For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 26-45 — Preliminary plat—Major subdivisions

Code of Ordinances of the City of St. Joseph, Missouri (Codified through Ordinance No. 3140, enacted February 2, 2026. (Supp. No. 8)) · St. Joseph Code of Ordinances § 26-45

Corpus is an independent public-information project, not the official City of St. Joseph website. Stable reference: corpuslaw.us/code/f7b2591c-e610-4de0-b9ff-caf56a528146

Sec. 26-45. - Preliminary plat—Major subdivisions.

(a) Submittal requirements. Following the preapplication conference, applicants for major subdivision approval may prepare and submit a preliminary plat to the director. The preliminary plat shall be in sufficient detail to convey the applicant's ideas and intentions in platting the proposed subdivision. It shall contain a written description of the existing conditions on the tract and the necessary drawings and sketches as required by this section to convey the applicant's plan of development. (b) Filing procedure. The applicant shall file the following with the director, at least 45 days prior to the regular commission meeting at which the preliminary plat is to be considered: (1) A digital copy of the proposed preliminary plat; (2) A digital copy of all other information required by this section; and (3) The applicable plat review fee and application. (c) Application date. (1) The director shall review the plat and other information and documentation submitted by the applicant and, within ten working days, determine if the application as submitted is complete. (2) If the application is determined to be complete, the director shall so notify the applicant by certified mail and shall forward the application to the commission for review at its next regularly scheduled meeting. (3) If the application is determined to be incomplete, the director shall return the application to the applicant with a written explanation specifying the additional information required to be submitted to complete the application. Notice of completeness/incompleteness shall be mailed by certified mail to the applicant not more than ten working days after submission by the applicant of the preliminary plat and required accompanying information as set forth in these regulations. (4) At any time during the review process but prior to submission of the application to the commission, the subdivision review committee shall review and comment upon the application. (5) For the purposes of these regulations, the date of the regular meeting of the commission, including any adjourned date thereof, at which time a complete preliminary plat is reviewed shall constitute the official submittal date of the plat. The 60-day period specified in RSMo 89.420 for formal approval or disapproval of the plat will commence from the official submittal date of the preliminary plat. (d) Contents. Preliminary plats for major subdivisions shall include all of the information items required by Section 26-44 plus the following: (1) Layout and width of right-of-way and cross sections showing surfacing of all streets and public ways proposed for the subdivision; horizontal and vertical profiles showing alignment of all streets and proposed street names. (2) If it is contemplated that the subdivision will be developed in phases, the following additional information shall be required: a. A description of each of the proposed phases of development, with each phase clearly identified on all maps, drawings and plans. b. The location of any and all temporary improvements for safe ingress and egress and access to all areas of each phase or phases of development on all maps, drawings and plans. c. Each phase shall provide for the logical progression of streets and utilities, including but not limited to, sanitary sewers, stormwater management, electric, water, gas, cable television and street lighting. Nothing in this section shall be construed to prohibit the combination of any or all phases of development into one phase, or fewer than originally planned. Any temporary improvements that are no longer necessary solely due to the combination of two or more phases need not be constructed, provided the combined phases proposed meet the standards identified in subsection (d)(2)b. above. (e) Action on the preliminary plat—Public hearing. Within 60 days after the submission of a complete preliminary plat to the commission, the commission shall hold a public hearing on the preliminary plat application. Notice of the hearing shall be published at least one time in an official newspaper or newspaper of general circulation in the city at least 15 days before the hearing. Notice by publication shall be the responsibility of the city. Written notice of the date, place, time and general subject of the hearing shall be mailed to the owners of record of all land within 185 feet of the perimeter boundary of the proposed subdivision. Notice by mail shall be the responsibility of the city; provided, however, that it shall be the responsibility of the applicant for subdivision approval to provide the city with the list of property owners of record to be noticed. The applicant shall be solely responsible for the accuracy of the list. Notice shall be mailed not less than 15 days before the hearing. The failure of a property owner to receive such notice by mail shall not be grounds for invalidating any action taken by the commission at the hearing. (f) Commission recommendation. Following the hearing, but still within 60 days of submission of the complete preliminary plat, the commission shall make a recommendation to approve, to disapprove or to approve with conditions the preliminary plat and shall submit such recommendation to the council. The commission, with the consent of the applicant, may extend the 60-day period. (g) Guidelines for commission recommendation. The commission shall consider the following criteria in making a recommendation on the preliminary plat: (1) The plat substantially conforms with an approved sketch plat reviewed in the preapplication conference. (2) The plat conforms to these regulations and the applicable provisions of the zoning ordinance and other land use regulations. (3) The plat represents an overall development pattern that is consistent with the goals and policies of the comprehensive plan, the major street plan, the official map, the capital improvements program and any other applicable planning documents adopted by the city. (4) The development shall be laid out in such a way as to result in: a. Good natural surface drainage to a storm sewer or a natural water course. b. A minimum amount of grading on both cut or fill and preservation of good trees and other desirable natural growth. c. A good grade relationship with the abutting street(s), preferably somewhat above. d. Adequate width for the type