§ 4.04 — Subsurface sewage treatment systems
City Code of the City of Eagan, Minnesota (Codified through Ordinance No. 644, 2nd series, enacted April 7, 2026. (Supp. No. 43)) · Eagan City Code § 4.04
Corpus is an independent public-information project, not the official City of Eagan website. Stable reference: corpuslaw.us/code/c77c8d35-68bc-4f73-a8a4-a4af2b50a898
Sec. 4.04. - Subsurface sewage treatment systems.
A. Findings and purpose statement. The city council finds that the location, design, installation, use or maintenance of subsurface sewage treatment systems (SSTS) may adversely affect the health, safety and welfare of the city residents and the general public by the potential discharge of inadequately treated sewage into ground waters, ground surfaces or surface waters. In the interest of protecting the health, safety and welfare of the public, the city has established the regulations herein. B. Adoption of Water Pollution Control Act and MPCA Regulatory Rules. Minn. Stats., §§ 115.55 and 115.56, comprising as part of the Minnesota Pollution Control Act, as amended through 2014 and any amendments thereto established and adopted hereafter from time to time, and Minnesota Rules, Chapters 7080, 7081 and 7082, comprising a part of the Minnesota Pollution Control Agency Subsurface Sewage Treatment Systems Rules, effective as of January 2014 and any amendments thereto established and adopted thereafter from time to time, are hereby adopted and incorporated herein by reference, except as otherwise provided herein. A copy of the provisions adopted herein shall be on file at the city inspection department. The provisions adopted herein shall be referred to hereinafter as state requirements. C. Definitions. For purposes of this section, the terms and phrases herein shall have the definitions given in Minn. Stats. § 115.55 and Minn. Rules, chapters 7080, 7081, and 7082. D. License required. No person shall design, install, maintain, pump, repair, replace, extend, or provide services to, or inspect an SSTS which is located within the city without a license issued pursuant to Minn. Stats. § 115.56. E. Subsurface sewage treatment system permit and plan. 1. Permit required. No person shall newly construct or replace, extend or repair an SSTS without first obtaining a permit therefor from the city. Any new construction or replacement or repair of an SSTS or an upgrade required due to a bedroom addition shall be in compliance with the state requirements adopted herein. No Type IV, Type V or MSTS system or any SSTS system constructed in accordance with approved alternative standards shall serve or be utilized on a property unless an operating permit from the city is in effect. 2. Permit application. The application for a permit hereunder shall be in writing and submitted to the city's chief building official on a form as the city shall provide, including the following information: (a) Certified written site evaluation report in accordance with Minn. Rule, Chapters 7080 and 7081 and this section; (b) A certified design report, including drawings, calculations and summary of all of the SSTS components; (c) For any lot created after January 23, 1996, a certified lot survey depicting the location of two soil treatment and dispersal areas on the lot that support the proposed SSTS. (d) For any newly constructed or replacement SSTS, a management plan that shall set forth the frequency of maintenance tasks including solids removal, not to exceed every 3 years, monitoring of maintenance and operation, requirement of owner to notify the city when the SSTS is not in compliance or is abandoned, and requirement of owner to file with the building inspections department all maintenance records or reports. 3. Issuance of permit. No permit shall be issued under this section unless the application establishes that the SSTS will be in compliance with the state requirements adopted herein. The permit application, along with all exhibits thereto, shall be reviewed and certified by a licensed compliance inspector authorized by the city that the newly constructed or replaced, repaired or upgraded system will meet the applicable state requirements. The construction, replacement, repair or upgrade of an SSTS may be initiated only upon the issuance of the permit. No newly constructed, repaired, replaced or upgraded SSTS may be used until a certificate of compliance is issued by a compliance inspector in accordance with this section. 4. Bedroom addition building permit or variance. The city shall not issue a building permit or a variance for an addition of a bedroom on property served by SSTS except upon receipt of a certificate of compliance. The city may temporarily waive the certificate of compliance requirement for a building permit or variance for an application made during the period of November 1 through April 30, provided that an inspection of the system is performed by the following June 1 and a certificate of compliance is submitted to the city by the following July 1. 5. Expiration of permit. A permit issued hereunder shall be valid for a period of 180 days. If no substantial work has commenced within that period, the permit shall terminate. 6. Appeals of decisions. An applicant may appeal any decision or determination by the city in connection with any provision of this section pursuant to the procedures set forth in section 11.40 of the City Code. 7. Permit fees. Any SSTS permit fee shall be as set forth by a duly adopted city council resolution. 