For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 700.590 — Specifications For Installation Of Sewer Mains, Service And Testing

Code of Ordinances, City of O'Fallon, Missouri (Code 2026-10-22) · O'Fallon City Code § 700.590

Corpus is an independent public-information project, not the official City of O'Fallon website. Stable reference: corpuslaw.us/code/d89a7afd-0d1d-4281-8888-cb35df2ab985

Section 700.590: Specifications For Installation Of Sewer Mains, Service And Testing.

A. The installation of all sewers and services connecting with City Sewer System shall be inspected and approved by the City. It is the responsibility of the general contractor and the owner to establish the proper grade for the basement underground plumbing to the sanitary sewer. Sewer lines and services shall have a minimum ground cover of forty-two (42) inches. The developer's engineer shall provide the City a set of as-built plans and a letter of verification that all sewers and services are properly installed according to the approved plat and meet with the following material specifications. B. Materials. 1. Poly Vinyl Chloride (PVC) Sewer Pipe. a. Conform to American Society for Testing and Materials (ASTM) D 3034. The minimum wall thickness for Poly Vinyl Chloride (PVC) pipe shall conform to Standard Dimension Ratio SDR-35. Pipe bedding shall conform to ASTM D 2321 for Class I materials. However, when PVC sewer pipe is used for a sewer lift station force main installation, tracer wire shall be laid within three (3) inches above the PVC pipe to enable the City to locate pipe. b. Joints. Flexible gasketed joints shall be compression type with a gasket confined in either the spigot end or the bell end of the pipe. Rubber gasket rings shall conform to the requirements of American Society for Testing and Materials (ASTM) D 1869. Gaskets shall be neoprene or other synthetic material. Natural rubber gaskets will not be acceptable. c. Fittings. Fittings defined as the connections suitable for assembly to four (4) inch or six (6) inch house or building sewers shall be saddle-type fittings with stainless steel bands or poly vinyl chloride (PVC) plastic. 2. Ductile-Iron Pipe. a. Conform to Class 51, WW P-421 or American National Institute (ANSI) A21.51. Design of pipe shall be in accordance with ANSI A21.50 laying conditions B or F. b. Joints. Mechanical and push-on joints for ductile iron pipe and fittings shall conform to the requirements of American National Standard Institute (ANSI) A21.11 or WW P521-C. Gaskets shall be neoprene or other synthetic rubber material. Natural rubber gaskets will not be acceptable. c. Fittings. Fittings shall be in accordance with American National Standard Institute (ANSI) A21.10 and shall have a pressure rating of not less than that specified for pipe. Fittings for pipe with push-on joints shall be either mechanical joint or push-on joint. Furnish all specials, taps, plugs and wall fittings as required. 3. Cast Iron Pipe. a. Conform to Class 22 or American National Standards Institute (ANSI) A21.6 or A21.8. Design of pipe shall be in accordance with ANSI A21.1. Minimum wall thickness shall be Class 22 as shown on ANSI A21.6 or A21.8. b. Joints. Mechanical and push-on joints for cast iron pipe fittings shall conform to the requirements of ANSI A21.11. Gaskets shall be neoprene or other synthetic rubber material. Natural rubber gaskets will not be acceptable. c. Fittings. Fittings shall be in accordance with American National Standards Institute (ANSI) A21.10 and shall have a pressure rating of not less than that specified for pipe. Fittings for pipe with mechanical joints shall have a mechanical joint or push-on joints. Furnish all specials, taps, plugs and wall fittings as required. d. Lining And Coating. All cast iron pipe, fittings and specials shall be cement mortar lined in accordance with American National Standards Institute (ANSI) A21.4. Coat all pipe fittings and specials with manufacturer's standard coal tar coating. 