§ 29.5-80 — Eligible facilities requests

Code of Ordinances of the City of Farmington Hills, Michigan (Codified through Ordinance No. C-9-2025, adopted October 27, 2025. (Supp. No. 36)) · Farmington Hills Code of Ordinances § 29.5-80

Corpus is an independent public-information project, not the official City of Farmington Hills website. Stable reference: corpuslaw.us/code/6552adb5-3076-4809-b0f7-1333ecfaaa31

Sec. 29.5-80. - Eligible facilities requests.

(a) This section applies to eligible facilities requests as defined in section 29.5-72. (b) For purposes of this section: (1) Wireless tower means a structure in a public right-of-way, the sole or primary purpose of which is to support antennas and associated wireless equipment for the provision of wireless services. (2) Wireless base station means equipment or a structure (other than a wireless tower), that at the time of the application supports or houses wireless facilities at a fixed location that enables wireless service between user equipment and a communications network. (c) An eligible facilities request application shall include the documents, plans, specifications, and statements necessary to establish that: (1) The wireless tower or base station is existing. (2) The wireless tower or base station to be modified is in compliance with all applicable city, state, and other local zoning, siting, and regulatory reviews, permits, and approvals. (3) Modification is limited to collocation, removal or replacement of wireless equipment. (4) There will be no "substantial change" to the wireless tower or base station. (d) For purposes of this section substantial change means any of the following: (1) Increasing the height over the height approved as of February 22, 2012, by more than ten (10) percent or more than ten (10) feet, whichever is greater. (2) Adding wireless facilities that would protrude from the edge of the structure by more than six (6) feet. (3) The installation of new ground equipment cabinets if there are no pre-existing ground cabinets. (4) If there are existing ground equipment cabinets, the installation of ground cabinets that are ten (10) percent larger in height or overall volume than the existing cabinets. (5) Excavation or deployment outside the perimeter of the area occupied by the wireless tower or base station and existing wireless facilities. (6) A modification that does not comply with prior approval conditions for the wireless support structure or base station unless the noncompliance is limited to a modification that would not be a substantial change under the above standards in subsections (1) through (5). (7) A modification that would defeat or be incompatible or inconsistent with existing elements of a wireless tower or base station designed to conceal or minimize its appearance as a wireless tower or base station. (e) Subject to the possible time adjustments under 47 CFR 1.6100 that is included in the shot clock appendix to this article, the city shall approve or deny an application for a permit under this section within sixty (60) days of all applications for the requested facilities being submitted and complete.

(Ord. No. C-4-2019, § 1, 3-25-19)

Ask a question about Farmington Hills law