and size of dwellings contemplated, including adequate side yards for light, air circulation, access and privacy. e. An adequate depth for outdoor living space. f. Generally regular shapes, avoiding acute angles and breaks in property lines. g. Favorable building location not requiring excessive grading, footings or foundation walls, to the extent practicable. h. Mitigation of adverse affects of excessive shadow, noise, odor, traffic, drainage and utilities on neighboring properties. (5) The plat contains a parcel, lot and land subdivision layout that is consistent with good land planning and site engineering design principles. (6) The location, spacing and design of proposed streets, curb cuts and intersections are consistent with good traffic engineering design principles. (7) The plat is served, or will be served at the time of development, with all necessary public utilities, including, but not limited to, water, sewer, gas, electric and telephone service. (8) The plat is served, or will be served at the time of development, with all necessary public facilities at appropriate levels of service standards as may be established in the comprehensive plan, major street plan and other documents. Such facilities include, but are not limited to, streets, fire protection, police protection, emergency medical services, schools, parks, recreation and open space and libraries. (9) The plat shall comply with the stormwater regulations of the city and all applicable storm drainage and floodplain regulations to ensure the public health and safety of future residents of the subdivision and upstream and downstream properties and residents. The commission shall expressly find that the amount of off-site storm water runoff after development will be no greater than the amount of off-site storm water runoff before development. (10) Each lot in the plat of a residential development has adequate and safe access to/from a local street. If lot access is to/from a collector or arterial street, the commission shall expressly find that such access is safe and that no other lot access or subdivision configuration is feasible. (11) The plat will be laid out and developed in a manner that is sensitive to environmental features and/or characteristics of the tract or parcel including, but not limited to, topography, slope, soils, geology, hydrology, floodplains, wetlands, vegetation and trees. If a proposed plat will require extensive grading, soil removal, fill, cuts and/or removal of mature trees, the commission shall expressly find that such actions represent the minimum necessary for safe and efficient use of the tract or parcel and that no other lot layout would be more effective at preserving environmental features and/or characteristics. Where extensive grading, soil removal, fill, cuts and/or removal of mature trees is proposed by the applicant, the commission shall urge the applicant to consider cluster or planned development to obtain the same number of lots but without environmental damage. (12) The plat is located in an area of the city that is appropriate for current development activity and which will not contribute to sprawl and leapfrog development patterns nor to the need for inefficient extensions and expansions of public facilities, utilities and services. (13) If located in an area proposed for annexation to the city, the area has been annexed prior to, or will be annexed simultaneously with, plat approval. (14) The applicant agrees to dedicate land, right-of-way and easements, as may be determined to be needed to effectuate the purposes of these regulations and the standards and requirements incorporated herein. (15) All relevant and applicable submission requirements have been satisfied in a timely manner. (16) Improvements may include any necessary upgrades to the adjacent existing roads and facilities to current standards and shall include dedication of adequate right-of-way to meet the needs of the city's transportation plan. (h) Recommendation of disapproval. If the commission recommends disapproval of the preliminary plat, the grounds for such recommendation shall be made a matter of record. (i) City council. Following action by the commission, the council shall review the application and the recommendation of the commission and either approve, conditionally approve or disapprove the preliminary plat. The council shall base its review and decision on the criteria listed in subsection 26-45(g) herein and such other factors as it deems relevant and applicable. (1) If the preliminary plat is approved without conditions and meets the requirements of a final plat, the plat shall be considered to be an approved final plat and shall be subject only to the council's acceptance of all required dedications, and may be filed and recorded pursuant to subsections 26-46(h) and (i). (2) If the preliminary plat is approved with conditions, the applicant shall meet or arrange to meet the conditions and then proceed with the final plat approval process pursuant to Section 26-46. (3) If the preliminary plat is disapproved, the city clerk shall, within ten days of the council action, record the reasons for disapproval in the minutes of the city council meeting, notify the applicant in writing of the action and the reasons therefor and return the preliminary plat to the applicant. (j) Effect of preliminary plat approval. Preliminary plat approval shall confer upon the applicant, for a period of two years from the date of approval, the right to proceed to final plat approval and to develop the subject tract or parcel pursuant to the terms and conditions pursuant to which the preliminary plat approval was granted by the city. The two year period may only be extended by the commission and only if the applicant has applied in writing for an extension and the commission determines that a longer period should be granted due to unusual circumstances. If no final plat on any portion of a subdivision for which preliminary approval has been granted is approved within said two year period, or such longer period as the commission may expressly allow, a re-submission of the preliminary plat (or a revised preliminary plat) shall be required pursuant to the then current subdivision regulations and any other applicable land use regulations or requirements. After approval of the preliminary plat, the applicant may proceed to prepare and file a construction plan as may be required for all public facilities and utilities to be provided, and may submit the proposed final plat to the commission for action.

(Code 1969, §§ 20-4, 20-8; G.O. 1264, 2-13-95; G.O. 1438, 7-29-96; G.O. 1766, 5-15-00; G.O. 2081, 3-14-05; G.O. 3013, 11-29-21)

Ask a question about St. Joseph law

Corpus searches the St. Joseph sections it holds and shows the ones that match, with their citations. Free, no sign-in.