Section 406.030: Work In The Rights-Of-Way.

A. Jurisdiction, Inspection And Stop Work Orders. 1. All facilities and ROW work shall be subject to inspection by the City and the supervision of all Federal, State and local authorities having jurisdiction in such matters to ensure compliance with all applicable laws, ordinances, departmental rules and regulations and the ROW permit. 2. The Engineer shall have full access to all portions of the ROW work and may issue stop work orders and corrective orders to prevent unauthorized work or substandard work as established in Subsection (G) hereof. Such orders: a. May be delivered personally or by certified mail to the address(es) listed on the application for the ROW permit or the person in charge of the construction site at the time of delivery; b. Shall state that substandard work or work not authorized by the ROW permit is being carried out, summarize the substandard or unauthorized work and provide a period of no longer than thirty (30) days to cure the problem, which cure period may be immediate if certain activities must be stopped to protect the public safety; and c. May be enforced by equitable action in the Circuit Court of St. Charles County, Missouri, and in such case the person responsible for the substandard or unauthorized work shall be liable for all costs and expenses incurred by the City in enforcing such orders, including reasonable attorneys' fees, in addition to any and all penalties established in this Chapter. B. Underground Facilities. 1. In conjunction with the City's long-standing policy favoring underground construction, no person may erect, construct or install new poles or other facilities above the surface of the rights-of-way without the written permission of the City, unless the City's authority has been preempted by State or Federal law. Such permission may be granted through a ROW permit when other similar facilities exist above ground or when conditions are such that underground construction is impossible or impractical, as determined by the City, and when in the City's judgment the aboveground construction has minimal aesthetic impact on the area where the construction is proposed. 2. During installation of facilities and to the extent authorized by law, existing underground conduits shall be used whenever feasible and permitted by the owner thereof. 3. In the case of new construction or property development, the developer or property owner shall give reasonable written notice to other potential ROW users of the particular date on which open trenching will be available for installation of facilities. All such users shall cooperate to the extent possible to expedite the installation of facilities while minimizing disruption to the ROW. C. Aboveground Facilities. 1. The Engineer may designate certain locations or facilities in the ROW to be excluded from use by the applicant for its facilities, including, but not limited to: a. Ornamental or similar specially designed street lights; b. Designated historic areas; c. Facilities, equipment, structures or locations that do not have electrical service adequate or appropriate for the proposed facilities or cannot safely bear the weight or wind loading thereof; d. Facilities, equipment, structures or locations that in the reasonable judgment of the Engineer are incompatible with the proposed facilities or would be rendered unsafe or unstable by the installation; and e. Facilities, equipment, structures or locations that have been designated or planned for other use or are not otherwise available for use by the applicant due to engineering, technological, proprietary, legal or other limitations or restrictions. 2. Aboveground facilities shall be a neutral color and shall not be bright, reflective or metallic. Black, gray and tan shall be considered neutral colors, as shall any color that blends with the surrounding dominant color and helps to camouflage the facilities. Facilities shall be located in such a manner as to reduce or eliminate their visibility. A sightproof landscape screen may be required for any authorized aboveground facilities taller than three (3) feet in height or covering in excess of four (4) square feet in size. Such screening shall be sufficient to reasonably conceal the facility. A landscape plan identifying the size and species of landscaping materials shall be approved by the Engineer prior to installation of any facility requiring landscape screening. The person having facilities within the ROW shall be responsible for the installation, repair or replacement of screening materials. Alternative screening or concealment may be approved by the Engineer to the extent it meets or exceeds the purposes of these requirements. 3. Aboveground facilities shall be constructed and maintained in such a manner so as not to emit any unnecessary or intrusive noise and shall comply with all other applicable regulations and standards established by the City or State or Federal law. 4. If the application of this Subsection excludes locations for aboveground facilities to the extent that the exclusion conflicts with the reasonable requirements of the applicant, the Engineer shall cooperate in good faith with the applicant to attempt to find suitable alternatives, but such alternatives may exceed the cost increase limitation established by Section 406.020(B)(2), and the City shall not be required to incur any financial cost or to acquire new locations for the applicant. D. Relocation Of Equipment And Facilities. 