§ 50-35 — Building permits

Code of Ordinances of the City of East Lansing, Michigan (Codified through Ordinance No. 1552, enacted August 12, 2025. (Supp. No. 16, Update 4)) · East Lansing Municipal Code § 50-35

Corpus is an independent public-information project, not the official City of East Lansing website. Stable reference: corpuslaw.us/code/49456a53-c456-42ba-91a9-63ac471e1346

Sec. 50-35. - Building permits.

(a) Before proceeding with the erection, alteration, repair, moving, or removing of any building, or part thereof, an owner or his/her or its authorized agent shall obtain a permit from the building official. The applicant for a permit must file with his/her or its request a set of plans and written specifications sufficient to indicate clearly and fully the nature of the contemplated work and the kind and quality of materials to be used therein, together with an estimate of the cost. Drawings shall be made to scale not less than one-eighth inch equal to one foot, and shall indicate clearly the size of structural members, walls, and openings, the position of the building on the site with reference to property and street lines and adjacent buildings, and such other information as may be necessary to provide for the enforcement of these regulations. It shall be the duty of all lot owners to have located accurately all corners and boundaries of their properties prior to building thereon. (1) Permits for or including solar energy systems must also include the property's energy usage over the last 12 months, the projected energy output of the installed energy system over a 12-month period, and all other information necessary for the building official to ensure that building, electrical, and safety codes are met. (b) A record of such applications and plans shall be kept in the office of the building official for such period of time as the city manager deems necessary. (c) For applications for permits for activities which require review and approval by the planning and zoning official, the zoning board of appeals, the planning commission or the city council under the provisions of this chapter, the building official shall forward the application to the planning and zoning official for review and processing. When such review has been completed, the planning and zoning official shall advise the building official of the actions taken before any building permit may be issued. (d) When the plans submitted have been found to conform with the requirements of this chapter, the building official shall issue a permit and affix to the plans an official stamp of approval. (e) When alterations begin or when the footings of a building have been constructed and before the completion of the foundation walls and also at the time of the completion of the frame and skeleton construction, the owner, contractor, or his/her or its agent shall notify the building official in writing in order that the inspection may be made at each of those times. (f) The building official shall make a final inspection of all buildings after completion, before occupancy begins, upon receiving notice from the owner, contractor, or his/her or its agent, that said building is ready for such final inspection. If such buildings or alterations comply with the statements in the application, plans, working drawings, and specifications, a certificate of occupancy shall be issued as hereinafter provided. (g) Whenever it is found that a permit has been issued in violation of this chapter or any other chapter of the City Code or state law, or in consequence of a false statement or misrepresentation of conditions, or whenever it is found that work is not being performed in accordance with the plans and specifications on which the permit issued is based, the building official shall notify the person to whom the permit was issued to appear before him/her at a stated time and place and show cause why the permit shall not be revoked. If after such a hearing it shall appear that the permit was improperly obtained or that the work is being improperly done, or if the holder of the permit, or his/her or its authorized agent fails to appear at the stated time of the hearing, the building official shall issue a written order revoking the permit. The posting of a copy of such order upon the premises shall constitute service thereof upon the owner, or the contractor, or his/her or its agent in charge of the work. No other permit shall thereafter be issued to any person held to be violating any provision of this chapter or any other chapter of the City Code or state law until all conditions prompting the revocation of the initial permit have been satisfactorily corrected. Failure of the building official to serve notice of any violation at the time of occurrence shall not relieve the holder of the permit from responsibility for such violation. (h) Permits for structures on which work has not started within six months following the date of issue, or on which all permitted work has not been completed within 24 months following the date of issue and permits for structures upon which work has been abandoned for a period of six months, shall lapse and cease to be in effect. The building official shall notify the person to whom the permit is issued of the expiration date of the permit. The building official may for good cause authorize a single extension of the time period to complete for not more than 12 additional months. If the building official does not authorize a request to extend the time period of the permit prior to the expiration date, the person to whom the permit was issued may appeal to the zoning board of appeals and show cause why the permit should not lapse. Following a public hearing the zoning board of appeals may grant an extension of the permit for a period not to exceed 12 additional months for good cause, and upon finding that the extension would not unduly affect neighboring properties or the public health, safety, or welfare. An appeal to the zoning board of appeals prior to the expiration date shall stay the expiration of the permit until final action by the board. Where a building permit has lapsed and a structure does not meet the minimum structural requirements of chapter 6 or where a premises does not meet the grading and soil erosion requirements of chapter 34 of this Code, the structure or premises shall be deemed a public nuisance and an unsafe or dangerous building within the meaning of chapter 6 and the building official may proceed to abate the condition in the manner provided by chapter 6. For permits issued prior to the effective date of the ordinance from which this chapter is derived, the time limits specified above shall apply commencing on the effective date of such ordinance.

(Code 1994, ch. 55, § 5.147; Ord. No. 1530, 5-21-2024)