Sec. 4.34. - Stormwater management regulations.
A. Findings and purpose statement. The city council finds it is in the best interest of the city to protect, preserve, and enhance the city's natural resources of its and the region's water bodies, its stormwater system and public and private lands as may be adversely affected by the alteration to and the development of land within the city, as well as the maintenance of land and property with the use of potentially pollutant materials and substances. Unmanaged stormwater runoff from land disturbing activities, increased development of land, and outdoor use and storage of pollutant substances within the city have significant adverse impacts upon local and regional water resources diminishing the quality thereof and the public health, safety, and welfare of its residents as follows: 1. Increased runoff volumes and peak flood flows and overburdening the city's storm sewers, drainage ways and other storm drainage systems. 2. Diminish the capacity of lakes and streams to support fish, aquatic life, recreational and water supply uses by increasing pollutant loadings of sediment, suspended solids, nutrients, heavy metals, toxics, debris, bacteria, pathogens, biological impairments, thermal stress and other pollutants. 3. Degrade physical stream habitat by increasing stream bank erosion, increasing stream bed scour, diminishing groundwater recharge, diminishing stream base flows and increasing stream temperatures. 4. Undermine floodplain management efforts by increasing the incidence and levels of flooding. 5. Alter wetland communities by changing wetland hydrology and increasing pollutant loads. 6. Impact groundwater by reducing recharge and increasing potential pollutant loading. To address these public health, safety and welfare concerns, the purpose of this section is to establish regulations that control and manage stormwater runoff from land that is subject to land disturbing activity and/or development, whether new or redevelopment, or on which potentially pollutant materials and substances are stored and used that will: 1. Meet minimum impact standards (MID) performance goals. 2. Assist in meeting NPDES/SDS municipal separate storm sewer system (MS4) and construction stormwater general permit requirements. 3. Assist in meeting total maximum daily load (TMDL) plan wasteload allocations for impaired waters through quantification of load reductions. 4. Protect life and property from dangers associated with flooding. 5. Protect public and private property and natural resources from damage resulting from stormwater runoff and erosion. 6. Ensure the annual stormwater runoff rates and volumes from post development conditions mimic and/or reduce the annual runoff rates and volumes from predevelopment site conditions. 7. Ensure site design minimizes the generation of stormwater and maximizes pervious areas for stormwater treatment. 8. Provide a single, consistent set of performance goals that apply to all developments. 9. Protect water quality from pollutant loadings of sediment, suspended solids, nutrients, heavy metals, toxics, debris, bacteria, pathogens, biological impairments, thermal stress and other pollutants. 10. Promote infiltration and groundwater recharge. 11. Provide vegetated corridors (buffers) to protect water resources from development. 12. Protect functional values of all types of natural water bodies (e.g., rivers, streams, wetlands, lakes, seasonal ponds). 13. Sustain or enhance biodiversity (native plant and animal habitat) and support riparian ecosystems. B. Authorization and scope. 1. Statutory authorization. This section is adopted pursuant to federal regulations under the Clean Water Act and the Minnesota Rules administered under the stormwater regulatory program by the Minnesota Pollution Control Agency. 2. Scope. This section applies to and a stormwater management permit is required hereunder for any one of the following: (a) New development of any land; (b) Redevelopment of any lot of record; (c) Subdivision of any land on which any new improvements are proposed to be built; (d) Issuance of a building permit where a building is demolished in whole regardless if the new building or improvements create equal to or less than the impervious surface than that existed prior to demolition; (e) Issuance of a building permit where a building is demolished in part, but the new building or improvements on the site create more impervious surface than that existing prior to demolition; (f) Land disturbing activity as defined in this section, including excavations regulated in chapter 4 of this Code; (g) Any activity that creates 10,000 square feet or more of new or fully reconstructed impervious surface on an individual lot of record or in aggregate on one or more lots of record if activity is part of a single project; (h) Outdoor bulk storage of de-icing material or substances, as specifically provided and regulated herein. When a building or grading permit is issued in connection with a project or a new development, redevelopment, or subdivision project is approved by the city council as required in this Code, the building or grading permit or the new development, redevelopment, or subdivision approval by the city may be in lieu of the stormwater management permit required hereunder, provided the applicant shall comply with all regulations herein and all conditions required under the separate permits or approvals. C. Definitions. For purposes of this section, the following terms shall be defined as stated: Applicant means any person or entity required to submit an application for a permit under this section or is otherwise subject to the regulations of this section. Best management practices (BMPs) means a practice, or combination of practices, that is determined to be an effective and practicable (including technological, economic, and institutional considerations) means of preventing, controlling or managing soil erosion, sedimentation and water quality of water bodies, including rivers and streams, from runoff. BMPs include avoidance of impacts, construction-phasing, minimizing the length of time soil areas are exposed, prohibited activity, and other management practices published by the state or designated area-wide planning agencies. The MIDS Credit Calculator includes post-construction stormwater BMPs that may be considered under this section. City of Eagan Stormwater Design Guide means the city's most current publication of its accepted design standards, design plates and references for compliance with the city's stormwater management requirements. The stormwater design guide as set forth in the city's Engineering Standards Manual is available in the City of Eagan Engineering Division of the Public Works Department. Clean Water Act means the federal law and regulations regulating discharges of pollutants into the waters of the United States and regulating quality standards for surface waters set forth in 33 U.S.C. § 1251 et seq. (1972 and as subsequently amended thereafter and hereafter). Common plan of development means a contiguous area where separate and distinct land disturbing activities may be taking place at different times on different, but adjacent, or on different schedules, but under one proposed plan, including but not limited to mass site grading, utility installation, street construction and home or building construction. This item is broadly defined to include design, permit application, advertisement or physical demarcation indicating that land disturbing activities may occur. Compacted soil means a reduction in soil volume resulting from an applied force, such as that by machinery, often affecting the upper 12 inches of depth of disturbed soil, in which there is a loss of soil aggregates, destroyed aeration pore spaces, crushed or collapsed pore spaces, and extensive resorting and packing of soil particles, which significantly increases bulk density, thereby prohibiting root growth and water infiltration, resulting in an increased volume and rate of surface runoff. Critical root zone of a tree (CRZ) means an imaginary circle surrounding the tree trunk with a radius distance of one foot per one inch of tree diameter, e.g., a 20-inch diameter tree has a CRZ with a radius of 20 feet. De-icing material or substance means any substance, in dry or liquid form, that is used for the intended purpose of melting snow and ice or for its anti-icing or anti-slipping effects. The substance may be sand or other natural earth material or a chemical-based material such as sodium chloride, magnesium chloride, or calcium chloride, or a combination thereof. Dewatering means the removal of water for construction activity. Dewatering can be a discharge of appropriated surface water or groundwater to dry and/or solidify a construction site. Dewatering may also include a more permanent condition where the discharge of surface water is required for the integrity of a permanent structure. Discharge means the release, conveyance, channeling, runoff, or drainage of water that is from dewatering or runoff. Erosion means the process by which the surface of the earth (such as soil, dirt, and rock) wears away as a result of the movement of wind, water and/or ice. Erosion control means methods employed to prevent temporary and permanent erosion, such as soil stabilization practices, horizontal