4. Vitrified Clay Pipe. a. Provide American Society for Testing and Materials (ASTM) C 700 extra strength pipe and fittings in sizes eighteen (18) inch and smaller. Provide either ASTM C 700 standard strength or extra strength pipe and fittings in sizes twenty-one (21) inch and larger as specified by the owner or engineer. All pipe shall be designed Class B bedding in accordance with ASTM C12, unless otherwise noted on the plans. b. Joints. Flexible gasketed joints for bell and spigot clay pipe shall be compounded of high quality poly urethane plastic bonded to both the bell and spigot ends of the pipe and properly molded and cured to a uniform hardness and compressibility to form a tight compression joint. All bell and spigot joints shall conform to ASTM C 425. c. Fittings. Provide "fittings," if specified, defined as tee or wye connections suitable for assembly to house or building sewers similar to W.S. Dickey Clay Company "Perma-T" and "Perma-Y." 5. Manholes. a. General. Manholes shall conform to the applicable City Standard Drawing which is located for inspection in the files at City Hall. b. Mortar. Mortar and plaster coating for masonry manhole units shall be two (2) parts Portland Cement to one (1) part Masonry Cement to six (6) parts plaster sand mixed with the least amount of potable water necessary to provide a workable mortar. c. Precast Concrete. Precast concrete manholes shall conform to American Society for Testing and Materials (ASTM) C 478 and shall have bases equal to developed base manholes. Joints shall be of material as specified for reinforced concrete pipe joints of a bitumastic material or performed flexible joint sealants applied to accordance with manufacturers recommendations. d. Waterproofing. Waterproofing will be required on the exterior of all manholes. The bitumen shall consist of two (2) coats of asphalt, coal-tar pitch, or a coating meeting American Society for Testing and Materials (ASTM) D-41. Asphalt shall conform to the requirements of ASTM D 449. Coal-tar pitch shall conform to the requirements of ASTM D 450. Coating shall be thirty-one (31) mils thickness. 6. Manhole Castings. a. Cast iron rings and covers shall be the following or approved equal: Clay and Bailey No. 2008, Neenah R-1736 or Deeter 1315. b. Iron Castings. (1) Iron castings shall conform to the requirements of American Society for Testing and Materials (ASTM) A 48, class 25 and shall be of the type shown on the City Standard Drawing. (2) Castings shall be clean and whole, ad without blow or sand holes or any other surface defects which would impair serviceability. Plugging or filling of holes or other defects will not be permitted. (3) Parts fins and pouring gates shall be removed. 7. Bedding Aggregate. All materials used for crushed stone pipe bedding shall conform to the requirements of Midwestern Concrete Industrial Board (MCIB) Bulletin No. 2 for coarse aggregate and shall meet the graduation specified therein under Column III, Table 2, for three-fourth (3/4) inch maximum size aggregate with the following modification: Sieve Size | Percentage Passing No. 4 | 0.5 No. 8 | 0.2 8. Concrete. a. Concrete, whether reinforced or non-reinforced shall conform to specifications or to the requirements as specified on the Plans or on City Standard Drawing. b. Coarse aggregate for concrete shall be limestone obtained from the Bethany Falls Ledge or equivalent, unless prior approval is obtained from the City Engineer for use of another source. Also, the total shale coal and lignite content shall not exceed five-tenths percent (0.5%) and the clay content shall be zero percent. Soundness-Maximum lose shall be ten percent (10%) (American Society for Testing and Materials (ASTM) C88 using Sodium Sulphate - 5 cycles) Los Angeles Abrasion-Maximum loss shall be thirty-five percent (35%) (ASTM C131). 9. Reinforcing Steel. a. Reinforcing steel shall be placed as shown on the plans and shall conform to American Society for Testing and Materials (ASTM) Specifications as follows: b. Bars and rods shall be deformed billet-steel conforming to ASTM, Grade 40. c. Welded wire fabric shall conform to American Society for Testing and Materials (ASTM) A 185, Grade 40. d. Fabricated steel bar and rod mats shall conform to American Society for Testing and Materials (ASTM) A 184. Bar material shall conform to ASTM A 165, Grade 40. e. Smooth bars shall be round carbon steel bars conforming to American Society for Testing and Materials (ASTM) A 306, Grade 60. 10. Pipe Encasement And Collars. a. Concrete. Concrete, whether reinforced or non-reinforced, shall be Midwestern Concrete Industrial Board (MCIB) Mix A 550-1-4. b. Reinforcing. Reinforcing steel used in concrete encasements shall be American Society for Testing and Materials (ASTM) A 615, Grade 40. 