Sec. 7.370. - Sidewalks.

Sidewalks shall be constructed and installed in conformance with the minimum design standards set forth in Division III of this article. The determination as to whether a sidewalk is required adjacent to a particular lot shall be made by the City, with consideration given to the recorded plat for the lot in question, adjacent recorded plats, engineering plans, water line locations, and the design standards set forth in this article. A. Responsibility for construction. 1. Where a sidewalk is required adjacent to a buildable lot, sidewalks shall be constructed by the builder prior to occupancy of any structure on that lot. 2. When a sidewalk is required adjacent to either a common area tract, or any unplatted land, or any land where no structure is intended to be built, the developer shall construct the sidewalk at the time the street is constructed. B. Escrow. Should construction or installation of the sidewalks be impossible because of weather or other conditions, the person or legal entity responsible for the construction of the sidewalk shall deposit with the City a cash sum in an amount equal to the construction cost of said sidewalk. C. Payment in lieu of sidewalk installation. 1. If the property owner feels a hardship exists that reasonably precludes the construction of a sidewalk, the property owner may submit a written request to the Director of Development Services ("Director") for payment in lieu of construction of sidewalk together with such information and studies as the Director may deem necessary to consider the request. Upon filing a complete application, this request will be reviewed and approved or denied by the Director based on the following criteria: a. The currently adopted City Capital Improvement Plan includes public improvements in the same area which would certainly result in damage, deconstruction and/or replacement of the proposed sidewalk; b. The street is generally unimproved or built to an interim standard, typically characterized without curb and gutter unless such construction was intentional and in combination with sidewalk accommodation; c. Practical barriers exist to the construction of sidewalk or reasonably obstruct sidewalk connectivity including significant slopes or space limited, grade separated, rail, waterway or freeway crossings; d. Adjacent properties have been developed without sidewalk and the nearest existing sidewalk connection to the subject property exceeds 660 feet; or e. Another jurisdiction prohibits sidewalks along their right-of-way. If the Director approves the request or such request is granted by the City Council by appeal, the property owner shall submit payment as calculated in Section B, to the City Finance Department and when such payment is received in full the sidewalk obligation for development shall be considered met. If the Director denies the request, the property owner may then appeal to the City Council through an applicable development application that requires public hearing. The City Council may consider an appeal that the denial was arbitrary and capricious and the appellant shall submit sufficient facts and evidence to establish that the Director has acted in such fashion. If the City Council finds by an affirmative vote that the Director did act in an arbitrary and capricious fashion, a payment in lieu of construction shall be allowed. 2. The payment shall be calculated as the average unit price from all bids received by the City on public works projects in the most recent preceding three calendar years in which projects were competitively bid. 3. The payment shall be held by the City of Lee's Summit Finance Department in an account for the City to use for sidewalk construction only. 4. Use of monies paid in lieu of sidewalk construction. At a time to be determined by the City Manager and/or Director of Public Works, collected monies in lieu sidewalk construction of shall be used to construct sidewalk in the same address grid quadrant as the property from where the payment was collected if it is not used to construct sidewalk adjacent to said property. [image omitted; see the official code]

(Ord. No. 8895, § 1, 6-9-2020)