slope grading, temporary or permanent ground cover, and construction phasing. Final stabilization means that all soil disturbing activities at the site have been completed, and that a uniform (evenly distributed, e.g., without large bare areas) perennial vegetative cover with a density of 70 percent of the cover for unpaved areas and areas not covered by permanent structures has been established, or equivalent permanent stabilization measures have been employed. Simply sowing grass seed is not considered final stabilization. Fully reconstructed impervious surface means impervious surfaces have been removed and the underlying soils are exposed and new impervious surfaces installed. Installation of impervious surfaces as a result of structure renovation, pavement mill and overlay projects, and pavement rehabilitation projects that do not expose or alter underlying soil material are not considered fully reconstructed impervious surfaces. In addition, other maintenance activities, such as catch basin and pipe replacements, shall not be considered fully reconstructed impervious surfaces. Reusing an existing building foundation or re-roofing of an existing building is not considered a fully reconstructed impervious surface. Groundwater (underground waters) means water contained below the surface of the earth in the saturated zone including, without limitation, all waters whether confined, unconfined, or perched conditions, in near surface unconsolidated sediment or regolith, or in rock formations deeper underground. The term groundwater shall be synonymous with underground water. High water level (HWL) means the calculated peak pond or stormwater storage elevation for a one percent probability rainfall storm or snowmelt event as defined in the city Stormwater Management Plan. Impervious surface means a surface that has been compacted, or covered with a layer of non-porous material (including buildings/structures), or is likely to become compacted from expected use, so that it is highly resistant to infiltration by water and to cause water to run off the surface in greater quantities and at an increased rate of flow than pervious surfaces. Impervious surfaces shall include, but not be limited to, rooftops; sidewalks; patios; driveways; parking lots; storage areas; concrete, asphalt, or gravel roads; sport courts; swimming pools; covered decks and other structures; compacted Class 5 gravel areas. An area of land that would be normally considered pervious may be considered impervious if it has been or will be compacted from any activity on the land area, such as heavy equipment movement, stockpiling of earth material, etc. Infiltration means the process of water percolating or penetrating into the earth's subsoil. Land or parcel of land or subject property means an entire lot or parcel, as defined by the zoning regulations of this Code, on or within the boundaries of which a project subject to the requirements of this section is occurring, has occurred or is to occur. Land disturbing activity means any excavating, grading, clearing, filling, or other earth change which may result in: 1. The movement of more than 10,000 square feet of earth; or 2. Any activity that changes the existing or natural contour of the land which changes drainage. Land disturbing activity on a property located within the boundaries of the Lower Minnesota River Watershed District shall mean any change of the land surface to include removing vegetative cover; excavating, filling, grading, stockpiling soil; and constructing any structure that may cause or contribute to eroding or moving sediment into water bodies. For purposes of this section, excavation or grading for agricultural purposes on agriculturally zoned property shall not constitute land disturbing activity provided such activity is no closer to an edge or delineated boundary of any water body than as set forth in the wetlands protection and management regulations in this Code. Land disturbance plan (LDP) means the plan as required to be submitted with a permit application under this section consisting of the information and supporting documentation as set forth herein. Linear project means construction or reconstruction of roads, trails, sidewalks, alleys, and rail lines that are not part of a common plan of development. Mill, overlay, reclaiming and other resurfacing projects are not considered to be reconstruction. MIDS means the Minimum Impact Design Standards published by the Minnesota Pollution Control Agency and for purposes of this section, those provisions pertaining to stormwater volume reduction requirements. MIDS calculator means the Minimum Impact Design Standards (MIDS) best management practice (BMP) calculator for determining conformance with the MIDS/City of Eagan Stormwater Volume Reduction Performance Goals. Minnesota Pollution Control Agency (MPCA) means the state agency charged with overseeing and enforcing the federal Clean Water Act. Minnesota Stormwater Manual means the most current version of the Minnesota Pollution Control Agency's Minnesota Stormwater Manual. National Pollutant Discharge Elimination System (NPDES) means the federal program pursuant to the Clean Water Act that regulates the discharge of pollutants to waters of the state through the issuance, regulation and enforcement of NPDES permits under the Clean Water Act. New building construction means the construction of any principal building or structure upon a parcel of land or platted lot that is not existing or otherwise being enlarged or improved. New development means the process whereby land that has less than 15 percent impervious surface is or proposed to be improved with buildings and uses in one continuous process or in more than one distinct phase, including but not limited to the following activities: initial site grading; installation of utilities; construction of public streets; construction or grading of drainage ways; other grading or filling of any area within the site; grading of building pad areas; utility hookups; construction of buildings, parking lots, driveways, storage areas, recreation areas, or private streets; and any other construction or land disturbing activity within the subject property or site. Land that was previously developed, but now razed and vacant, will not be considered new development and will constitute redevelopment. NPDES construction stormwater permit means the permit issued by the MPCA which is officially called General Permit Authorization to Discharge Storm Water Associated with Construction Activity under the National Pollutant Discharge Elimination System/State Disposal System Permit Program (NPDES). Ordinary high water level (OHWL) means an elevation associated with a water body determined by the DNR, and used to determine DNR jurisdiction. In general, it is the elevation delineating the highest water level which has been maintained for a sufficient period of time to leave evidence upon the landscape. The ordinary high water level is commonly that point where the natural vegetation changes from predominantly aquatic to predominantly terrestrial. For watercourses, the OHW is typically the elevation of the top of the bank of the channel. The OHW does not correlate to a one percent probability storm event (100-year), two percent storm event (50-year), ten percent storm event (10-year), or any other flood level. Owner means the person or entity that is the fee owner of record of the land on which the construction activities will occur; or if the construction activity is for a lease, easement, or mineral rights license holder, the party or individual identified as the lease, easement or mineral rights license holder; or the contracting government agency responsible for the construction activity. Permanent erosion control means long-term method(s) employed and maintained to prevent erosion and sedimentation. Examples of permanent controls are turf reinforcement mats, swales, ponds, sediment basins, infiltration basins, catch basin sumps, storm sewer systems, and riprap. Permanent cover means final stabilization. Examples include perennial grass, gravel, asphalt, and concrete. See also the definition of final stabilization. Permanent cover does not include the practices under temporary erosion protection. Pre-development means land conditions prior to the creation of any impervious surface on the property. Project manager means the applicant or the applicant's duly authorized representative who has been conferred the duties by the applicant to implement, complete and manage the project to which the approved land disturbance and erosion control plan applies under this section. Redevelopment means the process of subdividing and adding additional uses on a lot or site that was previously developed and/or the razing and replacement of existing building and/or changes in uses on a lot or site that was previously developed. Land that was previously developed, then razed and left vacant before new building construction occurs is deemed redevelopment. Runoff means rainfall, snowmelt, dewatering or irrigation water flowing over the ground surface. Sediment means the product of an erosion process; solid material both mineral and organic, that is in suspension, is being transported, or has been moved by water, wind, or ice, and has come to rest on the earth's surface either above or below