11. Tunneling, Boring And Jacking. a. Steel Liner Plate. Steel tunnel liner plates shall be ARMCO "Standard," Commercial Sheaving and Stamping Company "Commercial", Republic "Truscon Paneled Out," or equal and shall be galvanized in accordance with American Society for Testing and Materials (ASTM) A 123. The design and shape of the liner plates shall be such that assembly can take place entirely from within the tunnel liner. The outside diameter shall be four (4) feet and the minimum wall thickness shall be United States Standard Gauge 12 (0.1046 inches). Sufficient sections shall be provided with one and one-half (1½) inch or larger grouting holes, located near the centers, so that when the plates are installed there will be one (1) line of holes on either side of the tunnel and one (1) at the crown. The holes at each line shall not be more than nine (9) feet apart and, unless otherwise approved, shall be staggered. Bolts and nuts shall conform to ASTM A 153, A 308, A 325 and A 449 as applicable. b. Steel Casings. Steel casings for bore or jacked construction shall be steel pipe conforming to American Society for Testing and Materials (STM) A 139 with a minimum diameter as shown on the Plans. Minimum walls thickness shall be in accordance with the following table: Nominal Wall Thickness Diameter of Casing | Under Railroads | All Other Uses 24 inches | 0.406 inches | 0.281 inches 26 inches | 0.438 inches | 0.281 inches 28 inches | 0.469 inches | 0.312 inches 30 inches | 0.469 inches | 0.312 inches 32 inches | 0.500 inches | 0.312 inches 34 inches | 0.500 inches | 0.312 inches 36 inches | 0.500 inches | 0.344 inches Steel shall be Grade B under Railroads and Grade A on all other uses. c. Joints. Steel liner plates shall have bolted joints at both longitudinal and circumferential planes. Stagger longitudinal joints in adjacent rings when assembling. Steel pipe shall have welded joints in accordance with American Water Works Association (AWWA) C 206. C. Installation. 1. Pipe Laying And Jointing. a. Handling. Handle pipe materials and fittings in a manner to ensure installation in sound and undamaged condition. Do not drop to dump. Use slings, lifting bags, hooks and other devices designed to protect pipe, joint elements and coatings. In handling plastic pipe of thirteen (13) feet in length or greater, a double sling will be required unless otherwise approved by the City. Ship, move and store with provisions to prevent movement or shock contact with adjacent units. b. Installation. (1) All work shall be in accordance with the following standards: American Society for Testing and Materials (ASTM) C 12 Installing Vitrified Clay Sewer Pipe; American Society for Testing and Material (ASTM) D 2321; Underground installation of flexible Thermoplastic Sewer Pipe; American Water Works Association (AWW) C 600; Installation of cast iron water mains. Utilize equipment methods and materials insuring installation to lines and grades indicated. Maintain the following tolerance from true alignment and grade: Alignment | 2 inches Grade | ± 1/2inch Joint deflection shall not exceed the maximum allowable deflection, per joint according to American Society for Testing and Material (ASTM) C 425, ASTM C 594, and American Water Works Association (AWWA) C 600. Only one (1) correction for alignment and/or grade shall be made between adjacent manholes. Except where pipe sections are being encased in concrete, no pipe is to be supported by blocks. Accomplish curve alignments with bends, bevels and upper joints. Joint deflection with clay, Poly Vinyl Chloride (PVC), cast iron or ductile iron pipe shall not exceed the maximum allowable deflection per joint according to American Society for Testing and Materials (ASTM) C 425, ASTM C 594 and American Water Works Association (AWWA) C 600. (2) Install pipe of size, material, strength class, and joint type with embedment as shown on the City Standard Drawing and as described within this Standard. In so far as possible, commence laying of downstream end of line and install pipe with spigot or tongue end downstream. Clean interior of all pipe, fittings and joints prior to installation. Exclude entrance of foreign matter during discontinuance of installation. Close open ends of pipe with snug fittings closures. Do not let water fill trench. Include provisions to prevent flotation should water control measure prove inadequate. Remove water, sand, mud and other undesirable materials from trench before removal of end cap. Install pipe only when weather and trench conditions are suitable. Do not lay in water. Brace or anchor pipe as required to prevent displacement after establishing final position. c. Pipe Bedding. The sewer trench shall be carried to a point not less than three (3) inches below bottom of pipe bell. Crushed stone pipe bedding, compacted to fill width of trench, shall then be placed and compacted to bottom of pipe with proper allowance for bell joints. After each length of pipe being laid has been shoved "home" and placed in proper alignment, shall be securely anchored and held in position by crushed stone deposited simultaneously on each side of the pipe. Crushed stone or tamped selected backfill shall extend to a point not less than twelve (12) inches above the top of the pipe bell. If unstable