§ 17.77 — REVOCATION OF PERMITS
Bloomington, Minnesota City Code · Bloomington City Code § 17.77
Corpus is an independent public-information project, not the official City of Bloomington website. Stable reference: corpuslaw.us/code/02c68960-5542-4d82-b7e2-26aa8ebb8f98
§ 17.77 REVOCATION OF PERMITS.
(a) Substantial breach. The Director DIRECTOR. The City’s Director of Public Works or designee. or designee may revoke a right-of-way permit RIGHT-OF-WAY PERMIT. An excavation permit, obstruction permit, pole attachment permit or a utility permit, or any combination thereof, depending on the context required by this Article IV . , without a fee refund, if there is a substantial breach of the terms or conditions of any statute, this code, rule or regulation, or any condition of the permit. A substantial breach of a permit holder PERMIT HOLDER. Any person to whom a permit to excavate or obstruct a right-of-way has been granted by the city under this Article IV. shall include, but not limited to, the following: (1) The violation of any material provision of the permit; (2) Any material misrepresentation of fact in the application for a permit; (3) The failure to maintain the required bonds or other security and insurance; (4) The failure to complete the work in a timely manner; (5) The failure to correct, in a timely manner, work that does not conform to applicable standards, conditions or codes, upon inspection and notification by the city CITY. The City of Bloomington, Minnesota. of the faulty condition; (6) An evasion or attempt to evade any material provision of the right-of-way permit RIGHT-OF-WAY PERMIT. An excavation permit, obstruction permit, pole attachment permit or a utility permit, or any combination thereof, depending on the context required by this Article IV . , or the perpetration or attempt to perpetrate any fraud or deceit upon the city CITY. The City of Bloomington, Minnesota. or its citizens; and (7) The failure to comply with the terms and conditions of any applicable federal, state and local laws, rules and regulations, including any provision of this Article IV. (b) Notice of breach. If the Director DIRECTOR. The City’s Director of Public Works or designee. or designee determines that a permit holder PERMIT HOLDER. Any person to whom a permit to excavate or obstruct a right-of-way has been granted by the city under this Article IV. has committed a substantial breach of a term or condition of any statute, this code, rule or regulation or any condition of the permit, the Director DIRECTOR. The City’s Director of Public Works or designee. shall make a written demand upon the permit holder PERMIT HOLDER. Any person to whom a permit to excavate or obstruct a right-of-way has been granted by the city under this Article IV. to remedy such violation and provide proof thereof within the period of time specified or be subject to potential revocation of the permit. The Director DIRECTOR. The City’s Director of Public Works or designee. may impose additional or revised conditions on the permit to mitigate or remedy the breach. (c) Reimbursement of city CITY. The City of Bloomington, Minnesota. costs. If a permit is revoked, the permit holder PERMIT HOLDER. Any person to whom a permit to excavate or obstruct a right-of-way has been granted by the city under this Article IV. shall reimburse the city CITY. The City of Bloomington, Minnesota. for its reasonable costs, including restoration costs RESTORATION COST. The amount of money paid to the city by a permit holder to achieve the level of restoration according to city Plates 1 to 13 (located in Appendix A), which are attached hereto and incorporated herein. and the costs of collection and reasonable attorney fees incurred in connection with the revocation. (Ord. 98-54, passed 11-16-1998; Ord. 2006-32, passed 7-24-2006)
Ask a question about Bloomington law
Corpus searches the Bloomington sections it holds and shows the ones that match, with their citations. Free, no sign-in.