water level. Sedimentation means the process or action of depositing sediment. Sediment control means the methods employed to prevent sediment from leaving a site. Examples of sediment control practices are silt fences, sediment traps, earth dikes, drainage swales, check dams, subsurface drains, pipe slope drains, storm drain inlet protection, and temporary or permanent sedimentation basins. Significant tree means any of the following type of trees, as each is defined herein: Coniferous/evergreen tree shall mean a woody plant which, at maturity, is at least 12 feet or more in height, having foliage on the outermost portion of the branches year-round. Deciduous tree shall mean a woody plant which, at maturity, is at least 15 feet or more in height, having a defined crown, and which sheds leaves annually. Significant tree shall mean a healthy tree measuring a minimum of six inches in diameter for hardwood deciduous trees, defined herein, or a minimum of 12 inches in diameter for softwood deciduous trees as defined herein; or a minimum of 12 feet in height for coniferous/evergreen trees. Hardwood deciduous tree shall include: ironwood, catalpa, oak, maple (hard), walnut, ash, hickory, birch, black cherry, hackberry, locust and basswood. Softwood deciduous tree shall include: cottonwood, poplars/aspen, box elder, willow, silver maple and elm. Specimen tree shall mean a healthy hardwood deciduous tree measuring equal to or greater than 30 inches diameter and/or a coniferous tree measuring 50 feet or greater in height. Significant woodland means a group or cluster of coniferous and/or deciduous trees with contiguous crown cover, occupying 500 or more square feet of property, which are comprised of deciduous trees between four inches and 12 inches in diameter or coniferous trees between four feet and 12 feet in height. Site means any lot or parcel of land, or contiguous lots or parcels of land, where land disturbing activity is proposed to or permitted to be occurring. Slope means an inclined ground surface the inclination of which is expressed as a ratio of horizontal distance to vertical distance. Soil means the unconsolidated mineral or organic material on the immediate surface of the earth. For the purposes of this section, temporary stockpiles of clean sand, gravel, aggregate, concrete or bituminous materials are not considered soil. Soil management strategies means a site-specific integrated plan for protecting soils from disturbance and procedures to remediate soil compaction and improve organic matter content on disturbed soils, to preserve/improve soil quality and to provide effective stormwater infiltration as approved by the city engineer in accordance with the City of Eagan's Stormwater Design Guide. Stabilized means the exposed ground surface has been covered by appropriate materials such as mulch, staked sod, riprap, erosion control blanket, mats or other material that prevents erosion from occurring. Applying mulch, hydromulch, tackifier, polyacrylamide or similar erosion prevention practices is not acceptable stabilization in temporary or permanent drainage ditches or areas where concentrated overland flow occurs. Grass seeding is not stabilization. Steep slopes mean the topography on the site has an average slope over 12 percent, as measured over horizontal distances of 50 feet or more. Stormwater means precipitation runoff, stormwater runoff, snow melt runoff, and any other surface runoff and drainage. Stormwater management plan means a set of drawings and other documents submitted as part of a land disturbance plan, as a prerequisite to obtaining permit approval hereunder, which shall contain all of the information and specifications pertaining to land disturbance erosion prevention and control management and post-construction stormwater management in conformance with this section. Stormwater pollution prevention program (SWPPP) means a plan for stormwater discharge that includes all required content in conformance with this section and which describes erosion prevention BMPs, sediment control BMPs, construction site/waste control BMPs and Permanent Stormwater Management Systems that, when implemented, will decrease soil erosion on a parcel of land and decrease off-site nonpoint pollution. Structural control elevation (SCE) means the elevation of the outlet structure, pump controls or surface overflow for a water body at which water will initially discharge from the water body. This elevation would correspond to the elevation of the water surface at the time of initial discharge. Surface water or waters means all streams, lakes, ponds, marshes, wetlands, reservoirs, springs, rivers, drainage systems, waterways, watercourses, and irrigation systems whether natural or artificial, public or private. Temporary stabilization means the employment of non-permanent erosion control practices to prevent the erosion and mobilization of disturbed, exposed soils, including soil stockpiles, prior to and during all construction activity until final stabilization is completed. Temporary stabilization BMPs include, but are not limited to, wood mulch, hydraulically applied tackifiers/mulches, erosion control blankets, sediment logs, silt fencing, or other materials that temporarily prevent soil erosion from occurring. Covering the soil with exclusively grass seed is not acceptable temporary stabilization. Water body (bodies) means any natural or man-made wetland, drainage or stormwater area, stream, or lake. Water quality volume means runoff from the new impervious surfaces created by a project and is the volume of water to be treated in the permanent stormwater management system. Wetlands shall have the meaning as defined in Minnesota Rules 7050.0130, subpart F, and includes those areas that are inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs, and similar areas. Constructed wetlands designed for wastewater treatment are not waters of the state. Wetlands must have the following attributes: 1. A predominance of hydric soils; 2. Inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support a prevalence of hydrophytic vegetation typically adapted for life in a saturated soil condition; and 3. Under normal circumstances support a prevalence of such vegetation. Wetland buffer has the meaning as provided in the wetlands protection and management regulations set forth in the land use regulations of this Code. D. Permit application and plan. 1. Permit application. An application for the permit required hereunder shall be made in writing to the city on such form as the city may, from time to time, designate and shall include such information as the city shall require. If the project is for a subdivision, new development, redevelopment, or other project that requires approval by the city council under this Code, then the application for such project may be in lieu of a permit application under this section, provided the applicant provides all information and complies with all regulations required hereunder. 2. Permit application submittals. Any application for a permit required hereunder, other than a permit for outdoor storage of de-icing material which is regulated elsewhere in this section, shall be submitted to the city, along with all required application fees and a land disturbance plan (LDP) prior to the city's consideration of the application. The LDP shall comply with the following requirements, in addition to those LDP requirements set forth elsewhere in this section: a. A detailed description, along with a grading plan if applicable, of the land disturbing activity for which the permit is sought. b. The plan shall be prepared by a certified plan preparer or inspector as approved by the city. c. The plan shall be consistent with any previously approved subdivision grading plan. d. The plan shall comply with the requirements for erosion and sediment controls and construction debris/waste controls within the NPDES construction stormwater permit issued by the MPCA. e. The plan shall depict the proposed permanent/post-construction stormwater management methods/facilities and shall comply with the city's post-construction stormwater management regulations set forth herein and shall be consistent with the city's overall stormwater management plan and water quality and wetland management plans. f. The plan shall not adversely impact neighboring properties. g. The plan shall minimize any irreparable adverse impacts to natural resources upon the subject property or directly adjacent thereto, as well as any city facilities or stormwater system. h. The plan shall meet all requirements of this section. i. The plan shall provide for and include any of the following temporary erosion and sediment control requirements if the city determines that the project mandates all, or a combination thereof, for the protection of public safety, health and welfare: (1) Properly fence any slope of 3:1 or greater that is adjacent to a project property line and which is deemed hazardous or dangerous by the city; (2) Slope the banks, fill, level off any depression or mound or otherwise place in such condition at any time so as not to be dangerous because of sliding or caving banks; and so as to minimize or stop erosion or dust during or after the grading operation; and (3) Properly drain, fill, or level off any graded or ungraded area so as to make the same safe and healthful, unless otherwise approved by the city. 3. Review and approval of permit application. Projects of less than five acres on platted lots of record and that are not required to be approved by city council, such as a subdivision or new development, may be approved administratively by city staff, unless city staff presents it to the city council for its review and approval. Upon a finding that the proposed project plan meets the requirements under this section and after city's approval of the land disturbance plan, the city will issue a permit in accordance with the provisions of this section. 