subgrade conditions are encountered and it is determined by the City Engineer that the bedding specified will not provide suitable support for the pipe, additional excavation to the limits determined by the Engineer will be required. This additional excavation shall be backfilled with crushed stone material approved by the City. d. Jointing. (1) General Requirements. (a) Locate joints to provide for differential movement at changes in type of pipe embedment, concrete collars and structures. Support pipe from wall of manhole to first joint in normal sewer trench with concrete cradle structurally continuous with base slab or footing. (b) Clean and lubricate all joint and gasket surfaces with lubricant recommended by pipe manufacturer. (c) Utilize methods and equipment capable of fully homing or making up joints without damage. (d) Check joint opening and deflection for specifications limits. (e) Examine each piece of pipe prior to installation for soundness and specification compliance. (2) Provisions For Jointing Clay Pipe. (a) Conform with American Society for Testing and Materials (ASTM) C 12 Section 8. (b) Handle pipe having premolded joining rings or attached couplings so that no weight, including the weight of the pipe itself, will bear on or be supported by the jointing material. (3) Provisions For Jointing Cast Iron And Ductile Iron Pipe. (a) Conform with American Water Works Association (AWWA) C 600. (b) Paint suspected damaged portions with turpentine and dust with cement to check for cracks. Remove turpentine and cement by washing when crack test is satisfactorily completed. If cracks are found, the pipe shall be rejected. (c) Check gasket position and condition after assembly prior to installation of next pipe section. (4) Provisions For Jointing Poly Chloride (PVC) Pipe. Check gasket position and conditions after assembly prior to installation of next pipe section. (5) Rubber Gasketed Joints. Check gasket position and condition after assembly with feeler gauge prior to installation of next section. Vertical pipe deflection after installation shall not exceed five percent (5%) of the pipe diameter. (6) Cutting. Cut in neat workmanlike manner without damage to pipe. Observe specifications regarding your locations. Smooth cut by power grinding to remove burrs and sharp edges. Repair lining as required and approved. (7) Temporary Plugs. (a) Plugs. Provide and install plugs as manufactured by pipe supplier or as fabricated by contractor if approved. Plugs shall be water tight against heads up to twenty (20) feet of water. Secure plugs in place in a manner to facilitate removal when required to connect pipe. (b) Location. Plugs shall be installed as specified or where shown on plans. Also the open end of the sewer shall be plugged at the end of the work day with a suitable mechanical plug to prevent entry of footage material until work is resumed. (8) Connections To Existing Pipeline And Structures. Connect pipe to existing structures and pipelines where indicated. Observe pertinent articles of specifications pertaining to joint locations. Prepare structure by making an opening with at least two (2) inches clearance all around fitting to be inverted. the concrete structure shall be initially cut with a concrete saw. Opening between pipe and manhole wall shall be filled with an expansive grout in such a manner that a watertight condition will result or by use of a rubber gasket. Manholes to be built on an existing sewer shall be constructed in such a manner as will not disrupt service of the existing sewer. The manhole base, walls and invert shall be completed before the top half of the sewer pipe is cut or broken away. Rough edges of the pipe thus exposed shall be covered with expansive grout, in such a manner as to produce a smooth and acceptable finish. Any portion of the existing sewer damaged by the contractor shall be repaired or replaced at no expense to the City. Connections between different pipe materials shall be made using proprietary transition coupling, unless otherwise specified on the plans. 