Sec. 9-2-9. - Permit compliance.

(a) Timing. The work to be done under the excavation permit, and the patching and restoration of the public right-of-way, as required herein, must be completed within the time period specified in the permit unless an extension is granted by the director. (b) Standards. The permittee shall perform work according to the standards and with the materials specified by the city or its standards, and shall comply with Minn. R. pts. 7819.1100, 7819.5000 and 7819.5100, or this chapter, whichever is more restrictive. (c) Duty to correct defects. The permittee shall correct defects in patching or restoration performed by the permittee or its agents. Upon notification from the city, the permittee must correct all necessary restoration work using the method required by the city. This work shall be completed within ten calendar days of receipt of the city's notice, not including days during which work cannot be done because of circumstances constituting force majeure or days when the director determined that work is prohibited as unseasonable or unreasonable under this section. (d) Failure to restore. If the permittee fails to restore the public right-of-way in the manner and to the condition required by the city, or fails to satisfactorily and timely complete all restoration required by the city, the city, at its option, may perform such work. In that event, the permittee shall pay to the city, within 30 days of billing, the cost of restoring the public right-of-way. If the permittee fails to pay as required, the city may exercise its rights under any surety provided as a condition of permit issuance. (e) Compliance with other laws. Obtaining a public right-of-way permit does not relieve the permittee of its duty to obtain all other necessary permits, licenses, and authority and to pay all fees required by the city or other applicable rule, law or regulation. A permittee shall comply with all requirements of local, state and federal laws, including Minn. Stats. ch. 216D ("Gopher One Call Excavation Notice System"). A permittee shall perform all work in conformance with all applicable codes and established rules and regulations, and is responsible for all work done in the public right-of-way pursuant to its permit, regardless of who does the work.

(Code 1965, § 25.16)