1. In the event of an emergency or where construction equipment or facilities create or are contributing to an imminent danger to health, safety or property, the City may, to the extent allowed by law, remove, re-lay or relocate such construction equipment, or the pertinent parts of such facilities, without charge to the City for such action or for restoration or repair. The City shall attempt to notify the person having facilities within the ROW prior to taking such action, but the inability to do so shall not prevent same. Thereafter, the City shall notify the person having facilities within the ROW as soon as practicable. 2. At the City's direction, all facilities shall be moved underground and the cost shall be solely the obligation of the person having facilities within the ROW (or as otherwise allowed or required by law). 3. At the City's direction, a person having facilities within the ROW shall protect, support, disconnect, relocate or remove facilities, at its own cost and expense, when necessary to accommodate the construction, improvement, expansion, relocation or maintenance of streets or other public works or to protect the ROW or the public health, safety or welfare. 4. A person having facilities within the ROW shall, on the reasonable request of any person and after reasonable advance written notice, protect, support, disconnect, relocate or remove facilities to accommodate such person, and the actual cost, reasonably incurred, of such actions shall be paid by the person requesting such action. The person having facilities within the ROW taking such action may require such payment in advance. 5. Rather than relocate facilities as requested or directed, a ROW user may abandon the facilities if approved by the City as provided in Subsection (F) of this Section. 6. No action hereunder shall be deemed a taking of property, and no person shall be entitled to any compensation therefor. No location of any facilities within the rights-of-way shall be a vested interest. E. Property Repair And Alterations. 1. During any ROW work, the person doing the work shall protect from damage any and all existing structures and property belonging to the City and any other person. Any and all rights-of-way, public property or private property disturbed or damaged during the work shall be repaired or replaced by the person doing the work or the person on whose behalf the work is being done, and such person shall immediately notify the owner of the fact of any damaged property. Such repair or replacement shall be completed within a reasonable time specified by the Engineer and to the Engineer's satisfaction. a. Excavated areas shall be compacted to avoid settling of the excavated areas. Clean soil backfill shall be used in the pits and clean topsoil near the surface to prepare for proper turf restoration, as outlined below. (1) Any disturbance on private property or neatly manicured road rights-of-way shall require sod to be placed on the excavated areas in similar condition. If sections of sod can be removed and replaced in good condition, then that is acceptable. Watering of the sod to ensure survival will be required for a minimum of twenty-one (21) days after placement or replacement. (2) Any other disturbance on road rights-of-way or non-maintained private property shall require seed and straw to be placed and watered for a minimum of twenty-one (21) days after placement, to ensure a good stand of grass has resulted. (3) If work occurs when normal seed and sod is not available or outside of normal growing seasons (November 1 to April 1), then temporary seed will be used (i.e., annual rye, winter wheat, etc.) until the growing season resumes. b. Any disturbed area that contains landscaping, hardscaping, mulch, rocks, boulders, shrubbery, flowers, trees, statues, art, irrigation systems, lighting, and other items shall ensure that these are neatly labeled and moved out of the way to the best extent possible prior to work. Restoration includes repairing and/or replacing these items to the same condition before work began. The ROW user shall take whatever means necessary to document the condition of these items before construction begins. Coordination with the owners of these items may be needed to verify their condition before and after construction. (1) The ROW user may need to hire a third-party professional to mark, repair, replace, or test irrigation, lighting, and other similar items, to verify their condition. 