4. Expiration of permit and plan. Any permit issued pursuant to the requirements of this section, including any grading permit issued in lieu thereof, shall expire two years from the date of issuance if significant progress of the work covered by the permit is not satisfactorily accomplished as determined by the city, unless an extension of the permit is requested by the applicant prior to expiration and approved by the city. 5. Revocation of permit. Failure to comply with the approved terms and conditions of the permit or the land disturbance plan approved therewith shall be grounds for revocation of the permit, or any other permit or approval by the city council issued in lieu thereof, following a public hearing. Written notification of the public hearing shall be mailed to the current holder of the permit at least ten days prior to said hearing. E. Land disturbance plan. 1. No permit shall be issued unless a land disturbance plan is submitted to and approved by the city. All land disturbance plans shall include the following: a. General information. (1) Delineation of the subject property, including all public and private easements thereon; the location of existing and proposed buildings, structures and impervious surfaces on the subject property, including quantities of impervious surface for both pre- and post-construction/activity, and the building bench elevations for all existing and proposed buildings; (2) Description of the construction or land disturbing activity to be performed on subject property, including the area and volume of earth material to be moved, and proposed project schedule; (3) Identification of all water bodies located on and within 100 feet of the subject property's boundaries, including identification of any off-site receiving waters for the permit site's runoff, including the structural control elevation (SCE), high water level (HWL), and ordinary high water level (OHWL) elevations and if an existing water body is intended to be used for water quality treatment, then identification of the dead storage volume and area of the SCE; (4) Identification of all wetland buffers as set forth in the wetlands protection and management regulations in this Code; (5) Identification of existing and proposed subwatersheds/site drainage areas, including any contributing runoff from off-site, and show drainage patterns using arrows depicting direction of flow; (6) Topographical data, including existing (dashed) and proposed (solid) contours at vertical intervals of not more than two feet, except that contour lines shall be no more than 100 feet apart; (7) Temporary benchmarks shall be established within the boundaries of the project area. Descriptions, reference ties and elevations of the benchmarks shall be furnished to the city. All elevations, topography and vertical control data shall be tied to sea level datum, using current GIS standards datum; and (8) The location and size of all existing and proposed sanitary sewer, storm sewer, water supply, and other utility service facilities. b. Stormwater pollution prevention plan (SWPPP): (1) Delineation, including the measurement of the areas based on the appropriate unit of measurement, of all areas to be graded or excavated, and the limits of land disturbing activities. (2) All erosion and sediment control, construction debris/waste control and stormwater management shall conform to City Code and Engineering Standards Manual, and if applicable the current requirements of the NPDES construction stormwater permit issued by the MPCA. (3) The SWPPP shall be prepared by an individual who has received training by an accredited governmental agency, professional organization, or educational institution for and has working knowledge and experience in erosion prevention, sediment control, permanent stormwater management and the MN NPDES/SDS Construction Stormwater Permit. This individual shall sign the SWPPP with a certification statement that the individual meets the requirement of this clause. (4) The following general criteria shall be incorporated in site design for erosion and sediment control and construction site construction debris/waste control in the stormwater pollution prevention plan (SWPPP): (i) Minimize disturbance of natural soil cover and vegetation; (ii) Minimize, in area and duration, exposed soil and unstable soil conditions; (iii) Protect receiving water bodies, wetlands and storm sewer inlets; (iv) Protect adjacent properties from sediment deposition; (v) Minimize work in and adjacent to waterbodies and wetlands; (vi) Minimize off-site sediment transport on trucks and equipment; (vii) Maintain stable slopes; (viii) Avoid steep slopes and the need for high cuts and fills; (ix) Minimize disturbance to the surrounding soils, root systems and trunks of trees adjacent to site activity that are intended to be left standing; and (x) Minimize the compaction of site soils. (5) Identification and use of specific BMPs for erosion and sedimentation control and construction debris/waste control to minimize erosion and the discharge of sediment and other pollutants within and from the property, during construction activity and for final stabilization as required in the City of Eagan Stormwater Design Guide within the Engineering Standards Manual and City of Eagan Standard Detail Plates, as recommended by the Minnesota Pollution Control Agency in its online Minnesota Stormwater Manual, and if applicable the current requirements of the NPDES construction stormwater permit issued by the MPCA including but not limited to: (i) Perimeter erosion control devices; (ii) Phased grading; (iii) Temporary seeding; (iv) Storm drain inlet protection devices; (v) Rock construction entrance; (vi) Critical root zone perimeter protection for trees; (vii) Construction site management direction, such as removal of all construction debris/waste, dirt and soil from impervious ground surfaces (sweeping schedule, etc.), including abutting public or private roadways and sidewalks, etc., in connection with the subject property, to be properly disposed of and not allowed to be carried by runoff into a receiving channel of the stormwater system; (viii) Identification of soil storage/stock pile protection measures, including phasing of stockpile from temporary to permanent BMPs; (ix) Identification of flow diversions and temporary sediment basins (including drainage area and sizing); (x) Dust control measures; (xi) Identification of BMPs for dewatering activities, including any specific chemicals or chemical treatment systems that may be used for removing sediment from dewatering on the site, including discharge details to prevent erosion and any adverse effect on natural or off-site receiving waters and/or downstream properties. The appropriation of these BMPs and discharge may require additional local, state or federal permits; (xii) Identification and description of all permanent BMPs to be utilized, including the combined use of soil decompaction/soil amendment/perennial vegetative cover, on all exposed soils or other equivalent means and a completion schedule from pre-grading through final stabilization; (xiii) Identification of all permanent/post-construction stormwater management BMPs to be utilized to protect water bodies and wetland buffers, and described in the stormwater management plan; (xiv) Any other erosion and sedimentation control and construction debris/waste control device or practice as deemed necessary by the city. (xv) Identification and description of all temporary stabilization BMPs to be utilized, and all application methods shall meet current Minnesota Department of Transportation (MNDOT) erosion control standards and specifications. (6) Supporting information including designs, calculations/quantification and narrative pertaining to BMPs for erosion and sediment control, construction debris/waste control, temporary and permanent/post-construction stormwater management. (7) Applicant shall identify the responsible party for SWPPP implementation, maintenance, inspection during land disturbing activity. (8) Identification of responsible party for long-term operation and maintenance of the permanent stormwater management system. (9) Description of BMP inspection schedule by responsible party, including but not limited to: (i) At least once every seven days on exposed soil areas during active construction; (ii) Within 24 hours after a rainfall event of greater than one-half inch in 24 hours; (iii) Once every 30 days on stabilized areas; and (iv) As soon as runoff occurs or prior to resuming construction on frozen ground. (10) Description of BMP maintenance schedule by responsible party, including but not limited to: (i) When sediment reaches one-third the height of the BMP on perimeter control