§ 33-60.5 — General regulations of Oakland County Department of Public Works, County of Oakland sewage disposal systems
Code of Ordinances of the City of Farmington Hills, Michigan (Codified through Ordinance No. C-9-2025, adopted October 27, 2025. (Supp. No. 36)) · Farmington Hills Code of Ordinances § 33-60.5
Corpus is an independent public-information project, not the official City of Farmington Hills website. Stable reference: corpuslaw.us/code/2c38f85d-6062-461b-8b79-58676540fe4c
Sec. 33-60.5. - General regulations of Oakland County Department of Public Works, County of Oakland sewage disposal systems.
(A) Section Requirements Mandatory for Connection: All sanitary sewer systems connected directly or indirectly into the intercepting sewer or sewers of the Oakland County Department of Public Works shall meet the requirements set forth in this section. (B) Plans, Permits and Bonds: (1) Prior to connection and prior to start of construction, all sanitary sewer systems shall have engineering plans and specifications prepared by a professional engineer and shall be approved by the Oakland County Department of Public Works. (2) A connection permit shall be obtained by the owner or contractor from the Oakland County Department of Public Works. Said connection permit shall show the location of the work; the extent of the work; information regarding the contractor, the owner and the engineer; and any other pertinent information as shall be determined necessary by the department of public works. A fee shall be charged for said permit to cover the cost of inspection of each connection and to verify the result of the acceptance test. The permit fee shall be one hundred fifty dollars ($150.00) for each connection plus fifteen dollars ($15.00) for each new manhole constructed. Inspection requested during other than normal working hours shall be performed only if deemed necessary by the Oakland County Department of Public Works. The fee for such inspection shall be two hundred fifty dollars ($250.00) per day minimum, in addition to the normal connection permit fee. (3) Individual building sewers which are directly connected into the county sanitary sewer system shall conform to all applicable requirements of this division. A connection permit, for which a charge of fifty dollars ($50.00) will be made by the Oakland County Department of Public Works, shall be obtained from the department of public works before such connection is made. Prior to the issuance of such connection permit, the person obtaining such permit shall have obtained the written approval of the local unit of government. Connection shall be made in a workmanlike manner and in accordance with methods and procedures established by the department of public works. The party to whom such a permit is issued shall be responsible for notifying the department of public works twenty-four (24) hours in advance of the date and time when such a connection is made so that proper inspection of same can be made by the department. (4) Prior to the adjustment, reconstruction, relocation or any other altering of the sewers of the County of Oakland, including manhole structures, the contractor or the person responsible for the work shall first obtain a permit to do such work from the Oakland County Department of Public Works. Said permit fee shall be determined by the department of public works. (5) Prior to construction and during the life of permits obtained in accordance with subsections (B)(2), (3) and (4) of this section, all owners or contractors shall yearly furnish to the Oakland County Department of Public Works a satisfactory surety bond in the amount of five thousand dollars ($5,000.00) as security for the faithful performance of the work in accordance with the plans and specifications and departmental standards, and yearly furnish to the Oakland County Department of Public Works a cash deposit in the amount of five hundred dollars ($500.00). Such deposit shall provide funds for emergency work and/or such other work, as may be deemed necessary by the Oakland County Department of Public Works, arising as a result of construction by the owner or contractor. Such bonds shall not be cancelled by the owner, the contractor or the surety without first having given ten (10) days' written notice to the Oakland County Department of Public Works. Cash deposits may be returned to the owner or contractor within ten (10) days of receipt of written request therefor, except that no deposits will be returned until such time as all outstanding permits have received final inspection and approval. In the event that it becomes necessary for the Oakland County Department of Public Works to expend funds for work arising as a result of construction by the owner or the contractor, then the cost of such work shall be deducted from the aforementioned cash deposit. The owner or contractor shall have the right and opportunity to correct any deficiencies promptly before any deposit funds will be spent by the Oakland County Department of Public Works. The owner or contractor shall, within thirty (30) days of the mailing of written notice thereof, pay to the Oakland County Department of Public Works the entire amount of such cost. Failure to comply with these rules and regulations and the standards of the Oakland County Department of Public Works may result in the immediate termination of the surety and cash bonds. (C) Bulkhead: The contractor shall install a suitable bulkhead to prevent construction water, sand, silt, etc., from entering the existing sewer system. Such bulkhead shall be left in place until such time as removal is authorized by the Oakland County Department of Public Works. (D) Acceptance Test: All sanitary sewer systems shall be subjected to infiltration, air or exfiltration tests or a combination thereof in accordance