§ 4.62 — Site plan approval
Code of Ordinances of the City of Warren, Michigan (Supp. No. 102: codified through Ordinance No. 80-840, adopted October 28, 2025) · Warren City Code § 4.62
Corpus is an independent public-information project, not the official City of Warren website. Stable reference: corpuslaw.us/code/9cfebd83-b63a-4857-bf4b-48dfd1c01cc8
Section 4.62 - Site plan approval.
Upon submitting an application for site plan approval of a Tower or antenna, the Petitioner shall also provide the following information: 1. Name, address and phone number of the Petitioner and of the owner of the property. 2. A location map of all antennas and antenna towers which the Petitioner has currently erected in the City of Warren and shall include a master plan for any future antenna locations known to the Petitioner. This requirement is for planning purposes only and shall not limit the Petitioner to the sites indicated on the map. 3. An affidavit of the total watts of effective radiated power of the proposed antenna. 4. An affidavit verifying that the proposed site and proposed antenna(s) complies with all Federal Communication Commission rules and guidelines; and all federal, state and local laws, including such rules, regulations or standards regarding signal interference. 5. A statement as to whether an environmental assessment is required by the Federal Communications Commission and a copy of the environmental assessment if one was required. 6. The antenna, antenna tower and all supporting equipment shall not block areas which will hamper firefighting equipment and maintenance of electrical lines. 7. If the proposed antenna location is on a new tower, the Petitioner shall submit an affidavit attesting that there is no suitable space available on any existing tower in the desired area. 8. An affidavit of the proposed height of the tower and a signed "safe fall" zone certification letter from a licensed and registered professional engineer, including the manner in which the support structure will fall, radius of fall, including impact from falling equipment and debris. Manufacturer's specifications of a "safe fall" zone must be submitted. No inhabited building shall be located within the safe fall zone area. 9. A statement verifying that the tower or antenna will withstand wind speeds and ice loads as required by the BOCA Building Code. The statement, together with any and all attachments, shall be certified and sealed by a licensed engineer or architect. Manufacturer's specifications must be submitted. 10. An affidavit from the applicant that the FCC regulations, rules or standards regarding non-interference are satisfied and will be maintained. The affidavit will address non-interference with public safety equipment and the ability of existing surrounding uses to receive signals from radios, televisions, telephone, modems, or other electronic equipment. 11. A filing or no filing determination from the FCC or FCC, and all registration numbers assigned by respective regulatory agencies. 12. The name, address and phone number of a contact person for engineering, emergency, maintenance and other notice purposes. This information shall be updated at all times the Facility or equipment is on the Property. 13. A consent from the property owner authorizing city officials or agents or contractors to enter the Property for purposes of inspecting the Facility, site conditions or for removal purposes, if necessary. A separate affidavit or except of lease, or other documentation from the Property owner that such owner will cause the removal or remediation of any Tower or Antenna or equipment that is abandoned, dilapidated, operating unlawfully, or causing a hazardous leak or interference. 14. A soil report from a geotechnical engineer licensed in the State of Michigan. This soils report shall include borings and statements verifying het suitability of the soil conditions for the proposed use. The requirements of the FAA, FCC and Michigan Aeronautics Commission shall be noted. 15. A maintenance plan shall be presented and approvals as part of the site plan for the proposed Facility and Site. 16. A detailed landscaping plan. 17. The description of the security to be posted at the time of receiving a building permit to ensure removal of the facility when it has been abandoned or is no longer needed, which shall remain in effect at all times until released by the City. This shall be separate from the site plan guarantee established by the Planning Commission. 18. Structural analysis report for the initial build and any co-location, when required by the engineer. 19. Written commitment to send certified emissions report demonstrating that the antennae satisfy the radio frequency emissions or to satisfy the threshold of the FCC; this report shall be required upon completion of the development, prior to site performance bond release, and updated as provided in this ordinance. 20. For new Facilities, adequate justification for a new Facility in lieu of collocation on an existing Facility.
(Ord. No. 30-1084, § 2, 7-9-24)
Ask a question about Warren law
Corpus searches the Warren sections it holds and shows the ones that match, with their citations. Free, no sign-in.