2. Manholes And Special Structures. a. General. As used herein "special structures" refers to manholes on large sewers, special junction structures, metering stations, siphon and similar structures constructed on the pipeline. Manholes and special structures may be constructed of precast concrete sections in accordance with City Standard Drawing-Edition II, 1990, which is on file in the office of the City Clerk. b. Construction. (1) General. Manholes and special structures shall be constructed at locations indicated and in accordance with details as shown on the plans or City Standard Drawing. However, all manholes shall be constructed above the one hundred-year floodplain elevation as required. (2) Precast Wall And Reducing Cone Sections. Handle with care to avoid damage to joint ends of each section. Damaged sections may be subject to rejection at the discretion of the City Engineer or his/her designee. (3) When using O-Ring joints, care shall be exercised in placing the O-Ring on the spigot end, and lowering the bell section on to the spigot end so that a watertight seal is obtained. (4) When using bitumastic joints, both spigot and bell end shall be primed with solvent material compatible to the adhesive in the mastic. Approved bitumastic materials shall completely fill the joints so that a minimum of one-fourth (1/4) inch bead of material is visible after jointing, to be smoothed off after completion of the jointing operation. (5) When a flexible preformed butyl rubber of bituminous polymer compound with modifiers is used to seal jointed sections of manholes, the extension of sealant from the joint is not required. The vertical spacing between manhole sections shall not exceed one-fourth (1/4) inch. Preformed joint sealers shall remain flexible at temperatures as low as zero degrees Fahrenheit (0° F.). (6) All bitumastic materials or preformed flexible joint sealers shall not be applied to wet or damp surface. (7) Invert Channels. Alignment of the invert channels shall be as shown on the contract drawings. When no specific details and dimensions are given, the changes in flow direction shall be smooth, uniform and made with the longest radius possible. The cross-sectional shape of invert channels shall be steel-trowelled to produce a dense, smooth surface. (8) When filling openings around pipes through the manhole walks, mortar and/or masonry units shall be placed so that the resulting joints are watertight. Mortar used in the joint closure shall not interfere with the invert channel. c. Curing. All masonry, plaster coating and cast-in-place concrete shall be adequately protected from freeing and loss of moisture for the first twenty-four (24) hours. The curing methods and materials to be used shall be approved by the City Engineer, or his/her designate. d. Manhole Rings And Adjusting Rings. All rings for manhole sewers and adjusting rings shall be set to match the existing surfaces, except in flood plans where the plans indicate that the ring is to be set at an elevation higher than existing ground. Each ring shall be set on a full mortar bed of bitumastic material. If masonry units are used to adjust rings to grade, the masonry work shall conform to these rules and regulations. e. Waterproofing. Two (2) coats of an asphalt or coal-tar pitch waterproof coating with a combined thickness of thirty-one (31) mils shall be applied to the exterior on all precast masonry structures from base to manhole ring. The coating shall be applied in sufficient quantity so that no base or thin spots show. The coating shall be applied in sufficient time to permit proper curing prior to backfilling the excavation. Proper methods and materials shall be used during backfilling to prevent damage to the coating. Any damage to the coating which does occur shall be immediately repaired. f. Drop Manholes. A drop shall be built at any manhole where a tributary sewer enters an elevation more than two (2) feet above the manhole invert. Drops shall be as shown on the Standard Drawing. Concrete encasement shall be Class B providing six (6) inches minimum cover around the pipe, and extending out to the face of the bell of the tee in the entering line. 3. Pipe Encasement And Collars. a. General. Total or partial encasement of pipe in concrete shall be used where the required safe supporting strength cannot be obtained by other bedding methods. Concrete encasement shall also be provided at locations to protect public water supplies or where there exists the possibility that standard bedding may be eroded by currents of water under and around the pipe. b. Construction. Concrete encasement shall be constructed at locations indicated and in accordance with details as shown on plans or City standard drawings. Start and terminate encasement at a pipe joint. Suitably support and block pipe to maintain position and prevent flotation. Form to dimensions indicated or construct full width of trench. (1) Joints. If a single section of encasement is not constructed continuously (concrete is not placed in a single deposit), constructed joints shall be provided in the encasement to coincide with pipe joints. Construction joints shall be keyed continuously around the encasement. Longitudinal reinforcement shall be continuous through construction joints. (2) Curing. Concrete encasement shall be protected and cured so as to prevent excessive evaporation of moisture or freezing. (3) Backfilling. Backfill trench only after concrete encasement has obtained a minimum of two thousand (2,000) pounds per square inch (p.s.i.) and can sufficiently support the loads imposed by backfill and backfill operations. 