§ 4F.05 — Permit requirements
Code of Ordinances of the City of Warren, Michigan (Supp. No. 102: codified through Ordinance No. 80-840, adopted October 28, 2025) · Warren City Code § 4F.05
Corpus is an independent public-information project, not the official City of Warren website. Stable reference: corpuslaw.us/code/2b53ad2a-c8ee-4925-87a1-cd38f4939eaf
Section 4F.05 - Permit requirements.
(1) Permits may be issued only for closed loop geothermal systems. A horizontal closed loop geothermal system shall be no more than 20 feet deep. (2) Boreholes shall be drilled by water well drillers registered/licensed in the State of Michigan. (3) The standing column well geothermal system, including heat pump exchanger, piping, and all other related systems shall be installed by a geothermal well installation contractor, who is certified in the proper installation methods as specified by the geothermal system manufacturer. (4) The property owner shall maintain a well log of the borehole and "as built" plans showing the location and specifications of closed loop geothermal system components. (5) Borehole piping shall be high density polyethylene as specified in International Ground Source Heat Pump Association standards for closed loop heat pumps. (6) The annular space of the boreholes must be grouted for the full depth of the borehole using high solid bentonite grout. (7) Heat transfer fluids must be non-toxic, environmentally safe material approved by the City Engineer. (8) All wells permits must be obtained from the Macomb County Health Department (or its successor agency) and must comply with the Michigan Water Well Construction and Pump Installation Code, Groundwater Quality Control, Part 127, 1978 P.A. 368, as amended, and all rules and regulations promulgated pursuant thereto, or any replacing statute and regulations.
(Ord. No. 30-1009, § 1, 3-24-15, eff. 4-13-15)
Ask a question about Warren law
Corpus searches the Warren sections it holds and shows the ones that match, with their citations. Free, no sign-in.