with the following requirements prior to acceptance of the system by the Oakland County Department of Public Works and prior to removal of the bulkhead as required in paragraph (C) above. All final acceptance tests shall be witnessed by the Oakland County Department of Public Works. (1) Infiltration test: (a) All sewers over 24-inch diameter shall be subjected to infiltration tests. All sewers of 24-inch diameter or smaller, where the groundwater level above the top of the sewer is over seven (7) feet, shall be subjected to an infiltration test. (b) Maximum allowable infiltration shall not exceed two hundred fifty (250) gallons per inch of diameter per mile of pipe per twenty-four (24) hours for the overall project. Maximum allowable infiltration shall not exceed five hundred (500) gallons per inch of diameter per mile of pipe per twenty-four (24) hours for any individual run between manholes. (2) Air test or exfiltration test: (a) All sewers of 24-inch diameter or less, where the groundwater level above the top of the sewer is seven (7) feet or less, shall be subjected to air tests or exfiltration tests. (b) For exfiltration tests, the internal water level shall be equal to the external water level plus seven (7) feet as measured from the top of pipe. The allowable exfiltration rate shall be the same as that permitted from infiltration. (c) The procedure for air testing of sewers shall be as follows: The sewer line shall be tested in increments between manholes. The line shall be cleaned and plugged at each manhole. Such plugs shall be designed to hold against the test pressure and shall provide an airtight seal. One of the plugs shall have an orifice through which air can be introduced into the sewer. An air supply line shall be connected to the orifice. The air supply line shall be fitted with suitable control valves and a pressure gauge for continually measuring the air pressure in the sewer. The pressure gauge shall have a minimum diameter of three and one-half (3½) inches and a range of zero (0) to ten (10) pounds per square inch gauge (PSIG). The gauge shall have minimum divisions of 0.10 PSIG and an accuracy of 0.04 PSIG. (d) The sewer shall be pressurized to four (4) PSIG greater than the greatest back pressure caused by groundwater over the top of the sewer pipe. At least two (2) minutes shall be allowed for the air pressure to stabilize between three and one-half (3½) and four (4) PSIG. If necessary, air shall be added to the sewer to maintain a pressure of three and one-half (3½) PSIG or greater. (e) After the stabilization period, the air supply control valve shall be closed so that no more air will enter the sewer. The sewer air pressure shall be noted and timing for the test begun. The test shall not begin if the air pressure is less than three and one-half (3½) PSIG, or such other pressure as is necessary to compensate for ground water level. (f) The time required for the air pressure to decrease one (1) PSIG during the test shall not be less than the time shown in the "Oakland County Department of Public Works Air Test Tables." (g) Manholes on sewers to be subjected to air tests shall be equipped with one-half-inch diameter galvanized capped pipe nipple extending through the manhole three (3) inches into the manhole wall and at an elevation equal to the top of the sewer pipe. Prior to the air test, the groundwater elevation shall be determined by blowing air through the pipe nipple to clear it and then connecting a clear plastic tube to the pipe nipple. The tube shall be suspended vertically in the manhole and the groundwater elevation determined by observing the water level in the tube. The air test pressure shall be adjusted to compensate for the maximum groundwater level above the top of the sewer pipe to be tested. After all tests are performed and the sewer is ready for final acceptance, the pipe nipple shall be plugged in an acceptable manner. (h) If a sewer fails to pass any of the previously described tests, the contractor shall determine the location of the leaks, repair them and retest the sewer. The tests shall be repeated until satisfactory results are obtained. (i) All visible leaks and cracks shall be repaired regardless of tests results. (E) Stormwater and Groundwater Control: (1) Yard drains, patio drains, catchbasins, downspouts, weep tile, perimeter and footing drains or any other structure used for the collection and conveyance of stormwater and/or groundwater shall not be permitted to discharge into any sanitary sewer connected directly or indirectly to the county system, except as provided under subsection (e)(2) below. (2) Perimeter and footing drains from buildings existing before December 16, 1968, shall not be required to disconnect from the sanitary sewer system; provided, that federal, state or local law or regulation does not require, or may not require subsequent to the adoption of these standards and regulations, the disconnection of such perimeter and footing drains. (3) The crock to iron joint shall be sealed by approved flexible adaptor fittings such as those manufactured by Fernco Joint Sealer Company, or as approved by the Oakland County Department of Public Works. The iron pipe inside the building shall be plugged and leaded and remain plugged and watertight until such time as the plumbing is carried on to the first floor, the basement backfilled and the roof is on the building, thereby providing that no water from the excavated basement will enter the sanitary sewer. (F) Building Sewers: House connection sewer from the lateral sewer in the street or easement to within five (5) feet from the house shall be: (1) Six-inch diameter extra strength vitrified sewer pipe, manufactured in accordance with current NCPI Designation ER 4-67 Standards, or equal, with DPW-approved premium joint; (2) Six-inch