§ 70-528 — Bypasses
Code of Ordinances of the City of Kentwood, Michigan (Codified through Ordinance No. 6-26, adopted June 2, 2026. (Supp. No. 18)) · Kentwood Code of Ordinances § 70-528
Corpus is an independent public-information project, not the official City of Kentwood website. Stable reference: corpuslaw.us/code/c59fcb4a-c3fe-4f07-8794-5b395e00b0ba
Sec. 70-528. - Bypasses.
(a) For the purpose of this section, the term "bypass" means the intentional diversion of wastestreams from any portion of the industrial user's treatment facility. An industrial user may allow any bypass to occur which does not cause pretreatment standards or requirements to be violated, but only if it also is for essential maintenance to ensure efficient operation. Such bypasses are not subject to subsections (b) and (c) of this section. (b) If an industrial user knows in advance of the need for a bypass, it shall submit prior notice to the city, if possible, at least ten days before the date of the bypass. An industrial user shall submit oral notice of an unanticipated bypass that exceeds applicable pretreatment standards to the city within 24 hours from the time the industrial user becomes aware of the bypass. A written submission shall also be provided within five days of the time the industrial user becomes aware of the bypass. The written submission shall contain a description of the bypass and its cause, including the exact dates and times, and, if the bypass has not been corrected, the anticipated time it is expected to continue, and the steps taken or planned to reduce, eliminate and prevent reoccurrence of the bypass. The city may waive the written report on a case-by-case basis if the oral report has been received within 24 hours. (c) Bypass is prohibited, and the city may take enforcement action against an industrial user for a bypass, unless: (1) The bypass was unavoidable to prevent loss of life, personal injury or severe property damage. For the purposes of this subsection, the term "severe property damage" means substantial physical damage to property, damage to the treatment facilities which causes them to become inoperable or substantial and permanent loss of natural resources which can reasonably be expected to occur in the absence of a bypass. Such term does not mean economic loss caused by delays in production; (2) There was no feasible alternative to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate backup equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during periods of equipment downtime or preventative maintenance; (3) The industrial user submitted notices as required under subsection (b) of this section. (d) The director may approve an anticipated bypass, after considering its adverse effects, if the director determines that it will meet the three conditions listed in subsection (c) of this section.
(Code 2004, § 70-528; Comp. Ords. 1987, § 25.733)
Ask a question about Kentwood law
Corpus searches the Kentwood sections it holds and shows the ones that match, with their citations. Free, no sign-in.