For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 41-123 — Permit application

Code of Ordinances of the City of Warren, Michigan (Supp. No. 102: codified through Ordinance No. 80-840, adopted October 28, 2025) · Warren City Code § 41-123

Corpus is an independent public-information project, not the official City of Warren website. Stable reference: corpuslaw.us/code/3e12a50c-10c4-47a2-b6f2-7fa5125b458d

Sec. 41-123. - Permit application.

All users required to obtain a permit shall make application on a form provided by the superintendent submitting the following information within sixty (60) days from receipt of notice to file application: (1) Name, address and location of facility; (2) A statement as to whether the user is a corporation, partnership, proprietorship or other type of entity and the name of the person(s) responsible for the discharge by the user; (3) Standard Industrial Classification (SIC) code of both the industry and any processes for which federal categorical standards have been promulgated; (4) Wastewater constituents and characteristics including pollutants in the discharge which are limited by any federal, state or local standards. Sampling and analysis shall be performed in accordance with procedures established in 40 CFR 136, as amended; (5) Time and duration of discharges; (6) Average daily and instantaneous peak discharge flow rates in gallons per day, including daily, monthly, and seasonal variations. All flows shall be measured unless verifiable techniques are approved by the superintendent. (7) Site plans, floor plans, mechanical and plumbing plans detailed to show all sewers, sewer connections, inspection manholes, sampling chambers and appurtenances by size, location and elevation; (8) Detailed plans showing the pretreatment facilities and operating procedures; (9) A description of the activities, facilities and plant processes on the premises including a list of all raw materials and chemicals used at the facility which are or could be discharged to the POTW; (10) Each product produced by type, amount, process(s) and rate of production; (11) Type and amount of raw materials processed on the average and maximum per day; (12) Number and title of all employees, hours of operation, and actual or proposed hours of operation of the pretreatment system; (13) A list of all environmental control permits held by or for the user; (14) Nature and concentration of any pollutants or materials in the discharge which are limited by city, state or federal pretreatment standards, together with a statement whether or not compliance is being achieved with the pretreatment standards on a consistent basis and if not, whether operation and maintenance activities and/or additional pretreatment is necessary for the user to comply with the applicable pretreatment standards; (15) Where additional pretreatment and/or operation and maintenance is necessary to comply with the applicable pretreatment standards, the user shall provide a compliance time schedule indicating the shortest time period necessary to achieve compliance. The completion date in the schedule shall not be longer than the compliance date established for the applicable pretreatment standard. (i) All compliance time schedules shall contain progress increments providing dates for the commencement and completion of major events necessary to achieve compliance, including but not limited to hiring an engineer, completing preliminary plans and final plans, executing contracts for major components, commencing construction, completing construction and commencing operation of the system. (ii) Under no circumstances shall the city allow a time increment for any step directed toward compliance to exceed nine (9) months and no compliance period shall exceed a total of eighteen (18) months. (iii) The user shall submit, within fourteen (14) days of the scheduled date for each progress increment, a progress report to the city stating whether or not it has complied with the increment of progress, the reason for any delay and the steps being taken to return to the compliance time schedule. In no event shall more than nine (9) months elapse between submittal of progress reports to the city. (16) Any other information required to be submitted by the superintendent. (17) All permit applications shall be signed by an authorized representative and certified as required in section 41-85.

(Ord. No. 80-417, § 1, 9-8-92)

Ask a question about Warren law

Corpus searches the Warren sections it holds and shows the ones that match, with their citations. Free, no sign-in.