2. Any alteration to the existing sidewalks/trails, curb ramps, streets and curbs, water mains, sewer or drainage system or to any City, State or other public structures or facilities in the rights-of-way required on account of the construction, installation, repair or maintenance of facilities within the rights-of-way shall be made at the sole cost and expense of the owner of such facilities. a. Driving, parking, placement of outriggers, or other impacts to, under, and over sidewalks or curb ramps is strictly prohibited. If there is absolutely no access to the facility without crossing the sidewalk/curb ramp, then the City shall inspect the sidewalk/curb ramp before construction begins and after construction finishes. Any damage or change in slope such that the facility would be made out of ADA compliance will result in the person being required to remove and replace the damaged facilities. F. Removal, Abandonment, Transfer and Relocation of Facilities. 1. If a person having facilities within the ROW installs the facilities within the ROW without having complied with the requirements of this Chapter, or abandons the facilities, the City may require the removal of the facilities, remove the facilities at the expense of the person having facilities within the ROW or require the transfer of the facilities as provided herein. 2. If the City requires removal of the facilities, the person shall obtain a ROW permit and shall abide by all requirements of this Chapter. The liability, indemnity, insurance and bonding requirements required herein shall continue in full force and effect during and after the period of removal and restoration and until full compliance by the person with the terms and conditions of the ROW permit and the requirements of this Chapter. 3. If the person fails to remove the facilities after having been directed to do so, the City may, to the extent permitted by law, have the removal done at the person's expense. Alternatively, the City may permit the abandonment, without removal, of the facilities if the Engineer determines that abandonment is not likely to prevent or significantly impair the future use, repair, excavation, maintenance or construction of the ROW. 4. If the person fails to remove the facilities after having been directed to do so, the City may, to the extent permitted by law, decide that the ownership of the facilities should be transferred to the City or to such person as directed by the City. In either case the owner of the facilities shall submit a written instrument, satisfactory in form to the City, transferring to the City, or to such person as directed by the City, ownership of the facilities. The City may sell, assign or transfer all or part of the facilities so transferred. 5. The City shall not remove or seek to possess or transfer the facilities until thirty (30) days have passed following written notice by the Engineer to the person having facilities within the ROW of the City's intent to so act. The Engineer may choose not to act on good cause shown by the person having facilities within the ROW. G. Standards For ROW Work. 1. Except for emergency ROW work as provided in Section 406.020(A)(1), ROW work shall be performed only upon issuance and in accordance with the requirements of a ROW permit. a. At all times during the work, ROW permits shall be conspicuously displayed or made available upon demand at the work site and shall be available for inspection. b. All projects shall require a preconstruction meeting between the City and ROW user. This meeting may be waived if the ROW user has demonstrated considerable compliance with past projects and ordinances; however, it will be the responsibility of the ROW user to still contact the City to initiate said meeting and obtain a determination. 2. If at any time it appears that the duration or scope of the ROW work is or will become materially different from that allowed by the ROW permit, the ROW user shall inform the Engineer. The Engineer may issue a waiver, an extension or a revised ROW permit or require that the ROW user reapply for a ROW permit in accordance with all requirements of this Chapter. 3. ROW users shall not open or encumber more of the rights-of-way than is reasonably necessary to complete the ROW work in the most expeditious manner or allow excavations to remain open longer than is necessary to complete the work. 4. All ROW work that affects vehicular or pedestrian traffic shall be properly signed, barricaded and otherwise protected at the ROW user's expense. The ROW user shall be responsible for providing adequate traffic control in accordance with the Manual of Uniform Traffic Control Devices (MUTCD) to the area surrounding the work as determined by the Engineer. 