diameter Class 2400 Asbestos Cement Pipe with Ring-Tite, Fluid-Tite or DPW-approved joint; (3) Six-inch diameter, service strength, cast-iron soil pipe with hot poured lead joint, or DPW-approved equal; (4) Six-inch diameter extra strength solid wall pipe extruded from Acrylonitrile-Butadiene-Styren (ABS) plastic meeting the minimum cell classification 2-2-3 as defined in ASTM Specification D1788-68. (5) Other pipe and joints as may be approved by the Oakland County Department of Public Works. Copies of the Oakland County Department of Public Works-approved joint shall be on file at the offices of each community in the systems. House connection sewers shall be six-inch minimum diameter, except that four-inch pipe of comparable strength and joint material may be used if permitted by the local unit of government. All joints shall be tight and when tested for infiltration or exfiltration shall not exceed the requirements of paragraph (D) of this section. (G) Septic Tank Abandonment and Waste Disposal: (1) Prior to connecting an individual building sewer to the sewers of the County of Oakland, either directly or indirectly, all existing wastewater treatment facilities, including septic tanks, tile fields and sump pumps, shall be physically and permanently disconnected from the building sewer. (2) Septic tank sludge shall be discharged into the sewers of the county, directly or indirectly, only at locations specified by the Oakland County Department of Public Works and only after obtaining proper septic tank dumping tickets. (3) The liquid and solids from an abandoned septic tank shall not be drained, dewatered, pumped or in any other manner discharged to the sewers of the county, except as provided for above. (H) Ownership, Operations and Maintenance Responsibility: All new sanitary sewer systems, except individual building sewers, connected directly or indirectly into the intercepting sewer or sewers of the County of Oakland shall be owned, operated and maintained by the governing community. This includes, but is not necessarily limited to, on-site sewer systems serving condominiums, apartment projects, shopping centers and mobile home parks. (I) Manholes: (1) All manholes constructed on sanitary sewer systems shall be provided with lid frames bolted to the cone section of the manhole with rubber O-ring gaskets compressed between the frame and the top of the cone in accordance with the current "Standard Manhole Detail" of the Oakland County Department of Public Works. Adjustments to manhole tops shall be accomplished by using precast concrete adjustment rings bolted to the cone section of the manhole with rubber O-ring gaskets compressed between each adjacent ring. Mortar and brickwork adjustment at the top of manholes will not be allowed. All manhole riser and cone sections shall have modified groove tongue joint with rubber gasket. The bolted frame, bolts, adjustment rings and O-ring gaskets shall be in accordance with the standards of the Oakland County Department of Public Works. (2) All manholes shall be provided with bolted waterproof covers in accordance with the current "Standard Manhole Detail" of the Oakland County Department of Public Works. Although not recommended, and only under certain circumstances, consideration will be given to the burying of manholes in lieu of providing bolted covers and only upon written request to the Oakland County Department of Public Works. (J) As-Built Plans: Prior to the acceptance of any sewer system and prior to the removal of the bulkhead as required in paragraph (C) (except under extenuating circumstances as may be approved by the director) as-built plans shall be provided to the Oakland County Department of Public Works. Said as-built plans shall show a statement by a registered engineer or surveyor certifying this to be "as-built plans" and shall include, but not be limited to, length of sewer, invert elevation, locations with respect to property lines, wye and riser locations and depths, and sewer material and joints used. (K) All combined sewer systems connected directly or indirectly to the intercepting sewer or sewers of the County of Oakland shall meet the following requirements: (1) Paragraphs (B), (C), (F), (G), (H), (I) and (J) of this section are required for sanitary sewer system connecting to interceptor sewers of the County of Oakland as hereinbefore mentioned. (2) Prior to acceptance of the system and prior to removal of the bulkhead as required under paragraph (C) of this section, all combined sewer systems shall be subjected to an infiltration test in accordance with the infiltration requirements of the Oakland County Department of Public Works as outlined in paragraph (D) of this section. Said test shall be witnessed by the Oakland County Department of Public Works. (3) Downspouts and footing drain tile may be connected to a combined sewer if permitted by the local unit of government. (4) No requirements of the Oakland County Department of Public Works, or permits issued hereunder by said department, shall relieve the property owner of complying with all the rules and regulations of the local unit of government wherein such property is located when such rules and regulations are not in conflict with the requirements of the department of public works. (5) All sewer construction shall comply with the general specifications of the Oakland County Department of Public Works. Copies of said specifications may be obtained from the office of the department of public works. (6) Construction of new combined sewer systems shall be prohibited except when no prudent or feasible alternative exists.
(Ord. No. C-19-89, § 5, 11-20-89)
Ask a question about Farmington Hills law
Corpus searches the Farmington Hills sections it holds and shows the ones that match, with their citations. Free, no sign-in.