devices, sediment must be removed within 24 hours. (ii) If the perimeter control device is not functional it must be repaired, replaced or supplemented within 24 hours. (iii) Temporary sediment basins shall be maintained when sediment reaches one-half the outlet height or one-half the basin storage volume. Basin must be drained or sediment removed within 72 hours. (iv) Sediment tracked or eroded from construction site vehicle entrance and exit locations must be removed from paved surfaces within 24 hours of discovery, or within a shorter time period if the sediment poses a safety hazard on the public streets. (11) Description of schedule for completing stabilization of all exposed soil areas, soil stockpiles, temporary or permanent ditches or swales that are to be used as a sediment containment system during construction, and temporary or permanent energy dissipation at all pipe outlets as required in the current NPDES construction stormwater permit. (12) If the project consists of grading and construction activity that results in land disturbance of equal to or greater than one acre, then the plan shall identify all requirements under its NPDES construction stormwater permit issued by the MPCA and the Minnesota Stormwater Manual which shall be in addition all the requirements set forth in this section. (13) NPDES construction stormwater permit documentation. In addition to all other plan requirements in this section, the applicant shall submit to the city prior to the issuance of a permit hereunder, a copy of the applicant's NPDES construction stormwater permit issued by the MPCA and any other supporting documentation, if a NPDES construction stormwater permit is applicable. (14) For individual lots on which residential construction occurs, the applicant shall identify if: (a) the homebuilder/contractor is to complete the final stabilization as required herein; or (b) if the homebuilder/contractor is to install only the temporary stabilization as defined herein, including perimeter erosion and sediment controls prior to occupancy of the home by the homeowner and the home/property owner is to complete the installation of permanent stabilization measures for final stabilization as required herein. c. Tree preservation plan. The tree preservation regulations set forth in chapter 11 of this Code are incorporated herein and compliance with the tree preservation plan requirements shall be met. (1) An accurate inventory of all individual significant trees on the subject property, including identification of the size, species, condition and location of each significant tree. On large wooded sites, forest measuring methods may be used to determine the total square footage of significant woodland. For woodland inventories provide a brief description of tree species and average tree diameters. (2) Identification of all individual significant trees or significant woodlands on the subject property proposed to be removed as a result of the land disturbing activity; (3) Identification of measures to be utilized to protect and preserve the significant trees or significant woodlands proposed to be preserved, defined as the following: (i) Protective fencing shall be placed at the outer edge of the critical root zone of all significant trees or significant woodlands. No grade change, trenching, stockpiling, soil compaction or any other construction activity shall occur within this protected zone; and (ii) To prevent oak wilt infection, a non-toxic tree wound sealant shall be applied immediately to any damaged tree trunk, branch, or root of any oak tree between and including April 15 and July 1. F. Post-construction stormwater management requirements. In connection with any project for which a permit is required under this section that results in the addition of 10,000 square feet or more of new or fully reconstructed impervious surface on the site, the following post-construction/activity stormwater management requirements shall be met on the site: 1. Stormwater volume control. a. New, nonlinear developments. For a new, nonlinear development that creates 10,000 square feet or more of new impervious surface on sites without infiltration restrictions, stormwater runoff volumes shall be controlled and the post-construction runoff volume shall be retained on the site for 1.1 inches of runoff from impervious surfaces, (i.e., the volume retained shall be 1.1 inches times the impervious surface without any abstractions/losses). b. Redevelopment/reconstruction projects. Nonlinear redevelopment projects on sites without infiltration restrictions that create 10,000 square feet or more of new and/or fully reconstructed impervious surfaces shall capture and retain on site 1.1 inches of runoff from new and/or fully reconstructed impervious surfaces. c. Linear projects. Linear projects (roadways, sidewalks, and trails) without infiltration restrictions and not part of another project that creates 10,000 square feet or more of new and/or fully reconstructed impervious surfaces shall capture and retain the larger of the following: (1) 0.55 inches of runoff from the new and/or fully reconstructed impervious surfaces; or (2) 1.1 inches of runoff from the net increase in impervious area. For linear projects where the lack of right-of-way precludes the installation of volume control practices that meet the conditions for post-construction stormwater management in this section, and a reasonable attempt has been made to obtain right-of-way during the project planning process, the applicant shall follow the flexible treatment options schedule. d. Pretreatment shall be provided for all volume control and water quality treatment BMPs. Pretreatment structures for coarse sediment removal will not receive a nutrient removal credit towards water quality requirements. e. No areas of constructed wet ponds or wetlands shall be accepted as an infiltration practice. f. Impervious surface area for calculating post-construction volume control requirement shall include all disturbed/graded soil areas that are proposed to be revegetated pervious surfaces, due to soil compaction impacts from land disturbance. Identification of soil management strategies to be utilized, within a stormwater management plan and site plans, may provide exclusion to this disturbed pervious provision for areas shown to protect and restore soil permeability to non-compacted soil conditions, if approved by the city engineer. g. Acceptable credit calculator and/or modeling. Final site design and choice of stormwater treatment practices shall be based on outcomes of the MIDS calculator, or other water quality modeling as accepted by the city, to demonstrate compliance with the volume control performance goals, as part of a stormwater management plan. h. Reference design guide. All volume control for water quality and quantity and site design specifications shall conform to the current versions of the MPCA Minnesota Stormwater Manual and the city stormwater design guide. 2. Permissible alternative stormwater volume control designs. a. The city may consider and permit alternative stormwater management designs if the city, in its sole conclusion, determines that the applicant cannot fully meet the requirements as set forth in this section, due to infiltration restrictions. Before the city will consider any alternative design, the applicant shall demonstrate that it cannot fully comply with the standards herein. The city will consider the merits of relocating project elements to address varying soil conditions and other constraints across the site. Applicant shall document the alternative design options sequence starting with alternative #1. If alternative #1 cannot be met, then alternative #2 shall be analyzed. Applicant must document the specific reasons why alternative #1 cannot be met based on the infiltration restriction factors listed below. If alternative #2 cannot be met then alternative #3 shall be met. Applicant must document the specific reasons why alternative #2 cannot be met based on the infiltration restriction factors listed below. When all of the conditions are fulfilled within an alternative, this sequence is completed. Volume reduction techniques considered in determining alternative designs shall include infiltration, reuse and rainwater harvesting, and/or additional techniques included in the MIDS calculator, the Minnesota Stormwater Manual, or the city stormwater design guide. Higher priority shall be given to BMPs that include volume reduction. Secondary preference is to employ filtration techniques, followed by rate control BMPs. b. The use of infiltration as a stormwater management method is prohibited when the infiltration device would be constructed in any of the following areas: (1) Where industrial facilities are not authorized to infiltrate industrial stormwater under an NPDES/SDS industrial stormwater permit issued by the MPCA, including but not limited to: automobile salvage yards, scrap recycling and waste recycling facilities, hazardous waste treatment, storage, or disposal facilities, and air transportation facilities that conduct deicing activities; (2) Where vehicle fueling and maintenance occur, regardless of the amount of new and/or redeveloped impervious surface; (3) With less than three feet of separation distance from the bottom of the infiltration system to the elevation of the