§ 4F.03 — Permit required
Code of Ordinances of the City of Warren, Michigan (Supp. No. 102: codified through Ordinance No. 80-840, adopted October 28, 2025) · Warren City Code § 4F.03
Corpus is an independent public-information project, not the official City of Warren website. Stable reference: corpuslaw.us/code/465773e6-9569-4655-af2a-8869cc2e0fb9
Section 4F.03 - Permit required.
(1) No person or entity shall do any of the following without first obtaining a permit: (a) Construct or install a geothermal system; (b) Dig, bore, drill, replace, modify, repair, or destroy a well that is, is intended to be, or was part of a geothermal system; or (c) Make any other excavation that may intersect groundwater without first obtaining a permit from the City and, for construction of a well, a permit from the Macomb County Health Department. (d) Install a closed loop horizontal or closed loop vertical geothermal system. (No permit shall be issued for any open loop geothermal system because such systems are prohibited by Section 4F.05 below.)
(Ord. No. 30-1009, § 1, 3-24-15, eff. 4-13-15)
Ask a question about Warren law
Corpus searches the Warren sections it holds and shows the ones that match, with their citations. Free, no sign-in.
