§ 4F.08 — System testing
Code of Ordinances of the City of Warren, Michigan (Supp. No. 102: codified through Ordinance No. 80-840, adopted October 28, 2025) · Warren City Code § 4F.08
Corpus is an independent public-information project, not the official City of Warren website. Stable reference: corpuslaw.us/code/409fe978-7723-45af-9110-c3513dc59242
Section 4F.08 - System testing.
Pipes for geothermal system permitted under this section shall be tested hydrostatically at one and one-half times the maximum system design pressure, but not less than 100 psi (689 kPa), for a duration of not less than 15 minutes. All geothermal systems must be pressure checked by a licensed geothermal system contractor every five years from the date of its initial successful test. Results shall be filed with the City Engineer. If the test results show the system fails to meet these requirements, the City Engineer may require the property owner to shut down and /or repairs the system.
(Ord. No. 30-1009, § 1, 3-24-15, eff. 4-13-15)
Ask a question about Warren law
Corpus searches the Warren sections it holds and shows the ones that match, with their citations. Free, no sign-in.