4. Backfill. a. General. (1) Unless otherwise specified, all sewer trenches and excavation around structures shall be backfilled to the original surface of the ground with earth, earth and rock, or other acceptable material. When earth and rock is used, it shall be placed and thoroughly consolidated with sufficient earth to completely fill all voids between the rocks. The contractor shall so sort and stockpile the excavated material so that the proper material is available for backfill. (2) The backfill material shall be compacted to a minimum ninety percent (90%) of optimum density as determined by the Standard Proctor Test. Backfill in street right-of-way shall be compacted to a minimum density of ninety-five percent (95%) of optimum density as determined by the Standard Proctor Test. Backfill material shall be placed and compacted only when its moisture content is between optimum and ± two percent (2%) above or below optimum moisture as determined by American Society for Testing and Materials (ASTM) D-698 Standard. (3) The combination of the thickness of the layer, the method of compaction and the type of compaction equipment used shall be at the discretion of the City Engineer and subject to obtaining the densities as specified above. (4) The quality of the compaction shall be subject to compaction tests when deemed necessary by the City Engineer. It shall be the Contractor's responsibility to make necessary excavation in order to accommodate compaction test at locations specified by the Engineer. The compaction tests will be performed at no cost to the City. If the quality of the compaction does not meet the above requirements, the material will be removed and replaced to meet the above requirements at the expense of the contractor. (5) Commercial sand backfill shall not be used. (6) In areas so designated on the plans, the top soiled as excavated shall be stockpiled and replaced to original elevation, location and depth. (7) Backfill material shall be carefully placed to avoid damage or displacement of sewer or structures. (8) Backfill shall not be placed when material contains frost, is frozen, or a blanket of snow prevents proper compaction tests at locations specified by the Engineer. The compaction tests will be performed at no cost to the City. If the quality of the compaction does not meet the above requirements, the material will be removed and replaced to meet the above requirements at the expense of the contractor. b. Backfill Of Pipe Trenches. (1) The area below a plane twelve (12) inches above the top of pipe bell shall be backfilled in accordance with the Standards for "Pipe Bedding." (2) Backfill shall be made with suitable earth, earth and rock or other acceptable material, except that the top one (1) foot and the area below a plane one (1) foot above the pipe bell shall not contain any excavated rock. When earth and rock is used, the maximum dimension of the rock shall not exceed twelve (12) inches. c. Backfill Around Structure. (1) No backfill shall be placed over or around any structure until the concrete or mortar therein has attached a minimum strength of two thousand (2,000) pounds per square inch (p.s.i.) and twenty-four (24) hours and can sufficiently support tie loads imposed by the backfill without damage. (2) The contractor shall use utmost care to avoid any wedging action between the side of the excavation and the structure that would cause any movement of the structure. Any damage caused by premature backfill or by the use of equipment on or near a structure will be the responsibility of the contractor. (3) Backfill shall be placed and compacted on all sides of the structure simultaneously and operations shall be so conducted that the backfill is always at approximately the same elevation on all sides of the structure. (4) No excavated rock larger than four (4) inches maximum dimension shall be placed within one (1) foot of the exterior surface of any structure. 