5. The ROW user shall perform the ROW work at such times that will allow the least interference with the normal flow of traffic and the peace and quiet of the neighborhood as permitted by the Engineer. Unless otherwise provided by the Engineer in the permit, non-emergency ROW work on arterial and collector streets may not be accomplished during the hours of 7:00 A.M. to 8:30 A.M. and 4:00 P.M. to 6:00 P.M. in order to minimize disruption of traffic flow. 6. The ROW user shall notify the City no less than three (3) working days in advance of any ROW work that would require any street closure or would reduce traffic flow to less than two (2) lanes of moving traffic for more than four (4) hours. Except in the event of emergency ROW work, no such closure shall take place without notice and prior authorization from the City. 7. All ROW work shall be in accordance with all applicable Sections of the Occupational Safety and Health Act of 1970, the National Electrical Safety Code and other Federal, State or local laws and regulations that may apply, including, without limitation, local health, safety, construction and zoning ordinances and laws and accepted industry practices, all as hereafter may be amended or adopted. In the event of a conflict among ordinances and standards, the most stringent ordinance or standard shall apply (except insofar as that ordinance or standard, if followed, would result in facilities that could not meet requirements of Federal, State or local law). 8. All facilities shall be installed and located to cause minimum interference with the rights and convenience of property owners and other ROW users, and the City facilities shall not be placed where they will disrupt or interfere with other facilities or public improvements or obstruct or hinder in any manner the various utilities serving the residents and businesses in the City or public improvements. a. Any installations of utilities in areas of crossing of a City-owned facility will require potholing of the City-owned facility to avoid damage. b. For horizontal directional drilling operations with a bore path that parallels a City-owned facility within four (4) feet, potholing shall be required at the beginning and end of the bore and every fifty (50) feet along the route. c. For horizontal directional drilling operations with a bore path that parallels a City-owned facility within six (6) feet, potholing should be required at the beginning and end of the bore and every two hundred (200) feet along the route. d. Backhoe excavation should not be allowed within two (2) feet of existing facilities. e. If potholing is impractical due to utility conflicts as specified above, then the City-owned storm and sanitary line shall be TVed after construction to confirm no damage was performed before being released from the job. f. If the ROW user failed to pothole as specified and damage is done, then the ROW user is responsible for all damage and restoration incurred, including any reimbursement to the City for expenses the City has incurred due to emergency mobilization and/or repair. 9. All facilities shall be of good and durable quality. 10. All ROW work shall be conducted in accordance with good engineering practices performed by experienced and properly trained personnel so as not to endanger any person or property or to unreasonably interfere in any manner with the rights-of-way or legal rights of any property owner, including the City, or unnecessarily hinder or obstruct pedestrian or vehicular traffic. 11. All safety practices required by law shall be used during ROW work, including commonly accepted methods and devices to prevent failures and accidents that are likely to cause damage, injury or nuisance to the public. 12. Any contractor or subcontractor of a ROW user must be properly licensed under laws of the State and all applicable local ordinances, and each contractor or subcontractor shall have the same obligations with respect to its work as a ROW user would have pursuant to this Chapter. A ROW user: a. Must ensure that contractors, subcontractors and all employees performing ROW work are trained and experienced; b. Shall be responsible for ensuring that all work is performed consistent with the ROW permit and applicable law; c. Shall be fully responsible for all acts or omissions of contractors or subcontractors; d. Shall be responsible for promptly correcting acts or omissions by any contractor or subcontractor; and e. Shall implement a quality control program to ensure that the work is properly performed. 13. A ROW user shall not place or cause to be placed any sort of signs, advertisements or other extraneous markings on the facilities or in the ROW, whether relating to the ROW user or any other person, except such necessary minimal markings approved by the City as necessary to identify the facilities for service, repair, maintenance or emergency purposes or as may be otherwise required to be affixed by applicable law or regulation. 14. Unless otherwise approved in writing by the City, a ROW user shall not remove, cut or damage any trees or their roots within the ROW. 15. Street crossings will be bored unless otherwise permitted by the Engineer. H. Any person performing ROW work shall provide written notice to all property owners within one hundred eighty-five (185) feet of the site at least forty-eight (48) hours prior to any installation, replacement or expansion of its facilities. Notice shall include a reasonably detailed description of work to be done, the location of work and the time and duration of the work. Notifications shall be in the form of door hangers or letters. Additional changeable message boards may be needed depending on the scope of the project or as directed by the City Engineer or his/her designee. I. Restoring And Maintaining The Rights-Of-Way. 1. To complete any ROW work, the ROW user shall restore the ROW and surrounding areas, including, but not limited to, any pavement, foundation, concrete slabs or curbs, screening, landscaping or vegetation, to like prior condition and shall comply with other reasonable conditions of the Engineer. Restoration of the ROW shall be completed within the dates specified in the ROW permit unless the Engineer issues a waiver, extension or a new or revised ROW permit. 