For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 46-159 — Bypass of pretreatment facilities

Code of Ordinances of the City of East Lansing, Michigan (Codified through Ordinance No. 1552, enacted August 12, 2025. (Supp. No. 16, Update 4)) · East Lansing Municipal Code § 46-159

Corpus is an independent public-information project, not the official City of East Lansing website. Stable reference: corpuslaw.us/code/a81f6cf1-ea8c-4a2c-b951-b98f4c5ebee3

Sec. 46-159. - Bypass of pretreatment facilities.

(a) Definitions. The following words, terms and phrases, when used in this section, shall have the meanings ascribed to them in this subsection, except where the context clearly indicates a different meaning: Bypass means the intentional diversion of waste streams from any portion of an industrial user's treatment facility. Severe property damage means substantial physical damage to property, damage to the treatment facilities which causes them to become inoperable, or substantial and permanent loss of natural resources which can reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production. (b) Bypass not violating applicable pretreatment standards or requirements. An industrial user may allow any bypass to occur which does not cause pretreatment standards or requirements to be violated, but only if it also is for essential maintenance to assure efficient operation. These bypasses are not subject to the provision of subsections (c) and (d) of this section. (c) Notice. (1) If an industrial user knows in advance of the need for a bypass, it shall submit prior notice to the city, if possible at least ten days before the date of the bypass. (2) An industrial user shall submit oral notice of an unanticipated bypass that exceeds applicable pretreatment standards to the city within 24 hours from the time the industrial user becomes aware of the bypass. A written submission shall also be provided within five days of the time the industrial user becomes aware of the bypass. The written submission shall contain a description of the bypass and its cause; the duration of the bypass, including exact dates and times, and, if the bypass has not been corrected, the anticipated time it is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the bypass. The supervisor may waive the written report on a case-by-case basis if the oral report has been received within 24 hours. (d) Prohibition of bypass. (1) Bypass is prohibited, and the city may take enforcement action against an industrial user for a bypass, unless: a. Bypass was unavoidable to prevent loss of life, personal injury, or severe property damage. b. There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facility, retention of untreated wastes, or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate backup equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventative maintenance. c. The industrial user submitted notices as required under subsection (c) of this section. (2) The superintendent may approve an anticipated bypass, after considering its adverse effects, if the superintendent determines that it will meet the three conditions listed in subsection (d)(1) of this section.

(Code 1994, ch. 24A, § 4.7)

Ask a question about East Lansing law

Corpus searches the East Lansing sections it holds and shows the ones that match, with their citations. Free, no sign-in.