8. Certified site evaluation report. It shall be the responsibility of any site evaluator to utilize the proper professional tools, professional methods and judgments, and number of soil observations to verify that the site complies with Minnesota Rules, Chapters 7080 for individual SSTS or 7081 for mid-size SSTS standards and requirements for the primary (initial) and reserve (replacement) areas. The primary area shall consist of a minimum of 5,250 square feet per site, unless otherwise directed by the city. The size of the reserve area shall be similar in size as the primary area. No person shall use the primary area as the reserve area unless all requirements under Chapters 7080 or 7081 as applicable and as certified by the licensed designer are met. The site evaluator shall use the Dakota County Soil Survey and Munsell Soil Color Charts in accordance with Minnesota Rules, Chapter 7080, standards and requirements. A minimum of four soil observations and two percolation test must be completed for each the primary area and the reserve area. 9. As-built record. For each newly constructed or replaced, extended, ungraded or repaired SSTS, an "as-built" record shall be properly completed and filed with the city no later than ten days after completion of the new construction, replacement, upgrade or repair of the SSTS. 10. Management plan. The owner and occupant of any property on which an SSTS is located shall comply with the management plan submitted with and approved by the city in the permit application process for the SSTS on the property. 11. Abandonment of SSTS. The owner and occupant of any property on which an SSTS is located shall notify the city of any SSTS on the property that is no longer in use and shall remove or seal the SSTS or components thereof in accordance with the state requirements within 90 days of the last day of use. F. Subsurface sewage treatment system inspection. 1. Compliance inspections required. An inspection to determine whether an SSTS is in compliance with the state requirements adopted herein shall be conducted whenever an SSTS permit is required under this section. Any compliance inspection performed hereunder shall be conducted by a licensed inspector, whose license is independent of the permit applicant, the owner and the installer of the SSTS to be inspected. The manner and timing of the compliance inspection shall be as required by the licensed inspector for purposes of new construction or replacement or upgrade of an SSTS. In the event a licensed inspector cannot perform an inspection at the SSTS site, the licensed inspector may conduct the compliance inspection through the use of video, electronic, photographic or other reliable evidence of compliance provided by the licensed installer. 2. Certificate of compliance and notice of noncompliance. The licensed inspector shall submit a certificate of compliance or notice of noncompliance to the city and the owner of the SSTS within 15 business days after the compliance inspection. The certificate of compliance or notice of noncompliance must include a certified statement from the licensed inspector that identifies the type of system inspected and indicates whether the SSTS is in compliance with the state requirements adopted herein. In the event the SSTS is not in compliance, the inspector shall specify the basis for noncompliance and whether the SSTS must be upgraded, replaced or its use discontinued. If the SSTS presents an imminent threat to public health or safety, the notice of noncompliance must contain a statement to this effect. If a notice of noncompliance is submitted to the city, a second compliance inspection shall be completed upon the upgrade, replacement, repair or discontinued use as required in the notice of noncompliance. 3. Bedroom addition building permit or variance. No building permit for the addition of a bedroom on property served by an SSTS shall be issued unless a compliance inspection is performed and a certificate of compliance is submitted to the city. 4. Periodically saturated soil discrepancies or disputes. If a documented discrepancy arises as to the depth of the periodically saturated soil between licensed system professionals/business or a licensed business and the city Building Official for purposes of SSTS design or compliance, then the parties, including the property owner, shall participate in a dispute resolution method as set forth in Minn. Rules, Chapter 7082. G. Repair of noncomplying or failing subsurface sewage treatment systems. The owner or occupant of any property on which a noncomplying or failing SSTS is located shall upgrade, repair, replace or discontinue the use of the SSTS in accordance with the requirements of Minn. Rules, Chapter 7080 or 7081 as applicable and the notice of noncompliance. Any noncomplying or failing SSTS from which discharge or sewage can be contained within the property the SSTS serves and is not an imminent threat to public health or safety shall be corrected within 180 days of the date of service of the notice of noncompliance. Any noncomplying or failing SSTS from which discharged sewage cannot be contained within the property the SSTS serves or that poses an imminent threat to the public health and safety, shall be corrected within 30 days of service of the notice of noncompliance unless weather conditions prevent correction within 30 days in which case the owner or occupant shall implement temporary corrective measures (such as regular pumping of the SSTS) and complete permanent corrective measures as soon as physically feasible, but in no case later than 180 days or July 1 immediately following the date of service of the notice of noncompliance, whichever is longer. Upon the repair, upgrade, replacement or discontinuance of the use of the SSTS as directed in the notice of noncompliance, a second compliance inspection must be completed