§ 406.020 — Right-Of-Way Permits
Code of Ordinances, City of O'Fallon, Missouri (Code 2026-10-22) · O'Fallon City Code § 406.020
Corpus is an independent public-information project, not the official City of O'Fallon website. Stable reference: corpuslaw.us/code/e27777b2-4a89-4577-99a9-7a9c7b72de7c
Section 406.020: Right-Of-Way Permits.
A. Application Requirements. 1. Any person desiring to perform ROW work must first apply for and obtain a ROW permit in addition to any other building permit, license, easement, franchise or authorization required by law. In the event of a need for emergency ROW work, the person conducting the work shall as soon as practicable notify the City of the location of the work and shall apply for the required ROW permit as soon as practicable following the commencement of the work, not to exceed the third business day thereafter. The Engineer may design and issue general permits for emergency ROW work for several different locations or throughout the City. 2. An application for a ROW permit shall be submitted to the Engineer. The Engineer may design and make available standard forms for such applications, requiring such information as allowed by law and as the Engineer determines in his or her discretion to be necessary and consistent with the provisions of this Chapter and to accomplish the purposes of this Chapter. Each application shall at a minimum contain the following information for the proposed ROW work, unless otherwise waived by the Engineer: a. The name, address and telephone number of a representative whom the City may notify or contact at any time [i.e., twenty-four (24) hours per day, seven (7) days per week] concerning the work; b. If different from the applicant, the name, address and telephone number of the person or entity owning or operating the facilities in the ROW for which the proposed work is to be performed; c. A description of the proposed work, including a conceptual master plan and an engineering site plan or other technical drawing or depiction showing the nature, dimensions, location and description of the applicant's proposed work or facilities, their proximity to other facilities that may be affected by the proposed work and the number of street crossings and their locations and dimensions, if applicable; (1) If there are areas of established landscaping, irrigation, lighting, or other unusual items that are in the path of excavation, then detailed photographs of these items shall be included. Letters from the owners of these facilities may be needed if they are to be altered in any way. d. Projected commencement and termination dates and anticipated duration of the work or, if such dates are unknown, a representation that the applicant shall provide the Engineer with reasonable advance notice of such dates once they are determined; e. Copies of any required certificates of insurance or performance and maintenance bonds, as outlined in this Chapter. 3. The information required by the application may be submitted in the form maintained by the applicant, provided it is responsive to the application's requirements and the applicant shall be allowed a reasonable amount of time to complete the application based on the amount of data or information requested or required. 4. Each such application shall be accompanied by the following payments: a. An application fee approved by the City to cover the cost of processing the application. b. A deposit for attending the pre-construction meeting. Said fee will be returned upon verification of attendance of the meeting. c. An escrow or bond shall be submitted to the City for restoration purposes. d. Any other amounts due to the City from the applicant, including, but not limited to, prior delinquent fees, costs and any loss, damage or expense suffered by the City because of the applicant's prior work in the rights-of-way or for any emergency actions taken by the City, but the Engineer may modify this requirement to the extent the Engineer determines any such fees to be in good-faith dispute. e. Failure to submit a permit application may result in triple the permit fees being applied. Emergency ROW work is exempt from this condition. 5. Applicants shall participate in any joint planning, construction and advance notification of such work, including coordination and consolidation of any excavation of or disturbance to the rights-of-way as directed by the Engineer. When deemed necessary to accomplish the goals of this Section and to the extent permitted by law, the City reserves the right, when feasible and reasonable, to require the sharing of facilities by ROW users. Applicants shall cooperate with each other and other ROW users and the City for the best, most efficient, least intrusive, most aesthetic and least obtrusive use of the rights-of-way. 6. The Engineer may establish procedures allowing applicants to ascertain whether existing capacity may be available from other persons utilizing the rights-of-way along the intended path of any proposed work. The Engineer shall also maintain indexes of all ROW permits issued, both by the ROW user and by the affected rights-of-way. B. Application Review And Determination. 1. The Engineer shall promptly review each completed application for a ROW permit and shall grant or deny all such applications as provided herein within thirty-one (31) days of receipt thereof. Unless the application is denied, the Engineer shall issue a ROW permit upon determining that the applicant: a. Has submitted all necessary information; b. Has paid the appropriate fees, deposits, and escrow; and c. Is in full compliance with this Chapter and all other City ordinances. The Engineer may establish procedures for bulk processing of applications and periodic payment of fees to avoid excessive processing and accounting costs. 2. It is the intention of the City that interference with, damage to, excavation or disruption of or the placement of facilities within the City's rights-of-way should be minimized and limited in scope to the extent allowed by law to achieve the purposes of this Chapter. When reasonable and necessary to accomplish such purposes, the Engineer may require as alternatives to the proposed ROW work either less disruptive methods or different locations for facilities, provided that any required alternative: a. Shall not result in a decline of service quality; and b. Shall be competitively neutral and non-discriminatory. The Engineer shall justify to the applicant that the required alternative is reasonable and necessary. 