Sec. 9-2-5. - Permits.

(a) Required. Except as otherwise provided in this Code, no person may obstruct, excavate in or encroach upon any public right-of-way without first having obtained the appropriate permit from the city to do so. A violation of any provision of this chapter is a misdemeanor. (1) Excavation permit. An excavation permit is required by any person wishing to excavate that part of the public right-of-way described in such permit and to hinder free and open passage over the specified portion of the public right-of-way by placing facilities described therein, to the extent and for the duration specified therein. (2) Obstruction permit. An obstruction permit is required by any person wishing to hinder free and open passage over the specified portion of the public right-of-way for a period of 365 days or less by placing equipment described therein on the public right-of-way, to the extent and for the duration specified therein. An obstruction permit is required in conjunction with any excavation permit. (3) Revocable permit. A revocable permit is required by any party wishing to hinder free and open passage over the specified portion of the public right-of-way for a period of 365 days or more by any equipment, structure, landscape features or other encroachment described therein on the public right-of-way, to the extent and for the duration specified therein. (4) Small wireless facility permit. A small wireless facility permit is required by any person wishing to erect or install a wireless support structure, to collocate a small wireless facility, or to otherwise install a small wireless facility in a portion of the right-of-way as specified in the permit, provided that such permit shall remain in effect for the length of time the facility is in use, unless lawfully revoked. (b) Extensions. No permittee may excavate or obstruct the public right-of-way beyond the date specified in the permit unless the director has received and approved: (1) A supplementary application for another public right-of-way permit before the expiration of the initial permit; or (2) An application for an extension of time not to exceed 48 hours. (c) Delay penalty. In accordance with Minn. R. pt. 7819.1000, subpt. 3, and notwithstanding subsection (b) of this section, the director may establish and impose a delay penalty for unreasonable delays in public right-of-way excavation, obstruction, patching, or restoration.

(Code 1965, § 25.09; Ord. No. 4421, § 1, 1-22-2021; Ord. No. 4474, § 6, 10-17-2022)

Ask a question about Rochester law

Corpus searches the Rochester sections it holds and shows the ones that match, with their citations. Free, no sign-in.