within 30 days of the repair, upgrade, replacement or discontinuance and a certificate of compliance must be filed with the city within 30 days of the inspection. If the owner or occupant fails to comply with this section, the use of the SSTS must be discontinued immediately. H. Minimum soil treatment area. Any property or lot platted after January 23, 1996, and served by an SSTS shall have a minimum of one additional soil treatment and dispersal area which can support a standard soil treatment system. I. Application of other statutes, regulatory rules or local regulations. In addition to all provisions of this section, all federal, state and local statutes, rules and regulations governing the discharge or disposal of sewage or the construction, repair or replacement of any individual sewage treatment system that is newly constructed or replaced or repaired shall apply with which all person shall comply within the city. Any conflict between the provisions of this section and any other state or local statute, regulation or ordinance, shall be resolved in favor of the more restrictive provision. J. Required septic tank sizing. Any septic tank for a new or replacement septic tank for any SSTS shall be sized 50 percent greater than the minimum size requirement provided in Minnesota Rules, Chapter 7080 or 7081 as applicable. In the event that a basement toilet which exists or could exist would require a pump, the septic tank capacity shall be sized for both the potential basement toilet and the basement raw sewage pump in accordance with Minnesota Rules, Chapter 7080 or 7081 as applicable and the following: No. Bedrooms | Minimum Liquid Capacity | Minimum Liquid Capacity with Garbage Disposal | Minimum Liquid Capacity with Garbage Disposal and Basement Sewage Lift 2 | 1125 | 1125 | 1500 3 or 4 | 1500 | 1500 | 2000 5 or 6 | 2250 | 2250 | 3000 7, 8 or 9 | 3000 | 3000 | 4000 K. Septic tank and lift station requests. No cesspool, seepage pit or dry well shall be used or repaired or modified for use as a septic tank or pump-lift station. No septic tank shall be constructed of concrete blocks. Holding tanks may be used for the following applications only after it can be shown conclusively by the property owner that a SSTS permitted under this chapter cannot be feasibly installed and is permitted under the issued permit: 1. As a replacement for an existing failing SSTS; 2. For an SSTS that poses an imminent threat to public health or safety; or 3. For use with buildings with limited water use. L. Determination of hydraulic loading rate and SSTS sizing. Table IX from Minn. R. 7080.2150, Subp. 3(E) entitled Loading Rates for Determining Bottom Absorption Area for Absorption Ratios Using Detailed Soil Descriptions and Table IXa from Minn. R. Ch. 7080.2150, Subp. 3(E) entitled Loading Rates for Determining Bottom Absorption Area and Absorption Ratios Using Percolation Tests and herein adopted by reference shall both be used to size SSTS infiltration areas using the larger sizing factor of the two for SSTS design. M. Class V injection wells. All owners of new or replacement SSTS that are considered to be Class V injection wells, as defined in the Code of Federal Regulations, Title 40, Part 144, are required to submit SSTS inventory information to the United States Environmental Protection Agency and the MPCA. Owners are also required to identify all Class V injection wells in property transfer disclosures. N. Variance. A property owner may request a variance from the provisions in this section upon filing an application for variance in accordance herein with the city building official. The variance application must provide the following: 1. The specific provision in the rule or rules from which the variance is requested; 2. The reasons why compliance with the rule(s) cannot be met; 3. A detail description of the circumstances that prevent compliance with the rule and why the circumstances make compliance unreasonable, impractical or not feasible; 4. The alternative measures that will be taken to ensure a comparable degree of compliance with the intention of the applicable chapter; 5. The length of time for which the variance is requested; and 6. Other relevant information requested by the chief building official as necessary to properly evaluate the variance request. The chief building official may grant a variance only upon a finding that by reason of exceptional circumstances, which were not due to or created by the applicant, the strict enforcement or strict conformity with this chapter would be unreasonable, impractical, or not feasible under the circumstances. The chief building official may permit a variance so long as it is in harmony with the general purpose of this chapter and Minnesota Rules, Chapters 7080 and 7081 and the intent of applicable state requirements. O. Suspension or revocation of permit. Upon any violation of any term or condition of a permit issued under this section or any violation of any state requirement adopted herein in connection with the construction, replacement, expansion or repair of a SSTS, the chief building official may suspend or revoke the permit and all work or operation thereunder shall cease. The owner and licensed permit holder shall bring the SSTS into compliance with this chapter as directed by the chief building official. If compliance is not met within the timeframe set by the chief building official, the permit shall be deemed automatically revoked.
(Ord. No. 271, 2nd series, eff. 12-31-98; Ord. No. 534, 2nd series, § 2, eff. 1-6-2015)
Ask a question about Eagan law
Corpus searches the Eagan sections it holds and shows the ones that match, with their citations. Free, no sign-in.