seasonally saturated soils or to the top of bedrock; (4) Where high levels of contaminants in soil or groundwater will be mobilized by the infiltrating stormwater (the property owner or operators of the construction activity shall complete the MNPCA's site screening assessment checklist, which is available in the Minnesota Stormwater Manual, or conduct their own assessment at their sole cost to determine if this factor exists and a copy of the assessment will be retained by the city as part of the project records); (5) Within an emergency response area (ERA) of any drinking water supply management area (DWSMA); (6) Outside an ERA of a DWSMA classified as moderate vulnerability, unless the applicant has performed a higher level of engineering review sufficient to provide a functioning treatment system and to prevent adverse impacts to groundwater 1 ; [2] (7) Where soil infiltration rates are more than 8.3 inches per hour, unless soils are amended to slow the infiltration rate to less than 8.3 inches per hour; (8) Within 1,000 feet up-gradient, or 100 feet down-gradient of active karst features; or (9) Within soils that are predominantly hydrologic soil group D (clay) 2 . [3] c. The alternative stormwater management design options sequence is as follows: Alternative #1: Applicant must first attempt to design the site to achieve retention of at least 0.55 inches of runoff from the proposed impervious surfaces and remove 75 percent of the annual total phosphorus load leaving all points of the site. Options considered and presented shall examine the merits of relocating project elements to address varying soil conditions and other constraints across the site. Alternative #2: If the applicant cannot achieve the standards listed in alternative #1, the project shall achieve volume reduction to the maximum extent practicable and remove 75 percent of the annual total phosphorus load leaving all points on the site. Options considered and presented shall examine the merits of relocating project elements to address varying soil conditions and other constraints across the site. Alternative #3: Off-site treatment. Mitigation equivalent to the performance of 1.1 inches of volume reduction for new development or redevelopment as described in this section performed off-site to protect the receiving water body may be considered/accepted by the city on a case-by-case basis. Off-site treatment shall be achieved in areas selected, and if approved by the city, in the following order of priority: (1) Locations that yield benefits to the same receiving water that receives runoff from the original construction activity. (2) Locations within the same sub watershed as the original construction activity. (3) Locations within the same major drainage district or watershed as the original construction activity. (4) Locations anywhere within the city. 3. Runoff rate control. All on-site rate-control stormwater facilities required under this section shall be designed, installed, and maintained to accomplish the following: a. Maintain predevelopment peak runoff rates for the 50 percent probability, 24-hour storm event. b. Maintain predevelopment peak runoff rates for the ten percent probability, 24-hour storm event. At a minimum, the storm sewer system shall be designed for the ten percent, 24-hour storm event. Low areas must have an acceptable overland drainage route with the required transfer capacity when the event is exceeded. c. Maintain predevelopment peak runoff rates for the one percent probability, 24-hour storm event. d. Where the city's stormwater management plan and its updates show lower rates for the 50 percent, ten percent, or one percent events, this lower rate shall supersede the predevelopment rate control criteria. All storm events calculations shall be modeled according to the most current version of the National Oceanic and Atmospheric Administration's (NOAA) National Weather Service Atlas 14, using rainfall events applicable to the city. All runoff calculations shall be according to the methodology described in the Natural Resources Conservation Service's Technical Release 55, "Urban Hydrology for Small Watersheds" (commonly referred to as TR-55). Other methodology may be used with prior approval by the city. Curve numbers for each land use shall be chosen based on TR-55, except that under no circumstances shall predevelopment pre-project conditions exceed a curve number of 72. The city retains the right to review the appropriateness of the curve number applied to a property. e. For post-construction rate control modeling a minimum curve number of 84 shall be used on all disturbed/graded soil areas that are proposed to be revegetated pervious surfaces, due to soil compaction impacts from land disturbance. Identification of soil management strategies to be utilized, within a stormwater management plan and site plans, may provide justification for use of a lower curve number for pervious areas if shown to protect or restore soil permeability to non-compacted soil conditions, if approved by the city engineer. f. All rate control practice designs shall conform to the current versions of the MPCA Minnesota Stormwater Manual and the city stormwater design guide (e.g., pond design standards including maximum side slopes, maintenance bench, safety bench, unobstructed equipment access, etc.). g. On-site rate control practices may not be needed if the applicant is able to clearly demonstrate that off-site (regional) constructed facilities can detain/retain the project site's runoff rates to pre-development conditions and in accordance with the rates established in this Code. In this case, the applicant shall submit a technical evaluation completed by a qualified engineer or hydrologist which must be reviewed and approved by the city engineer. 4. Flood and erosion control. No land shall be developed or no use shall be permitted that results in water runoff causing flooding (drainage in excess of the natural drainage anticipated by the city stormwater management plan) or erosion or sedimentation on adjacent property. 5. Use of natural topography and better site design techniques. The applicant shall reduce the need for stormwater management infrastructure/facilities, public or private, by utilizing natural topography and land cover such as swales and depressions that exist before development to the degree they can accommodate the additional flow of water without compromising the integrity or quality of a receiving water body. Development or redevelopment shall minimize impact to significant natural features. Projects shall be designed using the Better Site Design Techniques of the current version of the Minnesota Stormwater Manual. Better Site Design involves techniques applied early in the design process to preserve natural areas, reduce impervious cover, distribute runoff and use pervious areas to more effectively treat stormwater runoff. Site design should address open space protection, impervious cover minimization, runoff distribution and minimization, and runoff utilization. G. Oil and grease control. The first 1.1 inches of runoff shall be treated using effective oil and grease removal technology. Site must provide oil and grease control when the site has 40 or more parking stalls, has high traffic areas (such as drive thru windows/lanes), or commercial/business activities will take place that have the potential for oil and/or grease pollution (e.g., gas/service stations). H. Outlets. Stormwater discharges from new construction project sites shall have a stable outlet capable of carrying stormwater flow at a non-erosive velocity. The outlet shall be designed considering flow capacity and flow duration. The outlet design requirement applies to both the discharge outlet from the construction site, as well as the discharge outlet into the municipal storm sewer system or water body. I. Maintenance of private stormwater facilities. Property owners shall maintain all private stormwater facilities that have been installed in accordance with this section in proper and operational condition consistent with the performance standards under which they were originally designed and pursuant to the terms of the city's approval of the facility(s), in addition to the following: 1. On an annual basis, unless the city requires more frequency, the property owners shall: (a) have the private stormwater facility(s) inspected by a qualified person with demonstrated experience in construction and maintenance of stormwater infiltration practices, to determine the facility is properly maintained and in operational condition consistent with the performance standards for which it was originally designed and approved by the city; and (b) inspect and remove and properly dispose of all settled materials, including all settled solids, from sumps, grit chambers, and other devices within all private stormwater facilities, in accordance with federal, state, and local regulations. The city may grant one- to five-year waivers from this requirement after the property owner presents evidence that a facility has the capacity to store settled solids in accordance with the original design capacity. 2. When requested by the city, property owners shall provide a maintenance plan that defines who will conduct the maintenance, the type of maintenance that will be conducted, and the maintenance intervals of a private stormwater facility. 