§ 17.71 PATCHING AND RESTORATION OF RIGHT-OF-WAY.
The permit holder PERMIT HOLDER. Any person to whom a permit to excavate or obstruct a right-of-way has been granted by the city under this Article IV. shall patch PATCH or PATCHING. A method of pavement replacement that is temporary in nature. A PATCH consists of: (1) the compaction of the subbase and aggregate base; and (2) the replacement, in kind, of the existing pavement for a minimum of two feet beyond the edges of the excavation in all directions. A PATCH is considered full restoration only when the pavement is included in the city’s five year project plan. its own work. The work to be done under the excavation permit EXCAVATION PERMIT. A permit which must be obtained before a person may excavate in a right-of-way. An EXCAVATION PERMIT allows the holder to excavate in that part of the right-of-way described in the permit. , and the patching PATCH or PATCHING. A method of pavement replacement that is temporary in nature. A PATCH consists of: (1) the compaction of the subbase and aggregate base; and (2) the replacement, in kind, of the existing pavement for a minimum of two feet beyond the edges of the excavation in all directions. A PATCH is considered full restoration only when the pavement is included in the city’s five year project plan. and restoration RESTORE or RESTORATION. The process by which the right-of-way and surrounding area, including pavement and foundation, is returned to the same condition and life expectancy that existed before excavation. of the right-of-way as required herein, must be completed within the dates specified in the permit unless the permit holder PERMIT HOLDER. Any person to whom a permit to excavate or obstruct a right-of-way has been granted by the city under this Article IV. is granted a new permit or an extension of the initial permit by the Director DIRECTOR. The City’s Director of Public Works or designee. pursuant to § 17.68(b) of this Article IV. (a) City CITY. The City of Bloomington, Minnesota. restoration RESTORE or RESTORATION. The process by which the right-of-way and surrounding area, including pavement and foundation, is returned to the same condition and life expectancy that existed before excavation. . If the city CITY. The City of Bloomington, Minnesota. restores RESTORE or RESTORATION. The process by which the right-of-way and surrounding area, including pavement and foundation, is returned to the same condition and life expectancy that existed before excavation. the right-of-way, the permit holder PERMIT HOLDER. Any person to whom a permit to excavate or obstruct a right-of-way has been granted by the city under this Article IV. shall pay the costs thereof within 30 days of billing. If, during the 24 months following such restoration RESTORE or RESTORATION. The process by which the right-of-way and surrounding area, including pavement and foundation, is returned to the same condition and life expectancy that existed before excavation. , the pavement PAVEMENT. Any type of improved surface that is within the public right-of-way and that is paved or otherwise constructed with paver blocks, bituminous, concrete, aggregate or gravel. settles due to the permit holder’s PERMIT HOLDER. Any person to whom a permit to excavate or obstruct a right-of-way has been granted by the city under this Article IV. improper backfilling, the permit holder PERMIT HOLDER. Any person to whom a permit to excavate or obstruct a right-of-way has been granted by the city under this Article IV. shall pay to the city CITY. The City of Bloomington, Minnesota. , within 30 days of billing, all costs associated with having to correct the defective work. At the time of initial permit application, the permit holder PERMIT HOLDER. Any person to whom a permit to excavate or obstruct a right-of-way has been granted by the city under this Article IV. must indicate whether or not they are electing to pay the degradation fee DEGRADATION FEE. The fee established at the time of permitting by the city to recover costs associated with the decrease in the useful life of the right-of-way caused by the excavation, and which equals the degradation cost. in lieu of restoration RESTORE or RESTORATION. The process by which the right-of-way and surrounding area, including pavement and foundation, is returned to the same condition and life expectancy that existed before excavation. . (b) Permit holder PERMIT HOLDER. Any person to whom a permit to excavate or obstruct a right-of-way has been granted by the city under this Article IV. restoration RESTORE or RESTORATION. The process by which the right-of-way and surrounding area, including pavement and foundation, is returned to the same condition and life expectancy that existed before excavation. . If the permit holder PERMIT HOLDER. Any