. 1. Underground inspection shall be made after trenches or ditches are excavated and bedded, piping installed, and before backfill is put in place. When excavated soil contains rocks, broken concrete, frozen chunks and other rubble that would damage or brake the piping or cause corrosive action, clean backfill shall be on the job site. 2. Rough-in inspection shall be made after the roof, framing, fireblocking and bracing are in place and all ducting and other components to be concealed are complete, and prior to the installation of wall or ceiling membranes. 3. Final inspection shall be made upon the completion of the mechanical system, boiler, or pressure vessel. After completion of the final inspection for installation of a boiler or a pressure vessel requiring periodic inspections under this code, the inspector shall affix to the boiler or the pressure vessel a metal tag, which contains a City serial number for permanent identification of the boiler or pressure vessel. Each metal tag for a boiler shall contain a four-digit serial number with a five-pointed star immediately before and after the serial number, while each metal tag for a pressure vessel shall contain a five-digit serial number with a five-pointed star immediately before and after the serial number. Such metal tag shall identify that the equipment was inspected by the City of Detroit and shall be applied only by duly authorized inspectors from the Buildings, Safety Engineering, and Environmental Department. The location of the metal tag on the boiler or pressure vessel shall be recorded on the inspection report. The City's metal tag, as well as other stampings required for identification on equipment, shall not be concealed, altered, made illegible, or removed, except by, or under the direction, of an inspector from the Department. Exception. Ground-source heat pump loop systems tested in accordance with Section 1210.10 of this code shall be permitted to be backfilled prior to inspection. The requirements of this section shall not be considered to prohibit the operation of any heating equipment or appliances installed to replace existing heating equipment or appliances serving an occupied portion of a structure, provided, that a request for inspection of such heating equipment or appliance has been filed with the Department not more than 48 hours after such replacement work is completed, and before any portion of such equipment or appliances is concealed by any permanent portion of the structure. 107.2.1.1 Accident inspections. The user of any system or equipment governed by the code shall immediately notify the Buildings, Safety Engineering, and Environmental Department of any accident involving personal injury, or damage to equipment, on or about or in connection with such system or equipment and shall afford the Department every facility for investigating such accident or damage. Where an accident involves the failure, breakage, damage or destruction of any part of the system or equipment, it shall be unlawful to use such system equipment until after an examination by a representative of the Department and approval of such system or equipment is granted by the Department for continual use, provided, that, when such system or equipment is repaired and placed in safe operating condition by a person deemed qualified by the Department to do so, such as an applicable licensed contractor, the system may be used pending such inspection where notice is given by such person to the Department not later than the next business day following the repair. It shall be the duty of the Department to make a prompt examination into the cause of such accident and to file in the Department records a full and complete report thereof. 107.2.2.1 Pre-approval for Overtime Inspection. Pre-approval of overtime inspection shall be obtained for all services provided by the Buildings, Safety Engineering, and Environmental Department during periods other than regular working hours. 107.3.4 Special Hydrostatic Pressure Tests. All high-pressure boilers, that are 25 years or older and have longitudinal lap seams, or that are 30 years or older, shall be subject to a special hydrostatic pressure test as described in the National Board Inspection Code, followed by an internal inspection, in the presence of an inspector from the Buildings, Safety Engineering, and Environmental Department. Thereafter, where determined necessary by the Department, the special hydrostatic pressure test shall be conducted approximately every three years. 107.7 Reports of inspectors. The inspectors of the Buildings, Safety Engineering, and Environmental Department shall make a written report of each inspection and file same in the records of their Department. A copy of such report shall be mailed to the owner and, if applicable, to the contractor.
(Code 1964, §§ 3.3, 4.0, 4.3, 4.4, 4.5, 5.2, 5.3, 801.3, 801.9; Ord. No. 705-G, § 1(3.3, 4.0, 4.3, 4.4, 4.5, 5.2, 5.3), eff. 7-4-1972; Ord. No. 390-H, § 1(801.3, 801.9), eff. 10-19-1980)
Ask a question about Detroit law
Corpus searches the Detroit sections it holds and shows the ones that match, with their citations. Free, no sign-in.