Sec. 41-113. - Significant noncompliance.

An industrial user shall not be in significant noncompliance with the pretreatment regulations. An industrial user is in significant noncompliance if its violations meet one (1) or more of the following criteria: (1) The industrial user has chronic violations of wastewater discharge limits. Chronic violations of wastewater discharge limits occur when sixty-six (66) percent or more of all of the measurements taken during a six-month period exceed (by any magnitude) the daily maximum limit: average or instantaneous limit for the same pollutant parameter; (2) The industrial user has technical review criteria violations. Technical review criteria violations occur when thirty-three (33) percent or more of all of the measurements for any pollutant parameter taken during a six-month period equal or exceed the product of the daily maximum limit: average or instantaneous limit times the applicable TRC (TRC = 1.4 for BOD, TSS, fats, oil and grease, and 1.2 for all other pollutants except pH); (3) The industrial user violated any other pretreatment effluent limit (daily maximum, longer-term average, or instantaneous limit) that the POTW determined caused, alone or in combination with other discharges, interference, pass through, or endangered the health of the POTW personnel or the general public; (4) The industrial user discharged a pollutant that caused imminent endangerment to human health, welfare, or the environment; or resulted in the POTW's exercise of its emergency authority to halt or prevent such a discharge; (5) Within ninety (90) days after the schedule date, the industrial user did not meet a compliance schedule date or a compliance schedule milestone for starting construction, completing construction, attaining final compliance, or any other date contained in an order; (6) Within thirty (30) days after the due date, the industrial user did not provide required reports including all of the following: baseline monitoring reports, ninety-day compliance reports, periodic self-monitoring reports, and reports on compliance with compliance schedules; (7) The industrial user did not accurately report noncompliance; or (8) The violation or violations adversely affected the operation or implementation of the pretreatment program as determined by the superintendent.

(Ord. No. 80-417, § 1, 9-8-92; Ord. No. 80-744, § 8, 6-14-16)