For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 1219.03 — Applicability

Code of Ordinances of the City of Lansing, Michigan (Codified through Ordinance No. 1343, adopted October 27, 2025 (Supp. No. 64)) · Lansing Codified Ordinances § 1219.03

Corpus is an independent public-information project, not the official City of Lansing website. Stable reference: corpuslaw.us/code/547251fb-a8d3-4f4e-b91e-491ea51e16c7

1219.03. - Applicability.

(a) This chapter shall be applicable to all land development (new development and redevelopment), including but not limited to, site plan, plot plan and plat applications as well as any grading applications. In addition, this chapter shall be applicable to public improvement projects that disturb one acre or more. The City Engineer may waive the channel protection requirements, water quality requirements and/or flood control requirements of Section 1219.08(d) of this chapter for: (1) Projects that are within areas of the City's sewer collection system that are served by combined sewers; or (2) Projects that disturb less than one acre and are not part of a larger common plan of development or sale that would disturb one acre or more. (b) The procedures and standards set forth in this post-construction stormwater management chapter, and the policies, procedures, and design data specified in the City of Lansing Stormwater Management Policies and Procedures Manual (policies manual) and the City of Lansing Stormwater Management Design Manual (design manual) provide the minimum standards to be adhered to by developers and in no way limits the authority of the City to adopt or publish and/or enforce higher standards as a condition of approval of developments. (c) No site plan, plot plan, or plat shall be approved under Part 12 of this Code until approval by the City Engineer that said development or redevelopment meets all: (1) Soil erosion and sedimentation control measures consistent with the requirements of Chapter 1218 of this Code; (2) Requirements for an approved post-construction stormwater management plan (stormwater plan) as outlined in Section 1219.07; and (3) Related land development regulations. (d) In order to ensure completion of construction of the permanent stormwater BMPs specified in the applicant's stormwater plan as outlined in Sections 1219.07 and 1219.08, a completion bond must be provided to the City in conjunction with the site plan or plot plan submitted consistent with Part 12 of this Code. The value of the completion bond must be in an amount equivalent to the value of the permanent stormwater BMPs specified in the approved stormwater plan. Consistent with Section 1219.10(g), the completion bond will be released by the City following final verification of the construction by a registered professional engineer. (e) For an existing stormwater basin constructed prior to the effective date of the ordinance from which this chapter is derived, an approved stormwater plan must be secured prior to any significant expansion, repair, or maintenance of said stormwater basin.

(Ord. No. 1234, § 1, 9-10-18)

Ask a question about Lansing law

Corpus searches the Lansing sections it holds and shows the ones that match, with their citations. Free, no sign-in.