3. All private stormwater facilities shall be designed to minimize the need for maintenance and to provide easy vehicle and personnel access for maintenance purposes, and shall be structurally sound, as determined by the city. Prior to city approval, it shall be the responsibility of the applicant to obtain any necessary easements or other property interests to allow access to the facilities for inspection or maintenance. 4. The city shall have the right to request and review inspection and maintenance records and shall have the right to perform an inspection of private stormwater facilities at any time if the city has probable cause to believe that the facilities are not being properly maintained or inspected., to ensure continued operation of the facilities in accordance with the design and maintenance plans. 5. If the site is subject to subsequent land disturbing activity or building construction or stormwater treatment facilities change, causing decreased effectiveness of the stormwater treatment, new or modified structural stormwater BMPs must be implemented to achieve compliance with the performance standards and requirements of this section. 6. Prior to the issuance of a permit hereunder, the property owner shall execute a stormwater management system agreement governing the implementation, inspection and maintenance of the stormwater management facilities required and approved by the city under this section. The fully executed agreement shall be recorded with the county recorder's office, at the property owner's sole expense, within 30 days of the issuance of the permit. J. Enforcement. 1. Whenever the city finds that a person has violated a provision or failed to meet a requirement of this section, the city may order compliance upon providing written notice of violation to the applicant or responsible person if designated by the applicant on the permit application form. 2. If abatement of a violation and/or restoration of affected property are required, the notice shall set forth a deadline within which such abatement and/or restoration must be completed. Said notice shall further advise that, should the violator fail to abate or restore the property within the established deadline, the work will be done by a designated governmental agency or a third party contractor and the expense thereof shall be charged to the violator. 3. If the violator fails to pay for said services within 30 days of the notice of the amount due, the city may draw the amount owed for the services from any financial guarantees the city may hold with regard to the affected property. On or before the first day of September of each year, the city clerk shall list the total unpaid charges for abatement and/or restoration services against each separate lot or parcel to which they are attributable under this article. 4. Every person violates a requirement, subdivision, paragraph or provision of this section when he fails to perform an act as required hereunder, or performs an act thereby prohibited or declared unlawful and, upon conviction thereof, shall be guilty of a misdemeanor and sentenced in accordance therewith except as otherwise stated in specific provisions hereof. K. Appeals of decisions. The applicant may appeal any requirement, decision or determination by the city in connection with any provision of this section pursuant to the procedures as set forth in the zoning regulations regarding board of appeals and adjustments. L. Exemptions. The provisions of this section shall not apply to: 1. Emergency work necessary to protect life, limb, or property. 2. Routine agricultural activity such as tilling, planting, harvesting, and associated activities. Other agricultural activities are not exempt including activities such as feedlots, storage sheds, and construction of structures. 3. Silvicultural activity. 4. Public utility and right-of-way installation and maintenance projects, which are regulated elsewhere in the City Code; 5. Stockpiles: 1) clean aggregate stockpiles, 2) sand stockpiles, 3) constructed base components of roads, parking lots, 4) demolition concrete. Stockpiles must still be compliant with sediment control practices. M. Compliance with plan. 1. Compliance required. The applicant shall implement and comply with the land disturbance plan (LDP) prior to and during any construction or land disturbing activity under the grading permit to which this section applies. All erosion and sedimentation control and tree preservation measures required under the plan shall be properly installed and remain in place until all grading and construction activity is completed and final stabilization has occurred or until a written request for removal of the protection measures is made to and approved by the city. Permanent erosion control and stormwater management shall remain in place after construction, and shall be under a long-term maintenance agreement which must be signed by the applicant before a grading permit is issued. The applicant/owner shall be responsible for inspections and maintenance of temporary and permanent BMPs on the site. No construction or land disturbing activity to which this section applies or removal of any significant trees may occur until the LDP is approved by the city and except in accordance with the approved LDP. Failure to comply with the approved terms and conditions of an LDP shall constitute a violation of this Code. To remain in compliance the applicant must amend the SWPPP as necessary to include additional or modified BMPs designed to correct problems identified or address erosion, sedimentation and/or construction debris/waste control issues, and shall keep all site plans (and Stormwater Management Plan documentation) up to date with regard to stormwater runoff controls, which shall be provided to the city. 2. Determination of compliance. The city shall have the right to enter and inspect the subject property in order to determine compliance with the approved LDP. The city shall have the right to order the suspension of any grading or construction activity on the subject property until compliance with the LDP has occurred. 3. Finding of noncompliance. Upon a finding of noncompliance, the city shall use the following procedure with respect to notification and corrective measures: (a) The city shall serve upon the project manager and/or operator, or other responsible person, and the applicant/property owner, if different than the project manager and/or operator, by U.S. mail a written notification of the violation of the approved LDP. The written notification may also be served by electronic mail ("email") if the applicant and/or project manager has authorized in writing that correspondence may be by email. (b) If remedial work is not completed and compliance with the LDP has not occurred within the deadline for compliance as provided in the violation notification, the city may complete or contract for the remedial or corrective work and any costs incurred in connection with taking remedial action or installing corrective measures may be recovered from the applicant as allowed by law. In the alternative, the city may choose to issue a stop work order, withhold the scheduling of inspections, and/or the issuance of a certificate of occupancy, or revoke any construction-related permit and order the termination of all construction activity on the subject property until the subject site is in compliance with the LDP. N. Emergency corrective actions. In the event circumstances exist such that noncompliance poses an immediate danger to the public health, safety and welfare, as determined by the city, the city may take emergency corrective action to prevent any such danger. The city shall take reasonable action to contact and direct the owner of the subject property to take any necessary action. Any costs incurred by the city in connection with any emergency action may be assessed to the property as allowed by Minn. Stats. § 429.101. O. Conflict with other laws. If the requirements of this section are in conflict with any other federal, state or local law, the stricter requirements shall be enforced. P. Final "as-built" grade and utility plans. Upon completion of final stabilization, under a permit or other approvals issued under this section, an "as-built" grading and utility plan shall be required. This paragraph shall not apply to any single lot building permit project on a R-1, R-2 and estate zoned property not in connection with a new development and not resulting in the addition of 10,000 square feet or more of new or fully reconstructed impervious surface on the site. The "as-built" grading and utility plan shall depict the actual field grade conditions of the subject property, lot drainage patterns and locations and elevations of all surface and subsurface stormwater facilities and other utilities, and depict any changes from the original land disturbance plan submitted to and approved by the city hereunder. If building permits are requested prior to completion of the "as-built" grading and utility plan, "as-built" grading and utility plans shall be required for the individual lots associated with those building permits. All "as-built" grading and utility plans shall be signed by a professional engineer licensed by the state, certifying the "as built" plan(s) complies with the city approved plans under the permit issued hereunder and submitted to the city in a format as required by the city. Q. Tree preservation requirements. Removal or loss of significant trees shall be in accordance with the city approved LDP and the tree preservation regulations in chapter 11 of this Code. R. Fees. Fees associated with this section shall be set by a duly adopted resolution by city council. S. Performance security. 