For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 70-512 — Monitoring facilities

Code of Ordinances of the City of Kentwood, Michigan (Codified through Ordinance No. 6-26, adopted June 2, 2026. (Supp. No. 18)) · Kentwood Code of Ordinances § 70-512

Corpus is an independent public-information project, not the official City of Kentwood website. Stable reference: corpuslaw.us/code/a952fbd5-f9c5-47f7-9d3a-89a2ab07a992

Sec. 70-512. - Monitoring facilities.

(a) The city may require an industrial user to provide, maintain and operate monitoring facilities at the industrial user's expense. Such facilities shall include a source of power, a sampling manhole, an approved sampler and flow monitoring devices as required by the director to allow for inspection, sampling and flow measurement of the building sewer and internal drainage systems. Such facilities shall be kept free of snow, parked vehicles or other obstructions. The monitoring facilities shall be situated on the user's premises in an area accessible to a vehicle, but the city may, when such a location would be impractical or cause undue hardship on the user, allow the facility to be constructed on a public street or sidewalk area and located so that it will not be obstructed by landscaping or parked vehicles. There shall be ample room in or near such sampling manhole or facility to allow accurate sampling and preparation of samples for analysis. The facility, sampling and measuring equipment shall be maintained at all times in a safe and proper operating condition at the expense of the user. Whether constructed on public or private property, the sampling and monitoring facilities shall be provided in accordance with plans and specifications submitted to, and approved by, the city and all applicable local construction standards and specifications. Construction shall be completed within 90 days following written notification by the city of the requirement of such facilities unless such completion date is extended by the director, at his discretion. (b) Flow measurement devices on building sewers shall be checked and necessary repairs made on an annual basis. Such maintenance and checks shall be performed by the equipment manufacturer or an authorized designee, who shall certify in writing to the city as to the accuracy of the equipment.

(Code 2004, § 70-512; Comp. Ords. 1987, § 25.711)

Ask a question about Kentwood law

Corpus searches the Kentwood sections it holds and shows the ones that match, with their citations. Free, no sign-in.