5. Tunneling, Boring And Jacking. a. Tunnel Cross-Section. Construct circular in cross section of size indicated. Alternate size and shape may be submitted for approval subject to the following: (1) Best suited to proposed method of excavation and lining. (2) Clear cross-sectional area not less than clear area of circular section indicated. (3) Invert at grade consistent with adjoining open cut construction. b. Construction. (1) General. Before starting work, complete details of the method of operation and liner materials to be used shall be submitted to the City Engineer. The cast iron pipe sewer, in the area to be tunneled, bored or jacked, shall be completed before the construction of adjacent portions of the same sewer lateral. The purpose of this requirement is to allow for slight discrepancies in alignment and grade which may occur in the tunneled, bored or jacked installation, so minor adjustments in the adjacent sewer can be made. The maximum allowable deviation in alignment and grade of sewer pipe shall be as shown on the construction plans. (2) Excavation. Excavate by approved methods applicable to materials encountered. Boring operations shall be performed by experienced crews using a rotary type boring machine designed especially for this purpose. Include dewatering and chemical and stabilization for grouting if necessary due to existing field conditions. Conduct excavation in a manner to prevent disturbing the overlaying and adjacent material. (3) Lining. Assemble liner plates immediately following the excavation. Advance casing continuously with excavation. When liner plates are being installed, care shall be taken to maintain alignment, grade and circular shape of the tunnel. All voids between liner and surrounding earth shall be filled with grout forced in under pressure. The grout shall consist of two (2) parts of sand to one (1) part of Portland Cement, mixed with sufficient water to maintain a freely pouring consistency. As the pumping through any hole is stopped, it shall be plugged to prevent the backflow of grout. After lining installation is complete, it shall be cleaned of all debris and all leaks which allow flowing or seeping water into tunnel, shall be stopped. (4) End Seals. Construct end seals after sewer pipe has been permanently placed inside casing, tested and approved. Brick shall be in accordance with American Society for Testing and Materials. (ASTM) C 270. (5) Sand Fill. Fill annular space between lining and sewer pipe with sand complying with graduation as set forth in American Society for Testing and Materials (ASTM) C 33. Fine Aggregate, Midwestern Concrete Industrial Board (MCIB) Bulletin No. 1. Moisture content shall not exceed five-tenths of one percent (0.5%). Fill after sewer pipe has been permanently placed inside casing, tested and approved, in a manner such as not to disturb the alignment and/or grade of the sewer pipe. (6) Lateral End Marking. Lateral sewer service lines shall be laid from the sewer main to the lot line or property line. The end of the lateral shall be properly plugged with a watertight pancake. A two-inch-by-four-inch board shall be installed vertically at the end of the lateral and shall extend to within one (1) foot of the finished ground surface to mark the end of each lateral service line. D. Testing. 1. General. After backfilling over the sewers, the contractor shall lamp all sewer lines. All sewer lines are subject to infiltration, exfiltration and/or air tests as determined by the City Engineer. Immediately prior to conducting a test, the groundwater level shall be determined by auguring a hole adjacent to the pipe and measuring the distance to the water level, or by determining if water is flowing through a one (1) inch diameter pipe installed horizontally through the upstream manhole wall and having a flow line elevation even with the top of the pipe being tested. If a pipe is installed through the manhole wall to determine the water level, the contractor shall seal the pipe with mortar upon completion of the testing. Infiltration tests shall be performed. All other pipe shall be tested by exfiltration tests, or at the option of the contractor, air tests. If any section of pipe passes either the exfiltration or air test as specified below, that section shall be accepted by the City. Each reach of sewer shall meet the requirements of the acceptance tests. All defects shall be repaired to the satisfaction of the City, or his/her designate. Inspection by use of a closed circuit television system may be required where lamping proves to be an unsatisfactory means of inspection. 