person to whom a permit to excavate or obstruct a right-of-way has been granted by the city under this Article IV. restores RESTORE or RESTORATION. The process by which the right-of-way and surrounding area, including pavement and foundation, is returned to the same condition and life expectancy that existed before excavation. the right-of-way, it shall at the time of application for a right-of-way permit RIGHT-OF-WAY PERMIT. An excavation permit, obstruction permit, pole attachment permit or a utility permit, or any combination thereof, depending on the context required by this Article IV . post security in the form determined by the Director DIRECTOR. The City’s Director of Public Works or designee. , such as a performance bond, letter of credit or cash deposit in an amount determined by the Director DIRECTOR. The City’s Director of Public Works or designee. to be sufficient to cover the cost of restoration RESTORE or RESTORATION. The process by which the right-of-way and surrounding area, including pavement and foundation, is returned to the same condition and life expectancy that existed before excavation. . Any performance bond or letter of credit must be approved by the City Attorney. If, within 24 months after completion of restoration RESTORE or RESTORATION. The process by which the right-of-way and surrounding area, including pavement and foundation, is returned to the same condition and life expectancy that existed before excavation. of the right-of-way, the Director DIRECTOR. The City’s Director of Public Works or designee. determines the right-of-way has been properly restored, the posted security will be released. (c) Standards. The permit holder PERMIT HOLDER. Any person to whom a permit to excavate or obstruct a right-of-way has been granted by the city under this Article IV. shall perform patching PATCH or PATCHING. A method of pavement replacement that is temporary in nature. A PATCH consists of: (1) the compaction of the subbase and aggregate base; and (2) the replacement, in kind, of the existing pavement for a minimum of two feet beyond the edges of the excavation in all directions. A PATCH is considered full restoration only when the pavement is included in the city’s five year project plan. and restoration RESTORE or RESTORATION. The process by which the right-of-way and surrounding area, including pavement and foundation, is returned to the same condition and life expectancy that existed before excavation. according to the city CITY. The City of Bloomington, Minnesota. standards specified in Plates 1 to 13 (located in Appendix A), which are attached hereto and incorporated herein. (d) Guarantees. If the permit holder PERMIT HOLDER. Any person to whom a permit to excavate or obstruct a right-of-way has been granted by the city under this Article IV. performs the restoration RESTORE or RESTORATION. The process by which the right-of-way and surrounding area, including pavement and foundation, is returned to the same condition and life expectancy that existed before excavation. work, the permit holder PERMIT HOLDER. Any person to whom a permit to excavate or obstruct a right-of-way has been granted by the city under this Article IV. shall guarantee such work and its maintenance for 24 months following its completion. During this 24-month period it shall, upon notification from the Director DIRECTOR. The City’s Director of Public Works or designee. , correct all restoration RESTORE or RESTORATION. The process by which the right-of-way and surrounding area, including pavement and foundation, is returned to the same condition and life expectancy that existed before excavation. work to the extent necessary, using the method required by the Director DIRECTOR. The City’s Director of Public Works or designee. commencing the restoration RESTORE or RESTORATION. The process by which the right-of-way and surrounding area, including pavement and foundation, is returned to the same condition and life expectancy that existed before excavation. work within two days of receipt of the notice and completing the restoration RESTORE or RESTORATION. The process by which the right-of-way and surrounding area, including pavement and foundation, is returned to the same condition and life expectancy that existed before excavation. work within 14 days thereafter, not including days during which work cannot be done because of circumstances constituting force majeure or days when work is prohibited as unseasonal or unreasonable in the determination of the Director DIRECTOR. The City’s Director of Public Works or designee. . (e) Failure to restore RESTORE or RESTORATION. The process by which the right-of-way and surrounding area, including pavement and foundation, is returned to the same condition and life expectancy that existed before