§ 36-151 — Prefabricated assemblies evaluation and follow-up inspection services
Code of the City of Springfield, Missouri (Supp. No. 23, Update 2: codified through G.O. No. 6973, enacted January 12, 2026) · Springfield, Mo., Land Development Code § 36-151
Corpus is an independent public-information project, not the official City of Springfield website. Stable reference: corpuslaw.us/code/1d06acf0-d90d-4ffb-9268-aec6acac383e
Sec. 36-151. - Prefabricated assemblies evaluation and follow-up inspection services.
Prior to the approval of a prefabricated construction assembly having concealed systems and the issuance of a mechanical, plumbing, fuel gas, electrical, and private sewage disposal permit, the building official shall require the submittal of an evaluation report on each prefabricated construction assembly, indicating the complete details of the mechanical, plumbing, fuel gas, electrical and private sewage disposal system, including a description of the system and its components, the basis upon which the system is being evaluated, test results and similar information, and other data as necessary for the building official to determine conformance to this code. (1) Evaluation service. The building official shall designate the evaluation service of an approved agency as the evaluation agency, and review such agency's evaluation report for adequacy and conformance to this code. (2) Follow-up inspection. Except where ready access is provided to mechanical, plumbing, fuel gas, electrical, and private sewage disposal systems, service equipment, and accessories for complete inspection at the site without disassembly or dismantling, the building official may conduct the in-plant inspections as frequently as necessary to ensure conformance to the adopted codes and ordinance. The inspection agency shall furnish the building official with the follow-up inspection manual and a report of inspections upon request, and the mechanical system shall have an identifying label permanently affixed to the system indicating that factory inspections have been performed. (3) Test and inspection records. Required test and inspection records shall be available to the building official at all times.
Ask a question about Springfield law
Corpus searches the Springfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.