3. Upon receipt of an application, the Engineer shall determine whether any portion of the rights-of-way will be affected by the proposed work and whether the interference, disruption or placement of facilities will be more than minor in nature. In determining whether the proposed work is more than minor in nature, the Engineer shall consider the nature and scope of the work, its location and duration and its effect on the rights-of-way, the use thereof and neighboring properties. a. If the applicant can show to the Engineer's reasonable satisfaction that the work involves no interference, disruption, excavation or damage to or only minor interference with the rights-of-way or that the work does not involve the placement of facilities or involves time-sensitive maintenance, then the Engineer shall promptly grant the ROW permit. b. If the Engineer determines that the effect on the rights-of-way will be more than minor in nature and no exemption under the above Subsection (B)(3)(a) or any other provision of this Section applies, the Engineer shall schedule and coordinate the work and grant the ROW permit accordingly. When reasonable and necessary to accomplish the purposes of this Chapter, the Engineer may postpone issuance of a ROW permit and may give public notice of the application in an attempt to identify whether other person(s) intend to do work in the same area within a reasonable period of time, so that all ROW work in the area can be coordinated. Due regard shall be accorded applicants that are required by any law, rule, regulation, license or franchise to provide service to the area defined in the application. (1) For larger excavation projects, total linear footage per permit shall be limited to two thousand (2,000) linear feet and/or twenty (20) open cut/hole areas. ROW work shall be broken up into separate permits to comply with these requirements. Permits may be suspended by the City until the adjacent permits are completed in full, or at least to the point where the restoration work is complete. 4. Each ROW permit issued by the Engineer shall include: a. Projected commencement and termination dates or, if such dates are unknown at the time the permit is issued, a provision requiring the ROW user to provide the Engineer with reasonable advance notice of such dates once they are determined; b. Length of affected rights-of-way, number of road crossings and identification and description of any pavement or curb cuts included in the work; (1) Any proposed road closings or work up against a road requiring narrowing of the road shall include a detailed traffic management plan, in accordance with the Manual of Uniform Traffic Control Devices (MUTCD). c. Information regarding scheduling and coordination of work, if necessary; d. The location of any of the applicant's facilities, both those proposed and existing, and the location of any known facilities owned by another person that may be affected by the proposed work; e. An acknowledgment and representation by the applicant to comply with the terms and conditions of the ROW permit and this Chapter; and f. Such conditions and requirements as are deemed reasonably necessary by the Engineer to protect structures and other facilities in the rights-of-way from damage, to restore such rights-of-way and any structures or facilities, to ensure the reasonable continuity and sight lines of pedestrian and vehicular traffic and to protect property values, the aesthetics of adjoining properties and neighborhoods and the public health, safety and welfare. 5. The Engineer may deny an application, if denial is deemed to be in the public interest, for the following reasons: a. Delinquent fees, costs or expenses owed by the applicant or the ROW user for which the work is to be performed; b. Failure to provide information required by the application or this Chapter; c. Unresolved violations of the provisions of this Chapter or other pertinent and applicable City ordinances by the applicant or ROW user for which the work is to be performed; d. Failure to return the ROW to its previous condition under previously issued ROW permits or after prior excavations by the applicant or ROW user; e. For reasons of environmental, historic or cultural sensitivity as defined by applicable Federal, State or local law; f. Refusal to comply with alternative ROW work methods, locations or other reasonable conditions required by the Engineer; and g. For any other reason to protect the public health, safety and welfare, provided that such denial does not fall within the exclusive authority of the Missouri Public Service Commission or interfere with a ROW user's right of eminent domain of private property and, provided further, that such denial is imposed on a competitively neutral and non-discriminatory basis. In accordance with the foregoing, any wireless telecommunications towers and facilities to be constructed within the ROW shall at a minimum meet the height, visibility, lighting, and fall line limitations and requirements of Article XVIII (Regulations for Wireless Telecommunications Facilities) of Chapter 400, Zoning Code, as applicable to the zoning district in which the towers and facilities would be located. Similarly, other utility facilities to be constructed within the ROW shall at a minimum meet the standards of Article XIX (Utility Facilities Permits and Regulations) of Chapter 400, Zoning Code, as applicable to the zoning district in which the facilities would be located. C. Permit Revocation And Ordinance Violations. 1. The Engineer may revoke a ROW permit without fee refund after notice and an opportunity to cure, but only in the event of a substantial breach of the terms and conditions of the permit or this Chapter. Prior to revocation the Engineer shall provide written notice to the ROW user identifying any substantial breach and allowing a reasonable period of time not longer than thirty (30) days to cure the problem, which cure period may be immediate if certain activities must be stopped to protect the public safety. The cure period shall be extended by the Engineer on good cause shown by the ROW user. A substantial breach includes, but is not limited to, the following: a. A material violation of a provision of the ROW permit or this Chapter; b. An evasion or attempt to evade any material provision of the ROW permit or this Chapter or the perpetration or attempt to perpetrate any fraud or deceit upon the City or its residents; c. A material misrepresentation of fact in the ROW permit application; d. A failure to complete ROW work by the date specified in the ROW permit, unless an extension is obtained or unless the failure to complete the work is due to reasons beyond the ROW user's control; and e. A failure to correct, upon reasonable notice and opportunity to cure as specified by the Engineer, work that does not conform to applicable national safety ordinances, industry construction standards, this Chapter or any other applicable ordinances, provided that City standards are no more stringent than those of a national safety ordinance. 2. Any breach of the terms and conditions of a ROW permit shall also be deemed a violation of this Chapter, and in lieu of revocation the Engineer may initiate prosecution of the ROW user for such violation. D. Exceptions. Projects with a construction plan approved by the City are not required to obtain a separate ROW permit for any work contained in the construction plan approval. City-sponsored capital improvement projects, requiring utility adjustments, are not required to obtain a separate ROW permit for any directly associated adjustments or new facilities.
[R.O. 2008 § 406.020; Ord. No. 5376 § 1, 9-25-2008 ; Ord. No. 6252 § 1, 9-8-2016 ; Ord. No. 6506 , 10-11-2018 ]
Ask a question about O'Fallon law
Corpus searches the O'Fallon sections it holds and shows the ones that match, with their citations. Free, no sign-in.