2. Lamping. Each section of the sewer line between manholes shall be straight and uniformly graded. Each such section will be lamped. Lamping will be performed by the City. The contractor shall furnish suitable assistants to help the City. 3. Exfiltration. Exfiltration tests shall be conducted by blocking off the other openings in the upper manhole and plugging the line where it enters the lower manhole of the reach to be tested, filling the line and the manhole with water [but not more than five (5) feet deep], and measuring the water required to keep the manhole full. The total exfiltration shall not exceed one hundred fifty (150) gallons per inch of nominal pipe diameter per mile of pipe per day for each reach tested. For purposes of determining the maximum allowable leakage manholes shall be considered as sections of forty-eight (48) inch pipe. The exfiltration test shall be maintained on each reach for at least two (2) hours and as much longer as necessary, in the opinion of the City Engineer or his/her designate, to locate all leaks. The contractor shall provide, at his/her own expense, all necessary piping between the reach to be tested and the source of water supply, together with equipment and materials required for the tests. The methods used and the time of conducting the exfiltration tests shall be subject to the approval of the City Engineer or his/her designate. If the leakage in any reach exceeds the allowable maximum, it shall be retested after the leaks are repaired. 4. Infiltration. If at any time the infiltration between two (2) adjacent manholes is observed and measured by the City Engineer or his/her designate, to exceed two hundred (200) gallons per inch nominal pipe diameter per mile of sewer per day, the contractor shall locate the principal leakage and shall make such repairs as are necessary to control the infiltration. The infiltration shall be measured by use of a weir furnished and installed by the contractor. 5. Air. The contractor shall conduct an air test on each reach of sewer between manholes. The air test shall be performed in accordance with the following specifications. a. Equipment. Cherne Air-Loc Equipment as manufactured by Cherne Industrial of Hopkins, Minnesota, or approved equal. Equipment used shall meet the following requirements: (1) Pneumatic plugs shall have a sealing length equal to or greater than the diameter of the pipe to be inspected. (2) Pneumatic plugs shall resist internal test pressure without requiring external bracing or blocking. (3) All air used shall pass through a single control panel. (4) Three (3) individual hoses shall be used for the following connections: (a) From the control panel to pneumatic plugs for inflation; (b) From the control panel to sealed line for introducing the low pressure air; (c) From sealed line to control panel for continually monitoring the air pressure rise in the sealed line. b. Procedures. All pneumatic plugs shall be seal-tested before being used in the actual test installation. One (1) length of pipe shall be held on the ground and sealed at both ends with the pneumatic plugs to be checked. Air shall be introduced into the plugs to twenty-five (25) pounds per square inch (gauge) (psig). The plugs shall hold against this pressure without bracing and without movement of the plugs out of the pipe. After a manhole to manhole reach of pipe has been backfilled, and cleaned and the pneumatic plugs are checked by the above procedures, the plugs shall be placed in the line at each manhole and inflated to twenty-five (25) pounds per square inch (gauge) (psig). Low pressure air shall be introduced into this sealed line until the internal air pressure reaches four (4) pounds per square inch (gauge) (psig). At least two (2) minutes shall be allowed for the air pressure to stabilize. After the stabilization period (3.5 psig minimum pressure in the pipe), the air hose from the control panel to the air supply shall be disconnected. The portion of the line being tested shall be termed "acceptable" if the time required in minutes for the pressure to decrease from 3.5 to 2.5 psig is not less than that shown in the following "Allowable Time Table": ALLOWABLE TIME TABLE Time | | Time Pipe Size(inches) | Min. | Sec. | Pipe Size(inches) | Min. | Sec. 6 | 2 | 15 | 36 | 17 | 00 7 | 3 | 18 | 42 | 19 | 50 8 | 3 | 57 | 48 | 22 | 40 10 | 4 | 43 | 54 | 25 | 30 12 | 5 | 40 | 60 | 28 | 20 15 | 7 | 5 | 66 | 31 | 10 18 | 8 | 30 | 72 | 34 | 00 21 | 9 | 50 | 84 | 39 | 40 24 | 11 | 20 | 96 | 47 | 00 27 | 12 | 45 | 103 | 51 | 00 30 | 14 | 10 Due to the danger of a plug deflating, and shooting out of the pipe, the contractor shall not allow any person to enter a manhole adjacent to a reach of pipe being tested while the reach is under air pressure. The manholes shall be inspected visually and all leaks repaired to the satisfaction of the City. If the air leakage in any reach exceeds the allowable, it shall be retested after the leaks are repaired.

[R.O. 2008 § 700.590; R.O. 2007 § 700.590; Ord. No. 1810 Art. II § 4, 4-18-1990 ]

Ask a question about O'Fallon law

Corpus searches the O'Fallon sections it holds and shows the ones that match, with their citations. Free, no sign-in.