1219.10. - Review procedures.
(a) All stormwater management plans and BMP construction plans and specifications shall be subject to review and approval by the City Engineering Division in order to ensure conformance with the requirements of this chapter and the associated City of Lansing Stormwater Management Policies and Procedures Manual and the City of Lansing Stormwater Management Design Manual. (b) Upon submission of a stormwater management plan (stormwater plan) and BMP construction plans and specifications, as provided herein, such plan shall be reviewed by the Engineering Division and a written response prepared and submitted to the City Planning Office. If the proposed plan is not sufficient as originally submitted, the Engineering Division will notify the applicant in writing, setting forth the reasons for withholding a recommendation for approval, and will state the changes necessary to obtain approval. Failure of the owner to ultimately demonstrate that the project meets requirements, as determined by the City, shall be reason to deny approval of the stormwater plan and BMP construction plans and specifications. (c) Before approval of the final stormwater BMP construction plans, copies of all necessary wetland, floodplain, inland lakes and streams, erosion control or other needed State, Federal, or local permits relating to stormwater management have been provided by the applicant for the City's files. (d) A satisfactory maintenance agreement in accordance with Section 1219.18 that assures long-term maintenance of all drainage improvements will be in place before approval of the stormwater plan and BMP construction plans and specifications. Documentation of the maintenance agreement will be supplied to the engineering division and approved by the City Engineer. (e) A soil erosion and sedimentation control permit shall not be issued under Chapter 1218 of this Code unless the detailed stormwater plan and BMP construction plans and specifications meet the standards of this chapter and the associated City of Lansing Stormwater Management Policies and Procedures Manual and the City of Lansing Stormwater Management Design Manual. (f) For developments that will result in disturbance of five or more acres of land, a complete notice of coverage for construction-phase stormwater must be submitted to the Michigan Department of Environmental Quality, Water Resources Division, to have the discharge authorized under a National Pollutant Discharge Elimination system permit. (g) The applicant will make arrangements acceptable to the Engineering Division for inspection during construction and for final verification of the construction of all permanent stormwater BMPs by a registered professional engineer. Following final verification of the construction by a registered professional engineer, the completion bond required consistent with Section 1219.03(d) will be released by the City. (h) Electronic files of the as-built storm drains and stormwater BMPs will be submitted by the applicant or his/her engineer to the Engineering Division along with the final plan for existing systems, or upon completion of system construction for new systems. (i) Complete development agreements (including deed restrictions) must be submitted for City review and approval prior to recording.
(Ord. No. 1234, § 1, 9-10-18)
Ask a question about Lansing law
Corpus searches the Lansing sections it holds and shows the ones that match, with their citations. Free, no sign-in.