2. It shall be the duty of any person making an excavation in the ROW to backfill such excavations and restore the surface in accordance with the City's minimum prescribed standards for such surfaces or the following standards as determined by the Engineer: a. If the excavations are made in the improved portion of the ROW, twelve (12) inches of granular backfill will be placed over exposed facilities and controlled low-strength material (CLSM), also known as "flowable fill," will fill the hole within eight (8) inches of the finished surface for concrete pavements. There will be a plastic membrane placed between the rock base and the CLSM to prevent the material from bleeding into the rock base. The remaining eight (8) inches will be restored by placing a concrete mix that is approved under Section 405.210. (1) For excavations on concrete streets or sidewalks, all removals shall be made joint-to-joint, and the minimum thickness of replaced concrete shall be either to match existing thickness or seven (7) inches, whichever is greater. b. If the excavations are made in the improved portion of an asphalt or combination street, twelve (12) inches of granular backfill will be placed over exposed facilities, and CLSM will fill the hole within nine (9) inches of the finished surface. There will be a plastic membrane placed between the rock base and the CLSM to prevent the material from bleeding into the rock base. The remaining nine (9) inches will be restored by placing a six-inch-thick, concrete mix that is approved under Section 405.210 under a three-inch asphalt concrete lift of type C mix to meet existing grades. (1) Where utility crossings occur on City-owned asphalt streets, the asphalt will be required to be milled and overlaid a distance of ten (10) feet both on either side of the utility (basic patching as defined by saw cutting and repair of the immediate trench area along the road is not allowed). Butt joints will be required at each tie-in point. c. Driveway entrances shall be constructed in accordance with Section 405.210(G). d. Spoil piles shall be placed on sheeting and covered when not in use to minimize disturbance and contamination to the existing turf. e. Streets, sidewalks, driveways and parking lots shall be cleaned at the end of each working day. If disturbed areas are susceptible to runoff traveling onto a paved surface, then siltation control may be required. If the City is required to clean up the paved areas, then a mobilization fee of four hundred dollars ($400.00) will be charged to the ROW user for each occurrence. 3. If a ROW user fails to restore the ROW within the dates specified either by the ROW permit or any extension thereof as granted by the Engineer, the City may take the following actions: a. The City may perform site restoration. The City may also opt to perform site restoration regardless of any failure by the ROW user, in which case the ROW permit, or any amendment or revision thereto; shall note such option. In either event, if the City performs the site restoration, the cost of the restoration shall be paid for out of the bond or escrow, and then the ROW user shall be responsible for reimbursing the City's reasonable actual restoration costs within thirty (30) days of invoice, if the reimbursement exceeds the bond or escrow amount. b. The City may stop work on other aspects of the permit until more sufficient restoration is performed. c. The City may deny issuing any additional permits to the ROW user and/or person(s) having facilities within the rights-of-way until more sufficient restoration is performed. 4. Every ROW user to whom a ROW permit has been granted shall guarantee for a period of one (1) year the restoration of the ROW in the area where the ROW user conducted excavation. Said period shall commence at the date of closeout of the permit. During this period the ROW user shall, upon notification from the Engineer, correct all restoration work to the extent necessary as required by the Engineer. Said work shall be completed within a reasonable time, not to exceed thirty (30) calendar days from receipt of the Engineer's notice unless otherwise permitted by the Engineer. If a ROW user fails to restore the ROW within the time specified, the City may perform the work, and the ROW user shall be responsible for reimbursing the City's reasonable actual restoration costs within thirty (30) days of invoice. The Engineer may extend the cure period on good cause shown. 5. A ROW user shall not be relieved of the obligation to complete the necessary right-of-way restoration and maintenance because of the existence of any performance bond required by this Chapter.

[R.O. 2008 § 406.030; Ord. No. 5376 § 1, 9-25-2008 ; Ord. No. 6506 , 10-11-2018 ]