1. The applicant shall provide security for the performance of its obligations under this section. The security shall be in a form as determined and required by the city, including cash or escrow deposit or letter of credit. The security, running to the city, shall be conditioned to pay the city for any cost or expense incurred by the city to bring the site into compliance with the stormwater management permit or other approvals issued in lieu thereof under this section, including any engineering, legal or administrative expenses. The security is required to secure completion of grading, site stabilization, restoration, erosion and sediment control measures during and post construction, and installation and initial maintenance of any stormwater management facilities in accordance with the approved stormwater management plan required within City Code. 2. The security required hereunder shall be in the amount(s) duly adopted by resolution of the city council. 3. The security shall cover the installation and maintenance of erosion and sediment control measures during construction, the installation and establishment of permanent erosion and sediment control measures for post-construction, including the completion of site grading, stabilization, and restoration if the site is being graded or disturbed, and two full calendar years subsequent to the completion of the on-site stormwater management facilities as required in the approved stormwater management permit plan if stormwater management facilities are constructed. The security will be released only upon inspection and written notice of conformance by the city. T. Wetland conservation regulations. Except as otherwise provided in this Code, the Minnesota Wetland Conservation Statutes and regulations (commonly referred to collectively as the Minnesota Wetland Conservation Act), as amended through Laws 2001, are hereby incorporated herein and adopted by reference, including the penalty provisions thereof. U. Lower Minnesota River Watershed District rules. A property located within the boundaries of the Lower Minnesota River Watershed District, including its established Steep Slope Overlay District and High Value Resource Area (HVRA) Overlay District, shall be subject to the Lower Minnesota River Watershed District Rules as applicable, notwithstanding a contrary provision in this section. The Lower Minnesota River Watershed District Rules, adopted on February 19, 2020, and any amendments thereto adopted from time to time by the Lower Minnesota River Watershed District, are hereby adopted by reference as though set forth verbatim herein. A copy of the Lower Minnesota River Watershed District Rules and the district's Steep Slope Overlay District Map shall be on file in the office of the city public works department. V. Outdoor bulk storage of de-icing material or substance. 1. It is unlawful to store outdoors or within an open-air structure any de-icing material or substance that consists of five or more tons in dry form or 1,000 or more gallons in liquid form at any one time except pursuant to a stormwater management permit issued under this section and in accordance with the requirements of this provision. For purposes of this provision, an open-air structure is a structure that is not fully enclosed with all exterior sides constructed with enclosed walls and doors and a permanent impermeable roof. 2. Outdoor bulk storage of de-icing materials or substance shall be subject to the following: a. A stormwater management permit issued for outdoor bulk storage of de-icing materials or substance hereunder shall be issued for the seasonal period of November 1 through April 30 of the following year. The permit expires on April 30 at which time the containment structure shall be disassembled and either stored within a building or removed from the property, along with all de-icing materials or substance. b. All de-icing material and substance shall be stored on an impervious surface within a secure containment structure at the flattest grade level of the storage area as to keep all de-icing material or substance and potential product melt residue within the storage area. c. Any containment structure that the permit holder intends to be permanent and not removed upon the expiration of the permit shall be designed and constructed in accordance with the zoning regulations set forth chapter 11 of this Code. Any other containment structure shall be deemed temporary and allowed only during the term of the permit and is exempt from the city's zoning regulations applicable to accessory structures and outdoor storage during the term of the permit except as otherwise provided herein. d. No more than one containment area shall be permitted on a property. e. The location of the containment structure on the property shall be determined and approved by the city under the permit and shall meet all setback requirements set forth in the zoning regulations set forth in chapter 11 of this Code. The containment structure will be located in the rear of the principal building if logistically feasible. f. The containment structure shall comply with the Minnesota State Building Code and be subject to a building permit if the structure requires. g. De-icing materials and substance storage areas shall meet the following setback requirements, measured from the closest edge of the approved delineated storage area or stockpile of the de-icing material: 1. Twenty-five feet from any public or private stormwater catch basin opening or inlets; 2. Fifty feet from the ordinary high-water level of any water body or an open channel stormwater conveyance ditch; 3. One hundred feet from the ordinary high-water level of any impaired water body; and 4. Twenty-five feet from any sewer manhole, water distribution valves, or other utility structure. h. No snow storage piles on the property shall be located upslope from the de-icing material and substance storage area unless drainage bypass methods are installed to prevent snowmelt from flowing into or through the storage area. i. All de-icing material and substances shall be fully covered by either a solid roof or a waterproof impermeable, flexible cover as to prevent exposure to precipitation. Any tears, holes or damage to the roof or cover shall be repaired immediately. De-icing material and substances shall not be stored within a cargo or shipping container and cargo/shipping containers are prohibited. j. If a cover is used, the cover shall be placed over all de-icing material or substance stored at all times to prevent exposure to precipitation and surface water runoff or leachate from being generated by the stored de-icing materials or substance. k. If a cover is used, the cover shall be secured at all times, except when product is being loaded or unloaded, in a manner to ensure the cover is maintained in place during wind or precipitation events. l. Immediately upon the delivery or loading transfers of de-icing material or substance, the area surrounding the storage area or stockpile shall be swept or otherwise cleaned of uncontained de-icing material or substance. m. Releases of deicer materials or leachate contaminated with deicer materials into private or public storm system, surface waters, or stormwater treatment practices shall be reported to Eagan Water Resources within the next business day 3. Stormwater management permit application requirements. a. Contact information of snow maintenance service provider(s); b. Site plan of proposed storage location(s) depicting location of all storm catch basins and inlets, manholes, water distribution valves, or other utility structure; c. List of all deicer materials and substances to be stored with an estimate of the maximum volume(s) intended to be stored; d. Description and drawing of storage containment structures, to include: i. Materials used for containment structure (e.g., plastic tanks, concrete barriers, steel shed, etc.); ii. Dimension of the containment area and any supporting structure; iii. Surface type(s) (e.g., bituminous, concrete, etc.); and iv. Roofing/cover type(s) (e.g., tarpaulin, poly sheeting, steel sheeting, etc.). e. Description of stormwater runoff bypass(es) to be used if required. 4. Denial or revocation of stormwater management permit. A permit under this clause (V) may be revoked based upon a violation of any provision herein. A permit application may be denied if the applicant has violated this provision within the previous three years of the date of application.
(Ord. No. 535, 2nd series, § 2, eff. 2-17-2015; Ord. No. 589, 2nd series, §§ 1, 2, eff. 11-24-2020; Ord. No. 596, 2nd series, § 1, eff. 12-7-2020; Ord. No. 597, 2nd series, §§ 1—14, eff. 4-6-2021; Ord. No. 603, 2nd series, §§ 1—4, eff. 8-17-2021; Ord. No. 638, 2nd series, § 1, eff. 7-17-2025)
Ask a question about Eagan law
Corpus searches the Eagan sections it holds and shows the ones that match, with their citations. Free, no sign-in.