For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 46-155 — Reporting requirements for permittee

Code of Ordinances of the City of East Lansing, Michigan (Codified through Ordinance No. 1552, enacted August 12, 2025. (Supp. No. 16, Update 4)) · East Lansing Municipal Code § 46-155

Corpus is an independent public-information project, not the official City of East Lansing website. Stable reference: corpuslaw.us/code/229a164f-bb8a-4179-b987-39ae87fca234

Sec. 46-155. - Reporting requirements for permittee.

(a) Generally. Within 90 days following the date for final compliance with applicable pretreatment standards or, in the case of a new source, following commencement of the introduction of wastewater into the POTW, any categorical user subject to pretreatment standards and requirements shall submit to the superintendent a report showing the measured average daily and maximum daily flow in gallons per day from regulated process streams and such other streams as necessary to allow use of the combined waste stream formula of 40 CFR 403.6(e) and identifying the pretreatment standards applicable to each regulated process. In addition, the report shall include the results of sampling and analysis, identifying the nature and concentration (or mass where required) of regulated pollutants in the discharge from each regulated process. Both daily maximum and average concentration (or mass) shall be reported. The sample shall be representative of daily operations and shall be taken in the frequency and manner provided by 40 CFR 403(12)(b)(5). The report shall state whether the applicable pretreatment standards or requirements are being met on a consistent basis, and if not, what additional O&M and/or pretreatment is necessary to bring the user into compliance with the applicable pretreatment standards or requirements. (b) Periodic compliance reports. (1) Any user subject to a pretreatment standard, after the compliance date of such pretreatment standard, or, in the case of a new user, after commencement of the discharge into the POTW, shall submit to the superintendent during the months of June and December, unless required more frequently by the city, a report indicating the nature and concentration of prohibited or regulated substances in the effluent which are limited by such pretreatment standard. In addition, this report shall include a record of all measured or estimated average and maximum daily flows for the reporting period. Flows shall be reported on the basis of actual measurement, provided however, where cost or feasibility considerations justify, the city may accept reports of average and maximum flows estimated by variable techniques. At the discretion of the superintendent in consideration of such factors as local high or low flow rates, holidays, budget cycles, etc., the superintendent, for good cause shown, may agree to alter the months during which the above reports are to be submitted. (2) If the superintendent has imposed mass limitations on users, the report required by subsection (b)(1) of this section shall indicate the mass of pollutants regulated by pretreatment standards in the effluent of the user. For industrial users subject to equivalent mass or concentration limits, the report required by subsection (b)(1) of this section shall contain a reasonable measure of the user's longterm production rate. For all other industrial users subject to categorical pretreatment standards expressed only in terms of allowable pollutant discharge per unit of production (or other measure of operation), the report shall include the user's actual average production rate for the reporting period. Reports of users shall contain the results of sampling and analysis of the discharge, including the flow and the nature and concentration, or production and mass where requested by the superintendent, of pollutants contained therein which are limited by the applicable pretreatment standard. The report shall be based upon data obtained through appropriate sampling and analysis performed during the period covered by the report, which data are representative of conditions occurring during the reporting period. The frequency of monitoring shall be prescribed by the superintendent to assess and assure compliance by industrial users with applicable pretreatment standards and requirements. All analysis shall be performed in accordance with procedures established by the administrator pursuant to section 304(h) of the Act and contained in 40 CFR 136 and amendments thereto or with any other test procedures approved by the administrator. Sampling shall be performed in accordance with the techniques approved by the administrator. (Where 40 CFR 136 does not include a sampling or analytical technique for the pollutant in question, sampling and analysis shall be performed in accordance with the procedures set forth in the EPA publication, Sampling and Analysis Procedures for Screening of Industrial Effluent for Priority Pollutants, April 1977, and amendments thereto, or with any other sampling and analytical procedures approved by the administrator.) (3) If sampling performed by an industrial user indicates a violation, the user shall notify the superintendent within 24 hours of becoming aware of the violation. The user shall also repeat the sampling and analysis and submit the results of the repeat analysis to the superintendent within 30 days after becoming aware of the violation. (c) Reporting requirements for noncategorical discharges. Industrial users with discharges which are not subject to categorical pretreatment standards shall submit such reports as the superintendent deems necessary to verify compliance with all of the general discharge limitations and prohibitions of this Code. (d) Baseline monitoring report. At least 90 days prior to the commencement of discharge, new sources, and sources that become industrial users subsequent to the promulgation of an applicable categorical standard, shall be required to submit to the superintendent a report which contains estimates of the measured average daily and maximum daily flow of process streams and waste streams and flow and amount of regulated pollutants in the form and containing the information required by 40 CFR 403.12(b)(1)—(5), and shall include in this report information on the method of pretreatment intended to be used to meet the applicable pretreatment standards. (e) Signatory requirements. All reports required by this section shall contain the certification statement as set forth in 40 CFR 403.6(a)(2)(ii) and shall be signed as follows: (1) By a responsible corporate officer, if the industrial user submitting the reports required by subsections (b), (c), and (d) of this section is a corporation. For the purpose of this subsection, a responsible corporate officer means: a. A president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision-making functions for the corporation; or b. The manager of one or more manufacturing, production, or operation facilities employing more than 250 persons or having gross annual sales or expenditures exceeding $25,000,000.00 (in second quarter 1980 dollars), if authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. (2) By a general partner or proprietor if the industrial user submitting the reports required by subsections (b), (c), and (d) of this section is a partnership or sole proprietorship, respectively. (3) By a duly authorized representative of the individual designated in subsection (e)(1) or (2) of this section if: a. The authorization is made in writing by the individual described in subsection (e)(1) or (2). b. The authorization specifies either an individual or a position having responsibility for the overall operation of the facility from which the industrial discharge originates, such as the position of plant manager, operator of a well, or wellfield superintendent, or a position of equivalent responsibility for environmental matters for the company; and c. The written authorization is submitted to the city. (4) If an authorization under subsection (e)(3) of this section is no longer accurate because a different individual or position has responsibility for the overall operation of the facility, or overall responsibility for environmental matters for the company, a new authorization satisfying the requirements of subsections (e)(1) through (3) of this section must be submitted to the city prior to or together with any reports to be signed by an authorized representative.

(Code 1994, ch. 24A, § 4.3)

Ask a question about East Lansing law

Corpus searches the East Lansing sections it holds and shows the ones that match, with their citations. Free, no sign-in.