excavation. . If the permit holder PERMIT HOLDER. Any person to whom a permit to excavate or obstruct a right-of-way has been granted by the city under this Article IV. fails to restore RESTORE or RESTORATION. The process by which the right-of-way and surrounding area, including pavement and foundation, is returned to the same condition and life expectancy that existed before excavation. the right-of-way in the manner and to the condition required by the city CITY. The City of Bloomington, Minnesota. , or fails to satisfactorily and timely complete all restoration RESTORE or RESTORATION. The process by which the right-of-way and surrounding area, including pavement and foundation, is returned to the same condition and life expectancy that existed before excavation. required by the city CITY. The City of Bloomington, Minnesota. , the city CITY. The City of Bloomington, Minnesota. shall notify the permit holder PERMIT HOLDER. Any person to whom a permit to excavate or obstruct a right-of-way has been granted by the city under this Article IV. in writing of the specific alleged failure or failures and shall allow the permit holder PERMIT HOLDER. Any person to whom a permit to excavate or obstruct a right-of-way has been granted by the city under this Article IV. five business days from receipt of said written notice to cure said failure or failures, unless otherwise extended by the Director DIRECTOR. The City’s Director of Public Works or designee. . In the event the permit holder PERMIT HOLDER. Any person to whom a permit to excavate or obstruct a right-of-way has been granted by the city under this Article IV. fails to cure, the city CITY. The City of Bloomington, Minnesota. may at its option perform the necessary work and permit holder PERMIT HOLDER. Any person to whom a permit to excavate or obstruct a right-of-way has been granted by the city under this Article IV. shall pay to the city CITY. The City of Bloomington, Minnesota. , within 30 days of billing, the cost of restoring the right-of-way, including all staff and administrative costs, their overhead and fringe benefits. If permit holder PERMIT HOLDER. Any person to whom a permit to excavate or obstruct a right-of-way has been granted by the city under this Article IV. fails to pay as required, the city CITY. The City of Bloomington, Minnesota. may recover its costs from the posted security. (f) Degradation fee DEGRADATION FEE. The fee established at the time of permitting by the city to recover costs associated with the decrease in the useful life of the right-of-way caused by the excavation, and which equals the degradation cost. in lieu of restoration RESTORE or RESTORATION. The process by which the right-of-way and surrounding area, including pavement and foundation, is returned to the same condition and life expectancy that existed before excavation. . In lieu of right-of-way restoration RESTORE or RESTORATION. The process by which the right-of-way and surrounding area, including pavement and foundation, is returned to the same condition and life expectancy that existed before excavation. , a right-of-way user RIGHT-OF-WAY USER. (1) A telecommunications right-of-way user as defined by M.S. § 237.162, subd. 4, as it may be amended from time to time; or (2) a person owning or controlling a facility in the public right-of-way that is used or is intended to be used for providing utility service, and who has a right under the law, franchise or ordinance to use the public right-of-way. may elect to pay a degradation fee DEGRADATION FEE. The fee established at the time of permitting by the city to recover costs associated with the decrease in the useful life of the right-of-way caused by the excavation, and which equals the degradation cost. . However, the right-of-way user RIGHT-OF-WAY USER. (1) A telecommunications right-of-way user as defined by M.S. § 237.162, subd. 4, as it may be amended from time to time; or (2) a person owning or controlling a facility in the public right-of-way that is used or is intended to be used for providing utility service, and who has a right under the law, franchise or ordinance to use the public right-of-way. shall remain responsible for replacing and compacting the subgrade and aggregate based material in the excavation and the degradation fee DEGRADATION FEE. The fee established at the time of permitting by the city to recover costs associated with the decrease in the useful life of the right-of-way caused by the excavation, and which equals the degradation cost. shall not include the cost to accomplish these responsibilities. (Ord. 98-54, passed 11-16-1998; Ord. 2006-32, passed 7-24-2006)
Ask a question about Bloomington law
Corpus searches the Bloomington sections it holds and shows the ones that match, with their citations. Free, no sign-in.