For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 1046.11 — User information

Code of Ordinances of the City of Lansing, Michigan (Codified through Ordinance No. 1343, adopted October 27, 2025 (Supp. No. 64)) · Lansing Codified Ordinances § 1046.11

Corpus is an independent public-information project, not the official City of Lansing website. Stable reference: corpuslaw.us/code/024247f3-fb36-492f-921b-4558e9b2eb99

1046.11. - User information.

All industrial users proposing to connect to or to contribute to the POTW shall submit information on the user, processes and wastewater to the City at least 90 days before connecting to or contributing to the POTW. All existing industrial users connected to or contributing to the POTW shall submit such information within 90 days after the effective date of this chapter (Ordinance 698, passed April 8, 1985). The information submitted must be sufficient for the City to determine the impact of the user's discharge on the POTW and the need for pretreatment. The user shall submit, in units and terms appropriate for evaluation, the following information: (a) The user's name, address and location, if different from the address; (b) The user's SIC number, according to the Standard Industrial Classification Manual, Bureau of the Budget, 1972, as amended; (c) Constituents and characteristics of the user's wastewater, including, but not limited to, those mentioned in this chapter as determined by a reliable analytical laboratory. Sampling and analysis shall be performed in accordance with the procedures and methods detailed in the following publications: (1) Standard Methods for the Examination of Water and Wastewater, American Public Health Association; (2) Manual of Methods for Chemical Analysis of Water and Wastes, United States Environmental Protection Agency; and (3) Annual Book of Standards, Part 131, Water Atmospheric Analysis, 1975, American Society of Testing Materials. (d) Time and duration of contribution; (e) Average daily wastewater flow rates, including daily, monthly and seasonal variations, if any; (f) When requested by the City, site plans, floor plans, mechanical and plumbing plans and details to show all sewers, sewer connections and appurtenances by size, location and elevation; (g) Description of activities, facilities and plant processes on the premises, including all materials which are or could be discharged; (h) Where known, the nature and concentration of any pollutant in the discharge which is limited by City, State or Federal pretreatment standards, and a statement regarding whether or not such pretreatment standards are being met on a consistent basis. If not, the user shall provide information as to whether additional operation and maintenance and/or additional pretreatment is required by the industrial user to meet applicable pretreatment standards. New sources shall include information on any pretreatment methods they intend to use and provide estimates on discharge flow and pollutant concentrations. (i) If additional pretreatment and/or O & M is required to meet the pretreatment standards, the shortest schedule by which the user will provide such additional pretreatment. The completion date in such schedule shall be not later than the compliance date established for the applicable pretreatment standard. The following conditions shall apply to the schedule: (1) The schedule shall contain increments of progress in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards. (2) No increment referred to in paragraph (a)(1) hereof shall exceed nine months. (3) Not later than fourteen days following each date in the schedule and the final date for compliance, the user shall submit a progress report to the Director of Public Service including, as a minimum, whether or not it complied with the increment of progress to be met on such date and, if not, the date on which it expects to comply with such increment of progress, the reason for delay, and the steps being taken by the user to return construction to the schedule established. In no event shall more than nine months elapse between each such progress report. (j) Each product produced, by type, amount, process or processes and rate of production; (k) The type and amount of raw materials processed (average and maximum per day); (l) The number and type of employees, hours of operation of the plant and proposed or actual hours of operation of the pretreatment system; and (m) Any other information as may be deemed by the City to be necessary to evaluate the impact of the discharge on the POTW. Within three months of the promulgation or revision of a national categorical pretreatment standard or alternative discharge limit, all affected users must submit to the City the information required by subsections (h) and (i) hereof. All information required to be submitted by this section shall be signed by an authorized representative of the industrial user with the following certification statement: I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. If the authorized representative changes because a different individual or position has responsibility for the overall operation of the facility or for environmental matters of the company, a new authorization, satisfying the requirements of the definition contained in Section 1046.02, must be submitted to the City prior to or together with any reports to be signed by the authorized representative.

(Ord. No. 698, 4-8-85; Ord. No. 822, 9-17-90; Ord. No. 1175, § 1, 10-10-11)

Ask a question about Lansing law

Corpus searches the Lansing sections it holds and shows the ones that match, with their citations. Free, no sign-in.