§ 7.460 — As-built mylars with engineering certificates
Code of Ordinances of the City of Lee's Summit, Missouri (Codified through Ordinance No. 10423, enacted July 14, 2026 (Supp. No. 56)) · Lee's Summit Unified Development Ordinance § 7.460
Corpus is an independent public-information project, not the official City of Lee's Summit website. Stable reference: corpuslaw.us/code/1469e8f2-46c6-4d5f-acc6-a8e221f2b769
Sec. 7.460. - As-built mylars with engineering certificates.
A. Submittal requirements. As-built mylars must be received by the City before final acceptance of any improvement project. The mylars must include results of a post-construction survey. The post-construction survey shall include the following: 1. Elevation of all sewer structures including pipe inverts and structure top elevations; 2. Final adjusted stationing of all sewer structures and water line valves, hydrants and blow-off assemblies; and 3. Final adjusted contours as shown in the grading plans and master drainage plan. B. Certification. As-built mylars must include a certification by a professional engineer licensed in the State of Missouri stating that the drawings are as-built and conform to construction records and post-construction survey information.
Ask a question about Lee's Summit law
Corpus searches the Lee's Summit sections it holds and shows the ones that match, with their citations. Free, no sign-in.