§ 11-101-23 — ADMINISTRATION
Lakeville, Minnesota Code of Ordinances (2026 S-14, code current through Ord. 1122, passed 4-20-2026) · Lakeville Code of Ordinances § 11-101-23
Corpus is an independent public-information project, not the official City of Lakeville website. Stable reference: corpuslaw.us/code/1bb33196-1e65-43d4-8ff7-f6c4f2f2b2b3
11-101-23: ADMINISTRATION:
A. Permit Requirements: A permit issued by the zoning administrator in conformity with the provisions of this chapter shall be secured prior to the erection, addition, modification, rehabilitation (including normal maintenance and repair), or alteration of any building, structure, or portion thereof; prior to the use or change of use of a building, structure or land; prior to the construction of a dam, fence, or on site septic system; prior to the change or extension of a nonconforming use; prior to the repair of a structure that has been damaged by flood, fire, tornado, or any other source; and prior to the placement of fill, excavation of materials, or the storage of materials or equipment within the floodplain. B. Application And Fee: A permit shall be applied for from the zoning administrator in accordance with the provisions of section 11-8-3 of this title. Said application shall be made in duplicate and shall include the following where applicable: plans in duplicate drawn to scale, showing the nature, location, dimensions, and elevations of the lot; existing or proposed structures, fill, or storage of materials; and the location of the foregoing in relation to the stream channel. The application fee amount will be in accordance with city resolution and shall be required for each use permit. C. Security: 1. Upon approval of a permit required by this chapter, the city shall be provided with financial security in accordance with section 11-9-19 of this title. 2. The financial security shall be in the amount of the city engineer's and/or city building official's estimated costs of labor and materials for the proposed improvements or development. 3. The city shall hold the security until completion of the proposed improvements or development at which time a certificate of occupancy indicating compliance with the use permit and codes and ordinances of the city may be issued by the city building official and said security released. The applicant shall be required to submit certification by a registered professional engineer, registered architect, or registered land surveyor that the finished fill and building elevations were accomplished in compliance with the provisions of this chapter. Floodproofing measures shall be certified by a registered professional engineer or registered architect. D. State And Federal Permits: Prior to granting a permit or processing an application for a conditional use permit or variance, the zoning administrator shall determine that the applicant has obtained all necessary state and federal permits. E. Certificate Of Zoning Compliance For New, Altered, Or Nonconforming Use: It shall be unlawful to use, occupy, or permit the use or occupancy of any building or premises or part thereof hereafter created, erected, changed, converted, altered, or enlarged in its use or structure until a certificate of zoning compliance shall have been issued by the zoning administrator stating that the use of the building or land conforms to the requirements of this chapter. F. Construction And Use To Be As Provided On Applications, Plans, Permits, Variances And Certificates Of Zoning Compliance: Permits, conditional use permits, or certificates of zoning compliance issued on the basis of approved plans and applications authorize only the use, arrangement, and construction set forth in such approved plans and applications, and no other use, arrangement, or construction. Any use, arrangement, or construction at variance with that authorized shall be deemed a violation of this chapter, and punishable as provided by chapter 10 of this title. G. Certification: The applicant shall be required to submit certification by a registered professional engineer, registered architect, or registered land surveyor that the finished fill and building elevations were accomplished in compliance with the provisions of this chapter. Floodproofing measures shall be certified by a registered professional engineer or registered architect. H. Record Of First Floor Elevation: The zoning administrator shall maintain a record of the elevation of the lowest floor (including basement) of all new structures and alterations or additions to existing structures in the floodplain. The zoning administrator shall also maintain a record of the elevation to which structures and/or alteration additions to structures are floodproofed. I. Notifications For Watercourse Alterations: The zoning administrator shall notify, in riverine situations, adjacent communities and the commissioner of the department of natural resources prior to the community authorizing any alteration or relocation of a watercourse. If the applicant has applied for a permit to work in the beds of public waters pursuant to Minnesota statute, chapter 103G, this shall suffice as adequate notice to the commissioner of natural resources. A copy of said notification shall also be submitted to the Chicago regional office of the federal emergency management agency (FEMA). J. Notification To FEMA When Physical Changes Increase Or Decrease The 100-Year Flood Elevation: As soon as is practicable, but not later than six (6) months after the date such supporting information becomes available, the zoning administrator shall notify the Chicago regional office of FEMA of the changes by submitting a copy of said technical or scientific data. (Ord. 883, 9-19-2011)
Ask a question about Lakeville law
Corpus searches the Lakeville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
